Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Installation (Structures)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
LED Lighting & Occupancy Sensor Upgrade @ Batavia SPC
Solicitation # 70CMSW25R00000011
The LED Lighting and Occupancy Sensor Upgrade project for the Batavia Service Processing Center involves the removal and disposal of existing fluorescent light fixtures, lamps, and ballasts, and the installation of energy-efficient LED lighting fixtures and occupancy sensors. The scope includes all necessary labor, supervision, equipment, materials, and testing, with a requirement to provide 5% attic stock. The project must be completed within 180 calendar days from the notice to proceed and must comply with the National Electrical Code, the International Building Code, the Americans with Disabilities Act, and American Correctional Association standards. Key deliverables include a Quality Control Plan within 15 days of award, a site survey within 30 days of award, and product submittals within 30 days following the site survey. Acceptance is based on 98% of all fixtures and sensors being fully operational, supported by a detailed spreadsheet verifying 100% testing of all controls. The contractor is responsible for providing a commissioning report within 10 days of testing completion, as well as as-built drawings and warranty documentation at project closeout. This contract is subject to the Davis-Bacon Act for prevailing wage rates in Genesee County, New York, and requires adherence to OSHA safety standards.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 3 days
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is seeking a Firm-Fixed-Price task order under an 8(a) MACC IDIQ for the replacement of two emergency generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves removing two existing units and installing one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures and anchored to existing concrete slabs. The scope includes the installation of two new NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of generator load tests. The estimated magnitude of the project is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, a feasible program implementation plan, and a robust quality control and safety program. Contractors must comply with the Buy American Act and adhere to Davis-Bacon prevailing wage rates for building construction in Puerto Rico. Key administrative requirements include the submission of certified payroll with electronic invoicing via the Invoice Processing Platform, the provision of performance and payment bonds, and strict adherence to security protocols, including the signing of non-disclosure agreements and obtaining PIV cards for personnel. Work is scheduled for regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the U.S. Virgin Islands. These units will serve as high-security, environmentally controlled spaces for forensic science technicians and must include A.C., electrical outlets, lighting, insulation, vinyl flooring, four security windows, and a steel door equipped with a Cypher lock. The offices are to be installed on 3k PSI reinforced concrete slabs measuring 42' x 10' x 6" with #4 rebars and connected to the nearest electrical circuit via 2-inch PVC or uPVC conduit. Each unit must also be equipped with a fire extinguisher. The project has an estimated magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price among qualified offerors who meet technical and safety requirements. Contractors must comply with the Buy American Act, adhere to the VI20260001 wage determination for prevailing wages, and ensure all personnel sign the required DHS Non-Disclosure Agreements. Project management requirements include submitting a detailed schedule within 15 days of the Notice to Proceed and utilizing the Invoice Processing Platform for electronic payments accompanied by certified payroll. All work must meet NFPA 70 and International Building Code standards.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC), acting as the operator for the Inland Empire Job Corps Center, is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the facility in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW units. All new devices must be integrated into the existing system and undergo complete functional testing. The project is estimated between 0 and 25,000 dollars, with a performance period of 90 consecutive business days following the notice to proceed. Bids are due by September 16, 2026, and will be evaluated based on overall best value. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238210. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to California prevailing wage determinations. For bids of 25,000 dollars or more, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. Awardees must provide a Unique Entity ID (UEI) and complete the MTC Supplier Packet. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by the center and government representatives.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract entails the full installation of electrical systems across all new structures, covering essential components such as service panels, lighting fixtures, outlets, grounding systems, and seamless integration with the existing school electrical grid. The work must comply with all relevant electrical codes and standards to ensure safety, functionality, and long-term reliability of the systems within the facility. Subcontractors are expected to provide complete turnkey solutions, including materials, labor, and coordination with other trades to meet project timelines and quality expectations. Bids for this subcontract opportunity, classified under NAICS code 238210 for electrical contracting, are due by May 27, 2026, and were posted on May 6, 2026. The contract is administered by the Vermont Division of the Department of Economic Development, and while specific location details are not provided, the work is tied to school infrastructure. Potential bidders should review the official posting via the provided link to confirm all requirements, technical specifications, and submission guidelines before the deadline.

General Info

Installation of electrical systems for new school buildings, ensuring safety, standards compliance, and integration.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73714.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REQUEST FOR PROPOSAL Burlington High School Woodchip Plan Addition and Garage Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of full electrical systems for all new structures, including service panels, lighting, outlets, grounding, and connections to the existing school grid.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS