Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Installation and Wiring Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the installation of electrical systems, covering conduits, wiring, lighting, and power distribution components within a construction project. It is a subcontract opportunity specifically set aside for small businesses under the SBA Total Small Business Set-Aside program (FAR 19.5), indicating a focus on promoting small business participation. The contract falls under the NAICS code 238210, which pertains to electrical contractors and other wiring installation. The solicitation was posted on June 15, 2026, with a response deadline of June 27, 2026. The work is to be performed in San Bernardino, and the contracting agency is the Department of Agriculture through the Csa Northwest 2 Usda-Fs office. While some details such as exact agency office addresses and points of contact are not provided, interested parties can access more information through the official SAM.gov workspace link. This opportunity represents a specific electrical installation subcontract aimed at qualified small business entities in the designated region.

General Info

Electrical installation subcontract for small businesses, USDA, San Bernardino, response due June 27, 2026.

Agency

Department Of Agriculture → Csa Northwest 2 Usda-FsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

San Bernardino, CA, USA

Set-Aside

SBA

Documents

This scope was carved out of 127EAU26Q0062.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Rental of Prime Generator, San Bernardino National Forest Supervisor's Office

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Northwest 2 Usda-Fs
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Csa Northwest 2 Usda-Fs
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical systems including conduits, wiring, lighting, and power distribution for the construction project.

More opportunities from Department Of Agriculture → Csa Northwest 2 Usda-Fs

Same awarding agency

NAICS: 332312
New
Federal
Silver Creek Trail Bridge Supplies
Solicitation # 1240BD26Q0082
Solicitation 1240BD26Q0082 is a firm-fixed-price request for quotations issued by the USDA Forest Service for the design and fabrication of prefabricated steel bridge components for a 65-foot pedestrian and stock bridge at Silver Creek. This total small business set-aside is categorized under NAICS code 332312 for Fabricated Structural Steel Manufacturing. The scope includes the design and fabrication of a steel bridge superstructure and optional steel rail posts, requiring the use of weathering steel and adherence to AASHTO and AISC standards. The project must be designed by a registered professional engineer licensed in Washington state or the fabricator's home state. Delivery is specified as FOB Destination to the Koma Kulshan storage yard. The acquisition has undergone four amendments to clarify delivery timelines and technical requirements. While the original desired delivery date was April 30, 2027, subsequent amendments updated the latest acceptable date to June 30, 2027. Offerors must confirm their ability to meet this deadline or propose a guaranteed alternative. Technical clarifications allow for the splicing of steel girders to accommodate helicopter lift constraints, with a preference for pieces weighing under 4,000 lbs. Award will be granted to the highest technically rated offeror, provided the price is fair and reasonable, past performance is acceptable or neutral, and the schedule is compliant. The submission deadline is September 15, 2026, at 1:00 PM Pacific.
Fabricated Structural Metal Manufacturing

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 561720
Federal
Cabin Cleaning, Olympic National Forest
Solicitation # 1240BD26Q0008
Solicitation 1240BD26Q0008 is a request for quotations for a firm-fixed price, performance-based commercial services contract to provide custodial cleaning for three recreation cabins—Louella, Interrorem, and Hamma Hamma—located within the Olympic National Forest across Clallam, Jefferson, and Mason Counties, Washington. This acquisition is a total small business set-aside under NAICS code 561720. The contract structure consists of a base year running from December 1, 2026, through November 30, 2027, with four subsequent 12-month option years, totaling a potential duration of 60 months. The contractor is responsible for providing all personnel, supervision, tools, and materials necessary to maintain the cabins to a standard defined as being free of dirt, dust, odors, and other residue. Key requirements include the use of USDA-approved bio-based custodial products, with safety data sheets and product lists due within 14 days of award. The contractor must also submit a work plan and contract manager contact information within the same timeframe. Performance will be monitored by a Contracting Officer's Representative using a Quality Assurance Surveillance Plan and specific Acceptable Quality Levels. Evaluation for award will be based on best value, considering price, years of janitorial experience, project history from the last three years, available resources, and staffing qualifications. Quotations must be submitted via email by October 10, 2026, and must include separate attachments for past performance, technical capability, and pricing.
Janitorial Services

POSTED

16 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS