Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Environmental Program Management

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity, titled Environmental Program Management, provides compliance and management support for environmental programs at Arnold Air Force Base. The scope of work involves managing aboveground storage tanks, environmental permits, and hazardous waste generation, as well as handling NPDES data through the use of monitoring equipment and sampling tools. Key deliverables include the production of compliance reports, permit renewals, and waste manifests. The contract is issued by the Department of Defense under the FA9101 Aedc Pkp Procrmnt Branch and is designated as a total Small Business Set Aside. It falls under NAICS code 541620. Personnel assigned to this project must hold Environmental Professional certifications to ensure all regulatory and technical requirements are met.

General Info

Environmental program management and compliance support for Arnold Air Force Base small business subcontract.

Agency

Department Of Defense → FA9101 Aedc Pkp Procrmnt BranchView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

TN, USA

Set-Aside

SBA

Documents

This scope was carved out of FA9101FSSIII.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Facility Support Services III - Industry Day Slides and Attendee List

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs compliance and management support for environmental programs for prime contractors on US Air Force Arnold AFB projects. Manages aboveground storage tanks, environmental permits, hazardous waste generation, and NPDES data using sampling tools and monitoring equipment. Requires Environmental Professional (EP) certifications. Delivers compliance reports, permit renewals, and waste manifests.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 541330
New
Federal
Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics
Solicitation # FA910126RWP-DigitalTwins
The Department of the Air Force is seeking innovative solutions through a Request for Whitepapers to establish an Other Transaction Agreement under 10 U.S.C. 4022 for the Arnold Engineering Development Complex (AEDC). The primary objective is to modernize facility documentation by creating high-fidelity, as-built 3D digital twins and predictive analytics for critical test infrastructure. The program begins in Fiscal Year 2027 with an initial prototype phase focusing on the Von Karman Gas Dynamics Facility, covering approximately 260,000 square feet of footprint and 1,040,000 square feet of scan area, with plans to eventually scale to over 2.5 million square feet across the complex. Technical requirements specify engineering-grade models with a minimum Level of Detail (LOD) 350, though LOD 400 is highly desired for primary connection points. Deliverables must maintain a dimensional accuracy of +/- 1/4 inch, globally referenced to project survey control, and utilize Autodesk Revit for architectural/structural models and Autodesk Plant PDM for intelligent process models. All work must be performed within the continental United States, and performers must comply with strict cybersecurity standards, including NIST SP 800-171 and CMMC Level 2 self-assessment. The agreement is not a standard procurement contract and is not subject to the Federal Acquisition Regulation. Instead, it utilizes a milestone-based, firm-fixed price structure for the base phase. Evaluation of submissions will be based on technical merit, innovation, program management, and risk. Eligible participants must certify as small businesses or nontraditional defense contractors. The submission deadline for whitepapers is October 8, 2026, and a site visit is scheduled for September 30, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Federal
RWP Independent Air Supply
Solicitation # FA9101269IAS
The Arnold Engineering Development Complex at Arnold Air Force Base, Tennessee, is seeking white papers for the Independent Air Supply project under the authority of 10 U.S.C. section 4022. The objective is to establish a secondary, dedicated, and conditioned air supply for an existing test cell. The scope of work includes the demolition of existing equipment and the design, procurement, fabrication, and installation of a system featuring at least four modular compressor units, dryers, heaters, expansion turbines, and a final mixing chamber. The system must integrate with base utilities and utilize a local control network featuring Emerson RX3i PLCs, Proficy Machine Edition programming, and a Simplicity HMI interface capable of supporting simultaneous unclassified and classified operations. The government may award up to two prototype agreements, with a preference for base milestone pricing around 250,000 dollars, though this is not a strict ceiling. All final engineering drawings and analyses must be stamped by a Professional Engineer licensed in Tennessee, and air purity must comply with ISO 8573-1 Class 1P. Evaluation of submissions will involve a go/no-go compliance check followed by a qualitative review of technical capability, schedule feasibility, and cost realism. The submission deadline for white papers has been extended to September 23, 2026. Interested parties must verify their CAGE code, Joint Certification Program, and CMMC status to access export-controlled Distribution D documents.
Engineering Services

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS