Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on January 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Elevator Replacement and Modernization

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333922
New
DIBBS
CONVEYOR, ROLLER, GRA
Solicitation # SPE8EF-27-T-0307
Solicitation SPE8EF-27-T-0307 is a request for quotations issued by the Defense Logistics Agency Troop Support Construction and Equipment Manufacturing and Construction for the procurement of 12 gravity roller conveyors, identified by NSN 3910-00-260-0171. The requirement includes a First Article Testing (FAT) mandate, requiring the delivery of two units to Warner Robins ALCMC for government approval. The government will add a testing cost of 7,000 dollars to the offered price when evaluating quotes. Delivery is required within 342 days after order, with a need ship date of December 21, 2026, and a final required delivery date of November 13, 2027, delivered FOB Origin to DLA Distribution Warner Robins in Georgia. The contract mandates strict adherence to technical and quality requirements from the DLA Master List, with packaging following ASTM D3951 and marking complying with MIL-STD-129 and MIL-STD-130N. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, the procurement is subject to ITAR or EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification and completed specialized training. Additionally, offerors must comply with the Buy American Act, Berry Amendment, and CMMC Level 2 cybersecurity standards. Quotes must be submitted via the DIBBS system, and payment will be processed electronically through Wide Area WorkFlow.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

4 days ago

DEADLINE

in 7 days
NAICS: 333922
New
SLED
RFQ - AUTOMATED MATERIALS HANDLER SORTER - POWAY BRANCH LIBRARY
Solicitation # 13476
The County of San Diego is soliciting quotes for the procurement and installation of an Automated Materials Handling (AMH) sorter for the Poway Branch Library. The project involves the delivery, installation, and configuration of a system featuring an interior staff-facing inlet, an interior public-facing inlet, and a custom-constructed shelf for the exterior public inlet. The system must include eight bins (seven sort bins and one for overflow/exceptions), maintain 99% uptime, operate at 160db or less, and integrate with the Polaris Integrated Library System using the SIP2 protocol. Technical requirements specify that the unit must fit within a 19-foot by 12-foot area, comply with California ADA space requirements, and be physically secured to meet state safety standards for natural disasters. The contractor is also responsible for providing bi-annual preventative maintenance and ensuring a minimum 50% increase in sorting efficiency compared to manual processes. The contract follows a best-value award basis, considering technical merit, experience, total cost, and sustainability impacts per Board Policy B-67. The performance period consists of an initial one-year base period followed by nine one-year option periods for hardware and software maintenance. Payment terms are thirty days from the receipt of a correct invoice. Submissions must be uploaded to BuyNet in PDF format and include several required exhibits, including a technical narrative, a cost/price exhibit, and signed representations and certifications. The contractor must adhere to County operating system standards, currently Windows 11 Professional/Enterprise 64-bit, and comply with comprehensive non-discrimination and confidentiality laws.
San Diego County

POSTED

4 days ago

DEADLINE

in 21 days
NAICS: 333922
Federal
Mechanized Material Handling Storage Aid System at Grissom ARB, Indiana
Solicitation # FA860427QB001
Solicitation FA860427QB001 is a Total Small Business Set-Aside for the design, fabrication, installation, and testing of a Mechanized Material Handling Storage Aid System at Grissom Air Reserve Base, Indiana, specifically for Building 613. The project encompasses 22 CLINs, including the delivery and integration of pallet rack systems, bin shelving, mobile aisle storage, rider reach trucks, stock assist vehicles, pallet jacks, and processing counters. The acquisition is being conducted as a Firm Fixed Price contract with a total period of performance of 360 days, though specific deliverables range from 60 to 150 calendar days from the date of award. The government will utilize the Lowest Price Technically Acceptable (LPTA) method for award, ranking responsive proposals by Total Evaluated Price and evaluating the lowest-priced offers for technical acceptability. Proposals must be submitted via the Procurement Integrated Enterprise Environment (PIEE) system in three separate PDF documents: a cost proposal, a technical proposal including completed questionnaires and commercial literature, and a subcontracting plan. Following Amendment 0001, the response deadline is November 30, 2026, and questions are due by November 16, 2026. Awardees must comply with strict base access security protocols and various DFARS Class Deviation Clauses.
FA8604 Aflcmc Pzi

POSTED

7 days ago

DEADLINE

in 14 days
NAICS: 333922
DIBBS
PALLET, MATERIAL HANDLI
Solicitation # SPE8EF-27-T-0250
Solicitation SPE8EF-27-T-0250 is for the procurement of material handling pallets under NSN 3990-00-223-6529, managed by DLA Troop Support Construction and Equipment Manufacturing and Construction. The requirement consists of two line items totaling 63 bundles, with each bundle equaling 20 complete pallets. Material specifications require that any oak or chestnut wood be bark-free and square-edged, with moisture content not exceeding 19 percent. The procurement is issued under the First Destination Transportation program with FOB Origin terms, and deliveries are scheduled for destination inspection and acceptance at DLA Distribution Warner Robins, Georgia, and DLA Distribution San Joaquin, California. The contract mandates strict adherence to technical and quality requirements from the DLA Master List, with packaging and palletization following ASTM D3951 and RP001, while marking and labeling must comply with MIL-STD-129. Quality assurance is governed by MIL-STD-1916 or ASQ H1331, utilizing a zero-based sampling plan. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The solicitation also incorporates various FAR and DFARS clauses regarding cybersecurity, the Berry Amendment, and equal opportunity for workers with disabilities, with a quotation deadline of November 19, 2026.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

8 days ago

DEADLINE

in 3 days
NAICS: 333922
SLED
CP25013
Solicitation # CP25013
The Port of Lake Charles is soliciting proposals for the engineering, design, fabrication, assembly, erection, transportation, testing, and commissioning of one new portal mounted traveling import hopper and related parts for its Bulk Terminal in Sulphur, Louisiana. The procurement includes an option for the owner to order one additional unit within twelve months of handover and requires a spare parts allocation equal to at least 5 percent of the purchase price per hopper. The equipment must be capable of safely handling bulk materials such as Bayrite, Rutile, and Petroleum Coke, adhering to strict technical specifications regarding volumetric capacity, dimensions, and safety standards, including NFPA 70E, OSHA, and ANSI Z 53.1. Proposals are due by November 20, 2026, and must include a bid bond, a reference list of installations from the last five years, and evidence of local sales support in the Southeast United States. Evaluation is based on a 125-point system to determine the order of contract negotiations. The selected contractor will be responsible for insurance and delivery to the site, while the owner handles customs clearance. Payment will be issued via wire transfer within 45 days of approved milestone invoices. Acceptance of the equipment occurs in stages, requiring a Pre-Shipment Certificate at the fabrication site and a final certificate of substantial completion at the delivery site following rigorous testing and documentation review.
Port of Lake Charles

POSTED

11 days ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Elevator Replacement and Modernization project is a subcontract opportunity issued by the Department of Defense through Navfacsyscom Mid-atlantic. The scope of work involves the full demolition and replacement of a freight elevator, which includes the installation of new mechanical, electrical, and control systems. The contractor is responsible for ensuring seamless integration into the existing infrastructure while maintaining strict compliance with all applicable safety codes. This project is located in Virginia Beach, Virginia, and is designated as a Total Small Business Set-Aside under FAR 19.5. Interested parties must submit their responses by January 28, 2026, at 5:00 PM. The contract falls under NAICS code 333922 and was officially posted on January 23, 2026.

General Info

NAICS

333922 - Conveyor and Conveying Equipment Manufacturing

Place of Performance

Virginia Beach, VA, 23460, USA

Set-Aside

SBA

Documents

This scope was carved out of N4008525R0084.

The full solicitation package (27 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REPLACE ELEVATOR, BLDG. 355, DAM NECK ANNEX VIRGINIA BEACH, VA

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • CONVEYOR, ROLLER, GRAOpen now, due in 7 days
  • TRUCK, HANDOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full demolition and replacement of freight elevator including mechanical, electrical, and control systems, with integration into existing infrastructure and compliance with safety codes.

More opportunities from Department Of Defense → Navfacsyscom Mid-atlantic

Same awarding agency

NAICS: 236220
New
Federal
NH100 Engine Control Unit Replacement
Solicitation # N4008527R9006
The NH100 Engine Control Unit Replacement project, managed by Navfacsyscom Mid-Atlantic under solicitation N4008527R9006, involves the replacement of three Engine Control Units (ECUs) on emergency generators at the NH100 Naval Hospital in Camp Lejeune, North Carolina. The scope of work includes providing all labor, materials, and expertise to install ECUs, onboard controllers, custom fabricated wiring harnesses, pulse-controlled fuel injectors, and voltage regulators. The primary objective is to restore the emergency electrical distribution system to compliance, requiring the contractor to integrate components into existing PLC controllers and employ a verified Commissioning Agent to perform system acceptance tests in accordance with NFPA 110. This project is a total Small Business Set-Aside, and only M&R MACC Contractors listed on the General Requirements cover page are eligible to submit proposals. The estimated contract value ranges between $500,000 and $1,000,000. Performance is divided into two phases: a Submittal and Procurement Phase requiring technical submittals within 15 calendar days of award, and a Physical Construction and Commissioning Phase to be completed within 60 calendar days of receiving all manufacturer materials. Administrative requirements include a 20% bid bond, the use of Wide Area WorkFlow (WAWF) for invoicing, and adherence to the Buy American statute. The contractor must comply with North Carolina Building Codes, OSHA Safety Codes, and specific UFC standards. A preconstruction meeting must be held within 35 calendar days after award to address cybersecurity and safety protocols.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Federal
MULTIPLE BARRACKS BUILDING 1245 and 1246 RENOVATIONS BEAUFORT SOUTH CAROLINA MARINE CORPS BASES
Solicitation # N4008527R0038
Solicitation N40085-27-R-0038 is a Design-Bid-Build project issued by the Naval Facilities Engineering Systems Command, Mid-Atlantic, for the renovation of Enlisted Bachelor Quarters Buildings 1245 and 1246 at MCAS Beaufort, South Carolina. The project involves two buildings of approximately 28,531 square feet each, with a scope of work that includes repairing barracks rooms and building exteriors, installing new standing seam metal roofs, replacing exterior balcony steel framing, and performing HVAC upgrades to make-up and exhaust air systems. Additional requirements include site drainage improvements, replacement of fire suppression sprinkler heads, and the installation of new lightning protection. The estimated project magnitude is between $25 million and $100 million, with a performance period of 734 calendar days and liquidated damages set at $4,225.66 per day. This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) restricted to specific MACC contractors, with the award based on the lowest lump sum price. The contractor must adhere to Davis-Bacon Act Wage Determination SC20260008 and provide performance and payment bonds within ten calendar days of award. Technical execution is governed by strict quality standards, including specific steel welding inspections and accredited laboratory testing for construction materials. Administrative requirements mandate the use of the Wide Area Work Flow (WAWF) system for monthly invoicing and the Electronic Construction and Facility Support Contract Management System (eCMS) for technical submittals. Proposals must include a bid guarantee of at least 20 percent of the proposed price, capped at $3 million, and proof of SAM registration.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
Federal
SH50 and HP259 HVAC Repairs
Solicitation # N4008527R9004
Solicitation N40085-27-R-9004 is a small business set-aside for HVAC repairs and modernization at MCB Camp Lejeune, North Carolina, with an estimated value between 1 million and 5 million dollars. The project is restricted to Mechanical MACC Contractors and is awarded based on the lowest price. The scope of work is divided into two primary components: Building SH50, which requires a turnkey modernization including the replacement of nine water-to-air heat pumps, one water-to-water heat pump, one air handling unit, and two pumps, along with BAS integration and hydronic loop cleaning; and Building HP259, which involves the replacement of a 20-ton split system air handling unit and matching outdoor condensing unit, including all associated ductwork and electrical connections. The contract must be completed within 180 days of award. Performance is subject to strict scheduling constraints, including a requirement for two weeks' notice to tenants and the mandate that work at Building HP259 and all power outages occur outside normal operating hours. Contractors must adhere to NFPA standards, ADA requirements, and the Buy American Act. Invoicing is processed through Wide Area WorkFlow, and the government reserves the unilateral right to award the second line item within 120 days of the initial award. Proposals must be submitted for all line items to be considered responsive.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS