Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fanning Wash Diversion Project - Construction Manager at Risk

Closed
2026-362State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 4 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The City of Flagstaff is seeking a licensed Arizona Construction Manager at Risk (CMAR) for the Fanning Wash Diversion Project, with an initial budget of approximately 4.5 million dollars. The project aims to mitigate flooding risks for nearby neighborhoods and Thomas Elementary School by installing approximately 3,000 linear feet of 72-inch storm drain infrastructure along E. Linda Vista Drive, including new diversion inlet and outlet structures. The selection process is qualifications-based, requiring Statements of Qualifications to be submitted via the OpenGov portal by 12:00 pm on September 18, 2026. The contract is divided into two primary phases. During the design phase, the CMAR will collaborate with design professionals to provide constructability reviews at the 60, 90, and 100 percent stages, develop a project master schedule, and create detailed cost models to establish a Guaranteed Maximum Price (GMP). In the construction phase, the CMAR will manage the full execution of the project, which includes a requirement to self-perform at least 45 percent of the work. The selected contractor must provide 100 percent performance and payment bonds and adhere to strict project management, safety, and ADA accessibility standards. Payment will be administered through monthly progress payments based on an approved schedule of values.

General Info

City of Flagstaff seeks Arizona CMAR for 4.5 million dollar Fanning Wash project.

Documents

8
PDF, High priority: read this first49 pages · contract-document
High
PDF, High priority: read this first41 pages · contract-document
High
PDF, High priority: read this first26 pages · rfq
High
PDF, High priority: read this first26 pages · sources-sought
High
PDF, Low priorityconstruction-plans
Low
PDF, Low priority27 pages · report
Low
PDF, Low priorityother
Low
PDF, Low priorityother
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 318 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Water Services - Stormwater
Contacts2 people available
OfficeFlagstaff, AZ, 86001-5359, USA

Interested Companies (41)

Advanced Drainage SystemsDenver, Colorado
Ames ConstructionScottsdale, Arizona
Ardurra GroupMiami, FL

See All 41 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Flagstaff, AZ is requesting Statements of Qualifications (SOQs) for Project Title . SOQs are to be submitted on or before Response Submission Date at Response Submission Time via the City's eProcurement portal at https://procurement.opengov.com/portal/flagstaffaz . Late SOQs will not be accepted. CMAR Design Phase Services CMAR Design Phase Services by the Contractor generally include coordination with a Design Professional to review the construction documents, review and provide input on design, quantities, plans, schedules, constructability, and subsurface utility investigations. Additionally, the Contractor will develop a Project master schedule, cost models, and GMPs for the Project. The anticipated services include but are not limited to the following: Generate a detailed Scope of Services and Fees for the Design Phase of the Project to be agreed upon by the Owner. Participate in a project kick-off meeting with City Staff and Project Stakeholders. Develop and continually update the Project Master Schedule Prepare and update a Construction Management Plan if agreed on by the City, the Contractor, and the Design Professional to be necessary. Attending a design review meetings with the Design Professional, Owner's Project Manager, and other City departments as necessary. Review construction documents and provide input, to be included in the Owner's comment response form, at the 60%, 90%, and 100% stages of the design development. Input should include: Quantities, Constructability, value engineering, procurement time requirements, installation strategies, construction factors such as estimated cost of alternative designs, materials, and budgets. Means and method recommendations to facilitate construction (e.g. scheduling of long lead time procurements, minimizing disruptions to plant operations, etc.). Within the context of available budget develop accurate and detailed Cost Models of the 60% and 90% construction documents by applying knowledge of current marketplace conditions. Each Cost Model submitted shall be accompanied by backup documentation which shall include, but not be limited to the following: Unit prices and quantity take-offs. Details of all allowances and unit price work shown and specified in the detailed design documents. Include a list of all assumptions and description and breakdown of all allowances. Material costs, equipment costs, labor costs, General Conditions costs, hourly labor rates, and total cost. Copies of quotations from subcontractors and suppliers. Portion of the work to be performed by subcontractors including subcontractor's overhead and profit. Production rates, transportation, and other facilities and services necessary for the proper execution of the work, whether temporary or permanent, and whether incorporated or to be incorporated into the work. All fixed equipment, site improvements, utility, and equipment installations. Allocated general and administrative expenses. Project overhead. The CMAR's profit. Bonds, taxes, and insurance. Memoranda, narratives, reports, and all other information included by the CMAR. Cost Models will be utilized as the basis of the GMP Proposal. Cost Models will be compared with the estimate prepared by the Design Professionals and the City. Participate in stakeholder meetings. Meet and coordinate with various City departments and other agencies as warranted. Propose GMPs, formatted per the Owner's requirements, and that is based on and consistent with the current update/revision of the Cost Model. CMAR Construction Phase Services CMAR Construction Phase Services include coordination with various agencies, while performing the construction of the proposed improvements per the approved construction documents at the contracted GMP. The anticipated services include but are not limited to the following: Participate in a Pre-Construction Meeting. Perform and provide a pre-construction video and/or images of the site and adjacent properties. Prior to construction of the project provide or acquire all documents necessary to construct the Project including: Bonds, Insurance, Permits, Material Submittals, etc. Permit fees paid for by the City of Flagstaff Bond and insure the construction in accordance with state and city requirements. Construct improvements per the approved construction documents. Self-perform at least 45% of the work as set forth in A.R.S. § 34-605(G)2 and solicit bids from qualified subcontractors to perform applicable portions of the work. Coordinate inspections and testing of all work including City Inspections & Testing. Coordinate weekly construction meetings. Maintain and update Project Master Schedule. Identify activity sequencing, durations, and milestone dates. Ensure record as-built drawings are kept current, accurate, and developed per the Owner's standards. Procurement of materials and services. Schedule and manage site operations. Provide all construction surveying and staking. Maintain a safe work site. Establish and maintain the Stormwater Pollution Prevention Plan (SWPPP). The final scope of services will be negotiated after a qualified Contractor is selected.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS