Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on February 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Alarm Inspection & Testing (Preventive Maintenance)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA and EPA regulations, national building codes, and Indiana state laws, with Indiana regulations taking precedence if they are more stringent. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion. A mandatory site visit was required on November 10, 2026, with a response deadline of November 20, 2026. Award will be based on best value, evaluated by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Required submissions include a completed SF 1413, Vendor Questionnaire, W9, proof of a valid Indiana Contractor's License, and certification of compliance with Davis Bacon Act wage rates. The contractor must maintain general liability insurance of at least 1 million dollars per occurrence and automobile liability coverage. Payment terms are Net 30. The contractor is required to provide a one-year guarantee of workmanship and all applicable manufacturer warranties upon substantial completion of the project.
Atterbury Job Corps. – Adams & Associates

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at its center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The scope of work requires the contractor to provide all labor, materials, and supervision to install LED emergency/exit light fixtures and directional markings in accordance with NFPA 70 (National Electrical Code) and NFPA 101 (Life Safety Code). This solicitation is set aside for Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Bidders must submit a detailed, itemized quotation using the provided bid sheet, along with a current insurance certificate and any applicable state or trade licenses. Compliance with the Davis-Bacon Act regarding prevailing wages and fringe benefits is mandatory. A bond is required for any proposal exceeding 150,000 dollars. Proposals must be submitted to Leana Leavitt by December 4, 2026, at 4:00pm CST, with a scheduled site walk-through on November 23, 2026. Payment terms are Net 30 following service verification and invoice receipt.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections, installing standardized external oil sampling devices to improve safety, and conducting oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained to prevent oil oxidation and moisture intrusion. Key deliverables include annotated infrared images, written condition assessment reports for each asset, comprehensive standard operating procedures, and on-site training for up to 20 agency staff members. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. This is a fixed-price contract with a not-to-exceed total price, intended as a single award to the most capable and cost-effective offeror. Qualified bidders must have completed at least two similar projects in the last five years, including at least one for a utility or industrial facility. Proposals are due by December 23, 2026, via the PlanetBids portal and must include a detailed staffing plan, methodology, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Performance will take place across multiple agency locations, including sites in Ontario, Chino, and Rancho Cucamonga. The agency requires electronic invoicing and payment via ACH, with a standard 30-day approval process.
Inland Empire Utilities Agency

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Eastern Municipal Water District's Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted by 2:00 PM on November 18th, with a final deadline of November 19th, to be considered responsive. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and must adhere to the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for General Liability per occurrence, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability. Evaluation will prioritize SBE/DBE participation, including any lower-tier participation provided in the quote. Primary points of contact for the solicitation are Lead Estimator Ryan Falk and Amy Roller.
Axia Electric

POSTED

about 5 hours ago

DEADLINE

in 1 day
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, repairing, and certifying emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the integration of fixture data and test results into the facility's Computerized Maintenance Management System (CMMS) and the establishment of an automated 30-day functional testing schedule. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wages and FAR clauses regarding small business utilization, contractor whistleblower rights, and security requirements. Contractors must comply with Executive Order 13706 regarding paid sick leave and provide proof of insurance before commencing work. Final acceptance and payment are contingent upon a substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation (MTC), acting as the operator for the Joliet Job Corps in Illinois, is soliciting bids for a fixed-price, single lump sum subcontract to replace a water-damaged 30KVA, 480V primary, 120/208V secondary transformer. The scope of work includes pre-work coordination, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit according to environmental regulations, and installing a replacement transformer on a structurally adequate elevated support platform anchored to the building. The project is designated for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bids are due by November 25, 2026, and must include a detailed cost breakout on company letterhead, proof of insurance, three references, and the completed MTC Supplier Packet. The contract requires strict adherence to Construction Wage Rate Requirements, necessitating the payment of prevailing wages and fringe benefits as specified in Wage Determination IL20260008. Award is based on overall best value. Once a Notice to Proceed is issued, work must begin within five business days and be completed within 60 consecutive business days, with liquidated damages of $100 per day for delays. For bids equal to or exceeding $25,000, a bid bond of 20% and subsequent performance and payment bonds from an A- rated surety are required. Payment is processed via AIA documents, with a 10% retainage withheld until substantial completion. Final acceptance is contingent upon a joint inspection and the resolution of a punch list, and the contractor must provide a one-year guarantee for workmanship.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 238210
New
SLED
Installation of EV Chargers for the Electric Bucket Truck
Solicitation # CS 11-26-01
Alameda Municipal Power is soliciting bids from qualified C-10 electrical contractors for the installation of two electric vehicle chargers at the AMP Service Center parking lot to support a 2022 International eMV607 SBA electric bucket truck. The project involves installing one InCharge ICE-30 Level-3 DC fast charger and one InCharge ICE-80 Level-2 AC charger, both of which will be supplied by AMP. The scope of work includes installing a 100 Amp 3-pole 480-volt circuit breaker, approximately 150 feet of EMT conduit, a 60-amperage 600-volt Nema 3r safety switch, and one protective bollard for the Level-3 charger, as well as a 50 Amp 250-volt breaker and approximately 70 feet of EMT conduit for the Level-2 charger. All work must be completed within 90 calendar days from the Notice to Proceed, with a mandatory site visit required by November 16, 2026. The contract will be awarded as a total lump sum to the lowest responsible bidder, with preference given to local Alameda businesses. Bidders must be registered with the Department of Industrial Relations and adhere to California prevailing wage laws. Required submission documents include a Statement of Qualifications, Non-Collusion Declaration, Subcontractor List, and bid security equal to 10 percent of the maximum bid. For projects exceeding 25,000 dollars, performance and payment bonds for 100 percent of the contract price are required. Bids must be submitted electronically via the OpenGov Procurement portal by November 19, 2026. Additionally, corporate officers or owners performing the work may submit a Certificate of Exemption under Labor Code 3352 in lieu of a workers compensation policy if the company has no employees.
Support Services

POSTED

about 13 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Napa County is seeking a subcontractor for the routine inspection, testing, and preventive maintenance of fire alarm systems across 17 different county sites. The scope of work focuses on ensuring system reliability through regular device checks and the provision of detailed compliance reporting to meet safety standards. This opportunity was posted on February 26, 2025, with a response deadline of April 8, 2025. The project falls under NAICS code 238210, and interested parties can find further details through the official Napa County bids portal.

General Info

Napa County seeks a subcontractor for fire alarm maintenance across 17 county sites.

Documents

This scope was carved out of PM022501.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP: Fire Alarms Monitoring, Testing, Inspection, and Maintenance Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
  • Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Napa County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Routine inspection, testing, and preventive maintenance of fire alarm systems across 17 County sites, including device checks and compliance reporting.

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fulton Ranch Vineyard Agricultural Erosion Control Plan (ECPA) #P23-00326-ECPA
Solicitation # P26-00176-ECPA
The contract pertains to the implementation of an agricultural erosion control plan for the development of a 4.79-acre vineyard on three parcels within a larger 182.78-acre property in Calistoga, California, with approximately 3.66 net acres designated for planting in five distinct vineyard blocks. It authorizes land-disturbing activities on slopes exceeding 5%, including the clearing of oak woodland, Douglas fir forest, and ruderal vegetation within defined limits, as well as earthmoving, land contouring, and the installation and ongoing maintenance of erosion and runoff control measures necessary to support agricultural infrastructure. The project was approved by the Napa County PBES Director on July 14, 2026, and the associated plan is formally identified as ECPA #P23-00326-ECPA. The activity is governed under the jurisdiction of Napa County, with the place of performance specified as Calistoga, CA 94515, and the primary point of contact is Pamela Arifian, Planner III, who can be reached via email or phone for administrative and regulatory inquiries. Dirk Fulton, Manager and General Partner, is listed as a secondary contact, indicating direct ownership or operational involvement in the project. The plan is publicly accessible through the California Environmental Quality Act database via the linked online portal, ensuring transparency and compliance with state environmental standards. No set-aside or NAICS classification is applied, reflecting its status as a local agricultural development subject to county-level environmental review.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541330
SLED
230 Long Ranch Road LLC Vineyard Development Agricultural Erosion Control Plan #P24-00114-ECPA
Solicitation # P24-00114-ECPA
The 230 Long Ranch Road LLC Vineyard Development project, identified by Agricultural Erosion Control Plan #P24-00114-ECPA, involves the development of a vineyard on a 48.42-acre property in St. Helena, California. Approved by the Napa County PBES Director on June 8, 2026, the scope of work includes clearing vegetation, earthmoving, and land contouring to develop approximately 14.8 to 18.8 gross acres of vineyard, consisting of four vineyard blocks with approximately 12.1 to 15.8 net planted acres. The project specifically addresses land disturbing activities on slopes greater than 5% and requires strict adherence to erosion control measures to ensure no net increase in soil loss or runoff. Environmental compliance is a central component of the contract, governed by the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration was adopted following a public review period from November 27 to December 27, 2025. Key environmental mandates include the retention of at least 3.0 acres of chamise alliance habitat and the preservation of 4.1 acres of Scrub Interior Live Oak habitat. The project also requires preconstruction surveys for nesting birds, protection of special-status plant species, and a three-year monitoring period for any replaced vegetation. Technical adequacy has been verified by the Napa County Engineering Division, and the project is subject to a specific grading season from April 1 through September 15. Administration of the project is handled on a time and materials basis, with the Napa County Planning Division overseeing inspections of fencing and habitat preservation before earthmoving begins.
Engineering Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
AXR Napa Valley Winery - Major Use Permit Modification, Variance, and Viewshed
Solicitation # P22-00417
The AXR Napa Valley Winery project, approved by the Napa County Planning Commission on June 3, 2026, involves a major modification to Winery Use Permits P08-00099 and P04-0541. The scope of work includes the construction of a 17,190 square foot type I wine cave and the conversion of several existing structures for tasting and hospitality purposes, including a 1,492 square foot barrel storage building, a 1,204 square foot outdoor crush/tank pad, and the 4,147 square foot main floor of the historic Hirsch residence for office and tasting room use. These modifications are intended to support an expanded marketing program and an increase in both employees and visitor traffic at the St. Helena, California location. Infrastructure improvements are a central component of the project, featuring water and wastewater system upgrades and the installation of a left turn lane and driveway modifications on Highway 29. To facilitate these improvements, the project includes a variance to the 600-foot winery setback from SR 29 for aboveground wastewater structures and an Administrative Viewshed Permit for cave portals and utility improvements on slopes between 15 and 18 percent. The project is governed by a Mitigated Negative Declaration, with specific mitigation measures and monitoring plans adopted as conditions for approval. Administrative oversight is managed by Hannah Spencer of the Napa County Planning, Building, and Environmental Services Department.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 111332
SLED
B&F Farms Vineyard Conversion $P25-00029-ECPA
Solicitation # P25-00029-ECPA
The project involves the conversion of approximately 120 acres in Yountville, California, into a vineyard, with 10.1 gross acres developed for planting and 7.4 net planted acres dedicated to vine cultivation. Activities include clearing diverse vegetation types such as non-native grassland, coyote brush scrub, coast live oak woodland, and knobcone pine forest, followed by earthmoving, installation of erosion and runoff controls, and development of agricultural irrigation infrastructure. All work is subject to strict seasonal limitations to protect sensitive species, particularly avoiding ground disturbance during the Northern Spotted Owl nesting season from February through July. Biological surveys for Clara Hunt’s milk-vetch and owl activity must be conducted by qualified biologists using protocols mandated by the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service, with reports submitted prior to any ground-disturbing activities. A 0.25-mile no-disturbance buffer must be maintained if active nests are detected, and an Incidental Take Permit under the California Endangered Species Act may be required if impacts to protected species cannot be fully avoided. The project is governed by California Environmental Quality Act (CEQA) compliance procedures and has been determined to proceed under a Mitigated Negative Declaration, contingent upon adherence to approved mitigation measures outlined in a Draft Mitigation Monitoring and Reporting Program. Regulatory oversight is administered by Napa County’s Department of Planning, Building, and Environmental Services, with Donald A. Barrella serving as the Principal Planner and primary point of contact. Compliance with the Migratory Bird Treaty Act, CDFW survey protocols, and potential Lake and Streambed Alteration Agreement requirements are mandatory. There is no formal federal contract structure, pricing data, or procurement evaluation criteria; instead, this is a local land-use permit requiring environmental mitigation and regulatory approvals. The project site is located in ZIP code 94558, and all submissions must be filed electronically through the CEQA Submit Portal or physically delivered to Napa County offices, with public review ending on May 29, 2026. No federal acquisition regulations, contract clauses, or financial terms apply, as this falls entirely under state and local environmental permitting authority.
Grape Vineyards

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Barnett Winery - Use Permit (P19-00125-UP), Viewshed Protection Program (P20-00121-VIEW), and Exception to the Road and Street Standards
Solicitation # P19-00125-UP
The Barnett Winery project seeks approval through Napa County to expand operations at its existing 20,000-gallon winery located at 4018/4070 Spring Mountain Road in Calistoga, California. The proposal includes remediation of unpermitted activities such as increased employee count, daily tours and tastings by appointment, marketing events, and on-premise outdoor wine consumption, which have triggered requirements for public water system upgrades, wastewater system improvements, and an exception to the Road and Street Standards for driveway modifications. Beyond compliance, the project proposes significant expansion: increasing annual wine production to 30,000 gallons, raising the full-time employee count to nine, intensifying visitor programs, constructing a new 1,700-square-foot hospitality building with a tasting room and office, adding parking spaces, installing a 12,000-gallon fire protection water tank, and implementing new landscaping, all subject to the stringent design and visual preservation requirements of the Viewshed Protection Program. Environmental compliance is central, with mandatory adherence to CEQA guidelines, implementation of a Mitigation Monitoring and Reporting Program, specific biological surveys to protect nesting raptors during seasonal restrictions, and strict control over stormwater, dust, and groundwater impacts in accordance with Napa County ordinances, California Fish and Game Code, and best management practices from CASQA and BAAD. The project has been processed under a land use permit framework rather than a traditional procurement contract, with no federal acquisition regulations, contract clauses, pricing structures, or procurement-specific terms such as LPTA or Best Value applied. Oversight is managed by Napa County’s Planning and Building Department, with Matt Ringel as the primary point of contact, and key approvals contingent upon engineering certification, environmental mitigation execution, and on-site compliance verification during construction and final inspection phases. All operations must align with existing groundwater protection standards, fire safety codes, and land use zoning restrictions, ensuring that growth is balanced with ecological and aesthetic preservation in the region.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS