Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electrical Power Systems Analysis & Modeling

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Electrical Power Systems Analysis and Modeling involves providing advanced electrical engineering analyses for prime contractors on RCES electrical infrastructure projects. The selected provider will be responsible for conducting load flow, short circuit, motor starting, voltage drop, harmonic, and arc flash analyses using industry-standard software such as ETAP, SKM, or EasyPower. All work must strictly adhere to IEEE, NFPA 70E, and NEC standards, and the contractor must hold a Professional Engineering licensure to be eligible. The project deliverables include comprehensive analysis reports and modular electrical system model files. This opportunity is managed by the Utilities Services Department of Central Florida Tourism Oversight District under NAICS code 541330. The solicitation was posted on July 17, 2026, with a response deadline of September 18, 2026.

General Info

Licensed PE providing electrical power systems analysis and modeling for RCES infrastructure projects.

Agency

California → Utilities Services Department of Central Florida Tourism Oversight DistrictView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of LOI# C007105.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Modeling of the Epcot Energy Plant Electrical System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities Services Department of Central Florida Tourism Oversight District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Utilities Services Department of Central Florida Tourism Oversight District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs advanced electrical engineering analyses for prime contractors on RCES electrical infrastructure projects. Conducts load flow, short circuit/fault, motor starting, voltage drop, harmonic, and arc flash analyses using ETAP, SKM, or EasyPower software. Adheres to IEEE, NFPA 70E, and NEC standards. Requires Professional Engineering (PE) licensure. Delivers modular electrical system model files and comprehensive analysis reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
Design / Engineering for Microgrid System and DC fast charger
Solicitation # PE-64458-NONST-2027-000000037
The City of Decatur is seeking qualified professional engineering firms to provide turnkey services for the design, bid assistance, and construction administration of a microgrid system and DC fast charger for electric vehicles at the Decatur Police Department located at 420 West Trinity Place. The project involves integrating a solar photovoltaic generation system and a battery energy storage system designed to optimize renewable energy and peak demand management during normal grid-connected operations, while ensuring critical loads remain operational during emergency grid-islanded conditions. The selected consultant will be responsible for delivering complete design plans for bidding and providing construction administration through installation, commissioning, testing, and interconnection with Georgia Power. This solicitation, posted on September 11, 2026, requires proposals to be submitted by October 13, 2026. The project is funded by the City and a Department of Energy grant, necessitating strict compliance with Build America, Buy America (BABA) requirements and federal regulations. Awarded firms must maintain a non-discrimination policy and carry an umbrella insurance policy of at least 5 million dollars. Evaluation is based on a 100-point weighted system, and the expected project start date is November 2026, following coordination with Georgia Power. Payment will be made monthly based on progress reports and invoices submitted to the City Manager.
City of Decatur

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Utilities Services Department of Central Florida Tourism Oversight District

Same awarding agency

NAICS: 561730
SLED
Mowing and Weed Control Services- Rapid Infiltration Basins
Solicitation # C007111
The Central Florida Tourism Oversight District is seeking a qualified contractor for a three year contract, with an optional two year renewal, to provide mowing and weed control maintenance for its Rapid Infiltration Basins. The scope of work includes weekly mowing from March through September and bi-monthly mowing from October through February for all grass areas within the basins and non-solar grass areas, totaling 39 cycles per year. Maintenance requirements also include twice-monthly soil aeration of sand bottoms at depths of 6 to 12 inches, tree pruning for equipment access, and monthly storm-related tree maintenance on chain link fences. Weed control involves 28 annual herbicide applications to the basins and eight compliance wells, utilizing Roundup for meter sets and top liners and Rodeo for the bottom liners. Contractors are prohibited from driving utility vehicles on the HDPE liners and are liable for any resulting damages. The contract will be awarded to the lowest responsive and responsible bidder based on combined pricing for all line items. Compliance requires adherence to strict insurance standards, including commercial general liability and pollution liability, as well as the submission of affidavits regarding conflicts of interest, public entity crimes, human trafficking, and restrictions on foreign countries of concern.
Landscaping Services

POSTED

9 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
SLED
Rapid Infiltration Basins (RIBS) Rehabilitation: Three-Year Phasing
Solicitation # C007144
The Rapid Infiltration Basins (RIBS) Rehabilitation project, issued by the Utilities Services Department of the Central Florida Tourism Oversight District under solicitation ITB #C007144, is a three-year phased initiative to rehabilitate deteriorated RIBs. The scope of work involves the removal and disposal of existing 45 mil Hypalon liners and the installation of new 60 mil HDPE liners, including necessary earthwork, grading, and the excavation and backfilling of anchor trenches. The project is divided into three fiscal year phases: FY 2027 covers cells 66 through 70, FY 2028 covers cells 48, 49, 50, 52, and 53, and FY 2029 covers cells 57, 58, 60, 71, and 72. Additional requirements include the installation of new batten bars where necessary, concrete work via an allowance amount, and the sodding of berm tops and exterior slopes. The contract will be awarded to the lowest bidder of all items. Bidders must comply with strict administrative and legal requirements, including the submission of affidavits regarding conflicts of interest, public entity crimes, human trafficking, and restrictions on entities from foreign countries of concern. Successful vendors must adhere to comprehensive insurance and indemnification standards, maintaining specific coverage for general liability, automobile, workers compensation, and pollution liability with providers rated A- or better by AM Best. The agreement is governed by the District's general terms and conditions, which establish the legal framework for bid submission, vendor liability, and independent contractor status.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 19 days
View Details
NAICS: 541330
SLED
Modeling of the Epcot Energy Plant Electrical System
Solicitation # LOI# C007105
The Central Florida Tourism Oversight District, in coordination with Reedy Creek Energy Services, is seeking a qualified engineering firm to develop a comprehensive electrical system model of the EPCOT Energy Plant. The primary objective is to create a detailed snapshot of the current operational system, including primary feeders, medium-voltage buses, and chiller units, to benchmark current conditions and evaluate future performance under various load growth and renovation scenarios. The selected consultant will be responsible for designing, testing, and documenting the model using an industry-recognized software platform, ensuring it is structured for future modular expansion. The scope of work includes conducting a virtual kickoff workshop, performing attribute validation, and executing critical analyses such as load flow, short circuit/fault, motor starting, voltage drop, harmonics, and arc flash hazards. Key deliverables consist of the complete model files, technical reports for each analysis, a summary of findings and recommendations, and updated one-line diagrams. The contract will be awarded to the most advantageous proposer based on a weighted evaluation of team qualifications, technical approach, relevant experience, and past performance. Compensation will be determined through a negotiated fixed-fee agreement following the selection process.
Engineering Services

POSTED

about 2 months ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS