FCI FORT DIX EMERGENCY ROOF DAMAGE REPAIR; WINTER-WIND STORM JANUARY 09-10, 2024

Awarded
15BFTD24P00000114Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 9 hours ago

DEADLINE

in 14 days
NAICS: 238160
New
SLED
9 DUPONTT LANE REHABILITATION PROJECT RP1531
Solicitation # 27-40
Solicitation 27-40, project RP1531, is a request for bids for roofing and window replacement work at 9 Dupont Lane in Norwich, Connecticut. The project is funded through the Property Rehabilitation Program and the HUD Lead Based Paint Hazard Control in Priority Housing Program. A pre-bid conference is scheduled for November 6, 2026, at 10:00 AM at the project location, and final bids must be submitted via the City of Norwich online bidding portal by 4:00 PM on November 13, 2026. Eligible bidders must be registered contractors in the State of Connecticut and provide proof of insurance, home improvement licensure, and lead abatement licensure if applicable. Submission requirements include a signed bidders certification, a completed payment request, a non-collusion affidavit, and all signed addendum sheets. The City enforces strict bidder limitation policies, generally restricting contractors to two active contracts across the Lead or Rehab programs, with new contractors subject to a one-contract probationary period. The selected contractor will be responsible for securing and terminating all required permits and utilizing builders grade materials. For properties in historic districts, windows must be all wood and match existing forms. Payment is processed via billing requests subject to inspection by Program Management and the property owner, with a minimum 15-day turnaround for approved invoices. Award decisions are based on the best interest of the City, which includes evaluating the bidder's standing and any pending civil litigation.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Federal Correctional Institution (FCI) Fort Dix in New Jersey is seeking a single award for the emergency repair or replacement of EPDM roofing and related storm damage repairs following a severe weather event in January 2024. The project, estimated not to exceed 225,000 dollars, is designated as a total small business set-aside and is being conducted without full and open competition due to the urgent need to prevent water intrusion and freezing in housing units. The scope of work includes the removal and replacement of roofing, dens deck, insulation, fascia, flashings, gutters, and downspouts for Buildings 5741 and 5831, with additional fascia and gutter repairs for Buildings 5811 and 5812. All work must adhere to specifications provided by STV Incorporated and meet current building codes and wind shear requirements. Due to the secure nature of the correctional facility, the contractor must comply with stringent security protocols, including background investigations for all personnel, mandatory security orientation training, and strict tool and material inventories. Work is scheduled Monday through Friday from 7:00 AM to 3:00 PM, though actual working hours may be reduced due to institutional emergencies or security routines. The contractor is required to provide a minimum two-year warranty on workmanship and a fifteen-year manufacturer warranty on all products. All materials entering the facility must be palletized and x-rayed for contraband, and the contractor is responsible for the legal disposal of all debris.

General Info

Contract Value

$396,456.89

NAICS

238160 - Roofing Contractors

Place of Performance

Joint Base MDL, NJ, 08641, USA

Set-Aside

SBA

Award Issued Date

Documents

2

SOW - Repair Storm Damaged Roof - FCI Fort Dix

PDF, High priority: read this firstsow
High

J&A - Repair Storm Damage FCI Fort Dix (Project 2422AZ5)

PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Fort Dix
Contacts1 person available
OfficeFORT DIX, NJ, 08640, USA
Office AddressFORT DIX, NJ, 08640, USA
Contacts
Arturo Aponte Berrios

Full Description

Show more
INTRODUCTION The Federal Correctional Institution (FCI) located at Fort Dix, New Jersey, intends to make a single award to a responsible entity for the repair or replacement of EDPM Roofing on select buildings and other storm damage repairs as set forth in this solicitation/contract. The Government reserves the right to award without discussion and to make a single award. Therefore, each initial quoted should contain the best terms from a cost or price standpoint. PLACE OF PERFORMANCE FCI Fort Dix 5755 Hartford Road Joint Base MDL, NJ 08640 SCHEDULE OF DELIVERY PERFORMANCE The contractor will provide all labor, material and equipment necessary to remove, replace and/or repair the EPDM roofing, dens deck, insulation, fascia, to include all wood nailers, flashings, terminations, anchors, gutters and downspouts. The roofs received storm related damage due to high winds. All work is to be performed in accordance with specifications and drawings prepared by STV Incorporated unless otherwise noted to include but not limited to updates in building codes and wind shear requirements. The roof repair and /or replacement will be conducted on the following roofs: Building 5741 -Repair Building 5831 -Repair Building 5741 is considered to be in a high wind shear area and repairs should meet or exceed those requirements set forth by industry standards. The following buildings will require repairs and/or replacement to the fascia, flashing, gutters, and downspouts. The roofs upon visual inspection appear to be intact: Building 5811 Building 5812 SCHEDULE OF PERFORMANCE Working hours are Monday thru Friday 7:00AM-3:00PM to exclude federal holidays except during emergencies. Any work required to be completed at any other time than noted above must be requested in writing to the Contracting Offic r's Representative (COR). The COR will review any request for a change in schedule and make a determination. It shall be the responsibility of the Contractor to familiarize himself, his employees, and any subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour work day. The Government assumes no responsibility to the Contractor nor to any subcontractors for shorter hours due to i stitutional emergencies or entry and/or exit of workers necessitated by normal institution routines. Contractors should plan for a minimal amount of time accrued for security considerations, i.e., movement through the secure entrance to the work site, delays due to inmate movement, institution lock-down, institutional emergencies, tool inventories checklist, and material loading and unloading. In the event of an institutional emergency, the Contractor will be instructed to secure all work, secure and stow all tools, equipment and materials, and the Contractor will be escorted out of the institution. Work will be allowed to resume once the institution emergency passes. INSTITUTION SECURTIY Contractor employees working at the FBOP institution will be subject to a background investigation after award of the contract. Contractor employees must complete all applicable forms provided by the FBOP. Following the investigation, the FBOP will provide the Contractor with a list of employees cleared to work at the institution. If a Contractor's employee is not cleared, that fact will only be communicated to the Contractor. No additional justification will be released. The contractor and their construction staff awarded the project will be required to attend a four (4) hour orientation and security procedures training. The contractors and any subcontract staff are required to attend. This training must be accomplished prior to any contract or subcontract employee being granted access to federal property to start work. All contractors/subcontractors will be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the Contracting Officer's Representative. All contractors and subcontractor employees will provide a check list of all employees on site each day to the COR, verifying the number of workers on site each day and that all workers are approved to be on site. The Contractor agrees to adhere to all regulations as outlined in HSPD-12 (Homeland Security Presidential Directive), agrees to adhere to all regulations prescribed by the institution for safety, custody and conduct of staff, contractor workers and inmates. The Contractor may at any time be removed from the institution grounds at the discretion of the Warden. DELILVERY OF MATERIALS All construction related equipment and materials required for the contractor to work on this project will be processed by the contractor and delivered to the contractors approved storage area. Any construction related deliveries which are delivered on site, can be received by the contractor Monday through Friday, excluding Federal Holidays between the hours of 7:00AM - 3:00PM. The contractor will be required to notify the COR when a delivery is scheduled and a contractor representative must be present at time of delivery. Under no circumstances will institutional staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading materials and/or equipment. All materials that enter the secure institution will have to be placed on a pallet and scanned through an xray machine to ensure no contraband is present before proceeding to enter the secure area(s) of the institution. This step will be conducted during the normal working hours and could delay entrance to the secure institution. The contractor should plan accordingly on days material(s) are required to enter the secure institution. DESCRIPTION OF BUILDING ROOF All work is to be performed in accordance with specifications and drawings prepared by STV Incorporated unless otherwise noted to include but not limited to updates in building codes and wind shear requirements. All materials specified by STV Incorporated must be brand name or an equal product. Should the contractor choose to submit an equal product, you must submit all technical specification of the equal product to be analyzed and a technical determination issued with acceptance/non-acceptance. Building 5741 -Building Type "B" Roofing Plan Building 5831 -Building Type "E" Roofing Plan Repairs as specified by the institution will not receive a full replacement of materials, rather the minimum amount of viable material to make the roof back to specifications previously set forth. REMOVAL OF EXISTING BUILDING ROOFING The contractor will be responsible for removal and disposal of all materials in accordance with all Federal, State, and local applicable laws. An open top dumpster(s) provided by the contractor can be utilized daily at the building site if work area is suitable for such equipment. The dumpster will have to remain in a secure area accordingly to policies prior to full removal off of institutional grounds. TESTING AND INSPECTION AND WARRANTIES: The contractor at a minimum shall meet manufacturer recommendations, and industry standards set forth in accordance with all federal, state and local regulations. Upon the completion of the installation, the contractor will inspect the end product for sign-off performance to the satisfaction of the Contract Officer Representative (COR). The contractor will provide at a minimum a two (2) year warranty on all work performed and a minimum of a fifteen (15) year warranty on all products from the manufacturer. If the manufacturer warranty does not meet the fifteen (15) year minimum warranty requirement, the contractor must provide an approved replacement product to meet obligations or absorb the warranty requirements set forth in this contract award. STORAGE OF TOOLS, MATERIALS, AND EQUIPMENT All contractor tools shall be inventoried prior to entrance and exit from the institution daily. Any contractor materials, tools, and/or equipment that will be required to be brought on site for an extended period of time to expedite the project completion shall be permitted to be stored in a previously approved location agreed upon by the Contract Officer Representative and the contractor. DEFINITIONS The Contract Officer (CO) executes the contract on behalf of the Government; this shall include a duly appointed successor. The Contracting Officer is the only official authorized to administer, modify and/ or terminate the contract. The Contracting Officer makes related approvals, determinations, and finding pertaining to the contract and is the only individual on the project staff who can obligate funds on behalf of the Government. The FCI shall ensure a Contract Officer's Representative (COR) is present to allow access to all areas by the contractor. The COR will be located at the project site and has overall responsibility for the administration of the operations and activities at the project site. The COR represents the Contract Officer for all technical matters that arise under the contract. The COR will evaluate the contractors performance and prepare a performance report at the end of the contract. The Contract Officer Representative (COR) shall not, and has no authority to re-delegate authority to any other person, change or modify any terms of the contract, obligate the payment of any money by the Government and/or cause the contractor to incur cost not otherwise covered by the contract. The contractor shall provide to the Contract Officer Representative, (3} three copies of the safety data sheet (SOS} on all materials and substances that may be used during the course of the project. In the event the Institution Safety Manager does not approve the material, it shall be the responsibility of the Contractor to locate and procure an alternative product. OTHER CONSIDERATION The FCI shall ensure a representative is present to allow access to all areas by the contractor. Contractor performance will be monitored. It is the contractor's responsibility to repair and/or replace any Government property damaged by contractors/subcontractors employees. Damage will be corrected and restored to previous condition at no cost to the Government. Contractor wi11 NOT be a11owed to bring cell phones, cameras, weapons or any other objects that violate criminal laws or are prohibited by Federal regulations or Bureau of Prisons policies on institution grounds. If use of a telephone is required in case of an emergency, the Government will provide a phone line for use. Contractor will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services being provided. It is recommended that Contractor employees bring their lunch into the institution. Contractor employees will be permitted to exit the institution at any time while during normal institution operations. Consideration to reentry access is advised as it can significantly impact performance. Depending on institutional operations, re-entry may be encumbered due to various reasons to include, but not limited to; BOP escort staff not availability, security processing times, institution emergencies, etc. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced. Any contractor employees who will require departure of the institution due to an incurred injury while performing prescribed work will be allowed to do so. However, the primary contractor shall be responsible to dispatch another institution authorized replacement as soon as reasonably possible to compete the necessary work. All work shall be carried out in such a way as to cause minimal interference in the normal operations of the institution. Contractor and subcontractor employees shall comply with all institution regulations regarding safety and security. The COR or Contracting Officer may, if circumstances dictate, instruct the Primary Contractor to remove a particular assigned employee if he or she demonstrates, or is found, to be incompetent, careless, insubordinate, unsuitable, or in essence unprofessional in the delivery of contracted services and whose continued assignment to work at the institution would be deemed contrary to the security of the institution. The Contractor shall be responsible for removing all waste from the institution grounds and disposing of in accordance with all federal, state, and local regulations. _______________________________________________ JUSTIFICATION FOR OTHER THAN FULL A.ND OPEN COMPETITION REPAIR STORM DAM.AGE FCI FORT DIX, NEW JEIRSEY B&F PROJECT 2422 .zs Pursuant to the Federal Acquisition Regulation (FAR) S ubpar: 6.302-2(a) (2) and 6.302-2 (b) (1) & (2), and the Bureau of Prisons Acquisition Po]:icy (BPAP) Part 6.3O4(a), the Federal Bureau of Prisons (BOP) has determined that the pro:urement of Repairs to the Housing Unit Roofs meets the criteria established for other than full and open competition. It is further determined that the circumstances of this requirement are of unusual and compelling urgency that preclude competition, and that delay in award of contract would result in serious injury, financial or other, to the Government. This limitation on competition is justified as supported by the following informc.tion: Agency: Department of Justice Federal Bureau of Prisons Federal Correctional Institution Fort Dix 5755 Hartford Road Joint Base MDL, N.J. 08640 Nature and/or description of action being approved: This action is for the acquisition of emergency repair:; to housing unit roofs from storm related damage. Description of supplies or services recmired.tc nget tl mcy needs: During the dates of 01/09/2024 through 01/10/2024 FCI Fort Dix experienced a weather related storm causing severe damage to several housing unit roofs and other damage to building that affect the buildings - xte ndecl use if not corrected. The repair cost is expected not to exceed $225,000.00. Statutory authority permitting other than fu.U.a1}! oi,en competition: 41 U.S.C. 3304 (a)(2) and FAR 6.302-2 (a)(2). When the agency's need for the supplies or services is of such an unusual and ceimpe1ling urgency that the Government would be seriously injured unless the agency is per11itted to limit the number of sources from which it solicits bids or proposals, full a1d open competition need not be provided for. Determination that proposed contractoir's uni,il!U? qlllalifications or the nature of the acquisition requires use of the authorttx cit d: Due to urgent need of repairing roofs to prevent further water irtrusion, freezing conditions in the ceilings, and safety and se,::urity of the institution. The winter season night time temperatures drop below freezing for approximately the next 4 months. Efforts made to solicit from as many sources a:5LJtJ]tcticable htcluding whether or not a notice was or will be publicized as r .Q.!llirgd by FAR E'art. 5.2: Due to the urgent and compelling nature of this re;:iuirement, there is not sufficient time to post this requirement to the Federal Bm:iness Opportunitfes (FBO) website to obtain competition. Contracting Officer's determination that the osJJ;p the- GovEtrnment will be fair and reasonable: Prices will be analyzed by the Contracting Officn wit the ::1ssist.rnce of the Facilities Manager, and the Business Office Accountant in order :o det:erm:ne price reasonableness at time of invoice. Description of the market survey conductedl Due to the urgent and compelling nature of this re1uir2rne11t, thne is not sufficient time to conduct a formal market survey. Other Facts Supporting the Use of Other ThanJnll arnd_OperiCompetition: None. List of Sources. Expressing in Writing, lntere ;11:_in_the Acquis i1:ion: No other sources were sought due to the ur..usu.,iltn d compelling nature of request. Actions Taken by the Agency to Remove or Overcome B.arrier ; to Competition: Future Acquisitions will be competed when prai ti,:abl1 . Contracting Officer's Certification: I hereby certify that the above justification is aci:u:ate and complete to the best of my knowledge and belief. Approved By: ARTURO APONTE- Berrios Contract Specialist F.C.I. Fort Dix Digitally signed by ARTURO APONTE- BERRIOS Date: 2024.0l)1a.3t 20 10:46:58 -05'00' Cost Center Manager's Certification: I hereby certify that this justification and the su:iporting d,,ta Fm :he certification are accurate and complete to the best of my knowled51 :rnd belid. Approved By: Jamey F. Kruskie Facilities Manager F.C.I. Fort Dix

More opportunities from Department Of Justice → Fci Fort Dix

Same awarding agency

NAICS: 311999
Federal
FCI FORT DIX FY26 2ND QTR SUBSISTENCE; INCLUDING EGGS, BREAD AND DAIRY- 15BFTD26Q00000001
Solicitation # 15BFTD26Q00000001
The Federal Bureau of Prisons, through the Federal Correctional Institution at Fort Dix, New Jersey, has issued solicitation 15BFTD26Q00000001 for the procurement of food subsistence supplies, specifically including eggs, bread, and dairy. This is a firm-fixed-price, 100% small business set-aside contract intended to cover the second quarter of fiscal year 2026, spanning from January 1, 2026, to March 31, 2026. The government intends to award contracts by line item to the lowest responsive and responsible offerors. Notably, certain items such as hot dog buns, hamburger buns, and whole wheat bread will be evaluated together to ensure they are not awarded to multiple different vendors. All awarded vendors must be registered in the SAM system and be willing to accept payment via Electronic Funds Transfer. Offerors must submit their quotes via email no later than November 20, 2025, at 11:59 PM Eastern Time to the designated contract specialist. Submissions must include a completed SF 1449, a Contractor Information Sheet, and the bid sheet strictly in Excel format. Strict adherence to submission instructions is required, as any changes to the solicitation or failure to follow email protocols may result in rejection. All food products must comply with National Menu Specifications, the Federal Food, Drug, and Cosmetic Act, and FSIS regulations, including specific requirements for allergen labeling and packaging. Deliveries are scheduled for the first half of January 2026 and must be made Monday through Thursday between 7:00 am and 2:00 pm at the Fort Dix facility. Additionally, contractors must comply with Department of Justice requirements regarding cybersecurity training and the safeguarding of personally identifiable information.
All Other Miscellaneous Food Manufacturing

POSTED

12 months ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS