This Solicitation opportunity from Florida was posted on March 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flagler County Beach Nourishment Project - Reach II FPN 429573-1-38-01

Closed
25-ITB-078State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Flagler County, Florida, is undertaking a significant beach nourishment project to address extensive erosion and dune loss caused by multiple hurricanes and nor'easters over recent years. The coastline, spanning 18 miles along the Atlantic Ocean, has experienced severe damage that has resulted in the loss of primary frontal dunes and heightened vulnerability of upland infrastructure, including State Road A1A. While the U.S. Army Corps of Engineers has already completed nourishment along 3.5 miles of the southern Flagler Beach area, this project aims to restore an additional 5.5 miles of coastline extending through the City of Flagler Beach, Beverly Beach, and unincorporated areas past Varn Park into Hammock Dunes. The solicitation, titled "Flagler County Beach Nourishment Project - Reach II," was issued by the Flagler County Engineering Department with a response deadline of April 16, 2026. The contract is managed at the county level with contacts including the County Engineer, Hamid Tabassian, and Senior Procurement Coordinator, Kelly Bowman. The project focuses on restoring critical beach and dune systems to protect local communities and infrastructure from future coastal storm impacts, bolstering resilience along the vulnerable Flagler County shorefront.

General Info

Flagler County seeks contractors to restore 5.5 miles of eroded coastline by April 2026.

Documents

23

Amendment No. 2 to Agreement No. 23FL2 Flagler County Hurricane Recovery Project

PDF, High priority: read this first33 pages · amendment
High

BOEM Lease OCS-A 0572 Flagler County Beach Nourishment Phase II

PDF, High priority: read this first24 pages · contract-document
High

Federal Contract Requirements - Special Provisions Article 42

PDF, High priority: read this first7 pages · contract-document
High

Flagler County Beach and Dune Restoration Project Geotechnical Investigation

PDF, High priority: read this first360 pages · geotechnical-investigation
High

Flagler County Beach and Dune Restoration Project Permit 0379716-003-JM

PDF, High priority: read this first35 pages · permit
High

Flagler County Beach and Dune Restoration Project Phase 2 Bid Schedule

PDF, High priority: read this first1 page · bid-schedule
High

Flagler County Beach and Dune Restoration Project Physical Monitoring Plan 2025-01-13

PDF, High priority: read this first3 pages · sow
High

Flagler County Beach Nourishment Project Contract

PDF, High priority: read this first2 pages · contract-document
High

Flagler County Beach Nourishment Project - Reach II ITB 25-ITB-078

PDF, High priority: read this first74 pages · itb
High

Flagler County Geotechnical Investigation for Borrow Area 3A Development March 2024

PDF, High priority: read this first732 pages · geotechnical-investigation-report
High

Flagler County Phase 2 Revised Permit Drawings

PDF, High priority: read this first24 pages · specifications
High

Flagler County Sediment Quality Control/Assurance Plan for Beach Restoration

PDF, High priority: read this first6 pages · quality-control-plan
High

IFB 25-ITB-078 Flagler Reach 2 Beach and Dune Restoration Technical Specifications

PDF, High priority: read this first62 pages · ifb
High

Payment and Performance Bond Form 337-18 May 6 2014

PDF, High priority: read this first4 pages · bond-form
High

Permit SAJ-2019-02065 for Flagler County Beach Nourishment Project

PDF, High priority: read this first137 pages · permit
High

Plans for Beach and Dune Restoration Project Reach 2 Flagler County FL - 2026-03-04

PDF, High priority: read this first33 pages · plans
High

Project Contract Forms - Flagler County

PDF, High priority: read this first14 pages · contract-forms
High

Statement of Understanding 4673 and 4680 Flagler County Beach Sand Replenishment Project Scope of Work

PDF, High priority: read this first5 pages · sow
High

24-PC-01778 Flagler County Beach and Dune Restoration Cultural Resource Survey Final Report July 2024

PDF, Low priority186 pages · final-report
Low

Interim Technical Report - Phase I Remote-Sensing Archaeological Survey Flagler Beach

PDF, Low priority46 pages · technical-report
Low

NOAA Fisheries Southeast Regional Office Vessel Strike Avoidance Measures

PDF, Low priority3 pages · special-notice
Low

USACE Flagler County Hurricane and Storm Damage Reduction Project Feasibility Study Appendix D Geotechnical

PDF, Low priority289 pages · feasibility-study
Low

Warranty Bond Form for City of Bunnell Project

PDF, Low priority2 pages · warranty-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Engineering
Contacts2 people available
OfficeBunnell, FL, 32110, USA
Organization / AgencyFlorida → Engineering
Office AddressBunnell, FL, 32110, USA
Contacts
Hamid TabassianCounty Engineer
Kelly BowmanSenior Procurement Coordinator

Full Description

Show more
Flagler County, FL, has 18 miles of Atlantic Ocean shorefront (Figure 1). The County beaches were severely impacted by storm surge and waves from Hurricane Matthew in October 2016, Hurricane Irma in September 2017, Hurricanes Ian and Nicole in late September and early November 2022, and numerous seasonal nor'easters over the past 5 to 10 years. The cumulative impacts of these storm events to the County's beaches and dunes have been significant. In many areas, the entire primary frontal dune has been completely lost. Beach erosion and dune loss have exposed large areas of upland development and infrastructure, including State Road A1A along the southern area of the County, and increased threats from future coastal storms. The USACE has recently completed 3.5 of beach nourishment along the southern Flagler Beach coastline along SR A1A. The Flagler County Board of County Commissioners is pursuing a plan to restore the beach and dune along the 18-miles of coastline outside of the USACE Coastal Storm Risk Management Project, and this project will restore and additional 5.5 miles of the County's coastline through the City of Flagler Beach, Beverly Beach, and the unincorporated areas extending past Varn Park into the Hammock Dunes community.

More opportunities from Florida → Engineering

Same awarding agency

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Site Preparation Contractors

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
Woodbine Road North Widening Project
Solicitation # 26-054
The Woodbine Road North Widening Project, solicitation number 26-054, is a construction effort by the Santa Rosa County Board of County Commissioners to improve roadway capacity, safety, drainage, utility, and multimodal infrastructure. The scope involves widening the existing three-lane roadway into a four-lane urban section from Vinewood Lane to PARA Park, including the construction of associated water system improvements. All work must adhere to FDOT standards, Santa Rosa County and Pace Water System requirements, and applicable federal, state, and local regulations. The project includes specific deliverables such as roadway, signalization, lighting, and water relocation plans, with strict technical specifications for HDPE pipe marking and labeling. Bids must be submitted via the Santa Rosa County Procurement Portal by October 22, 2026, and must be provided in searchable PDF format. Required submission documents include a conflict of interest statement, a debarment form, a Byrd Anti-Lobbying Amendment Certificate, and a Buy America Certificate. Each response must be accompanied by a certified check or bid bond equal to 5% of the base bid. For contracts exceeding 200,000 dollars, performance and payment bonds are required per Florida Statutes. The project mandates compliance with the Davis-Bacon Act for prevailing wages, the Build America, Buy America Act, and various non-discrimination and equal employment opportunity regulations. The contract timeline specifies substantial completion within 80 calendar days and final completion within 110 calendar days from the commencement date. The County reserves the right to reject any or all bids to determine the best interest of the county. Contractors are responsible for the costs of most tests and inspections, though the Owner covers requirements emerging after bid negotiations. Additionally, the contractor must document efforts to utilize minority and women-owned business enterprises as part of the procurement process.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 238120
New
SLED
ITB_MC-2132 Installation of New Crane Stow Pin Sockets at the Talleyrand Marine Terminal
Solicitation # T2027-01
The Jacksonville Port Authority (JAXPORT) is soliciting bids for Contract No. MC-2132 (Project No. T2027.01) to install two new sets of stow pin sockets for securing dockside gantry cranes at the Talleyrand Marine Terminal in Jacksonville, Florida. The scope of work includes the installation of four sockets each at Ft Marker 1565 (Berth 7) and Ft Marker 1720 (Berth 6). Key deliverables involve metal fabrication of sockets and covers, drilling and doweling, rebar and coupler installation, and the placement and finishing of concrete. The project is a lump sum contract with a performance period of 90 calendar days from the Notice to Proceed to substantial completion. Bids are due by November 18, 2026, at 2:00 PM ET and must be submitted electronically via the OpenGov portal. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements for bidders include a pre-bid conference and site visit on October 29, 2026, the submission of a 5 percent bid bond, and the acknowledgment of all addenda. Qualified bidders must provide audited financial statements, evidence of similar project experience, and certifications regarding E-Verify compliance, public entity crimes, and conflict of interest. The successful contractor must adhere to strict security and safety protocols, including mandatory JAXPORT security training and TWIC escort requirements for non-TWIC personnel. Project administration, including invoicing and the submission of shop drawings, will be managed through the Trimble (TID) E-Builder system. Payments will be made monthly at 95 percent of the value of completed work. Additionally, the contractor is required to provide performance and statutory payment bonds and maintain their own quality testing program in accordance with ASTM standards.
Structural Steel and Precast Concrete Contractors

POSTED

5 days ago

DEADLINE

in 22 days
View Details
NAICS: 811310
New
SLED
ITB_EQ-2039A - BLOUNT ISLAND MARINE TERMINAL HANJUNG CRANE #8841 REFURBISHMENT
Solicitation # EQ-2039A
The Jacksonville Port Authority (JAXPORT) is soliciting bids for the complete refurbishment and upgrade of Hanjung Crane #8841 located at the Blount Island Marine Terminal. The scope of work includes moving the crane to a designated service area, performing critical structural repairs, and executing comprehensive corrosion control and painting, including the application of RAL 2004 Pure Orange paint for operator hatch cover height indicators. The project must be completed within 90 calendar days from the receipt of the Notice to Proceed. Award will be based on the lowest price provided the bidder meets all technical specifications and eligibility requirements. Bidders must adhere to strict qualification and compliance standards, including a mandatory 5 percent Small and Emerging Business participation goal and the use of the E-Verify system for employment eligibility. Required submissions include a bid bond for 5 percent of the bid amount, audited financial statements, a conflict of interest certificate, and a sworn statement regarding public entity crimes. Once awarded, the contractor must provide performance and statutory payment bonds and ensure all personnel complete mandatory security and safety training. Contract administration, including monthly progress payments of 95 percent of completed work and the submission of test results, will be managed electronically through the Trimble (TID) E-Builder system.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
SLED
ITB-26-16 - Water Treatment Plant Transfer Pump Station Modifications
Solicitation # ITB-26-16-CW
The City of Port Orange is soliciting competitive bids under solicitation ITB-26-16-CW for the rehabilitation of three transfer pump stations serving the North, Central, and South treatment trains at the Garnsey Water Treatment Plant. The scope of work includes replacing two vertical transfer pumps in each station and upgrading associated piping, pipe supports, electrical components, and concrete pump pads. The project also requires full site restoration of all disturbed areas, including the replacement of sod, concrete, soil, and gravel. The contract allows for a performance period of 365 days from the receipt of the Notice to Proceed to reach substantial completion. Eligible bidders must be certified General Contractors licensed to do business in the State of Florida and maintain an active status with Sunbiz. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including price, past performance on similar projects, technical capacity, financial resources, and safety records. Bidders must provide a bid bond, typically five percent of the bid amount, and maintain comprehensive insurance naming the City of Port Orange as an additional named insured. Submissions must follow a hybrid process, requiring both an electronic submission via OpenGov and a hand-delivered sealed bid containing one original hard copy and one PDF version on a flash drive by the deadline of October 28, 2026, at 2:30 pm EST.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in about 14 hours
View Details
NAICS: 237990
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project, managed by the Santa Rosa County Board of County Commissioners, aims to remedy severe creek bank erosion and enhance resiliency against extreme storm events. The scope of work involves the excavation of unsuitable materials and the revitalization of the creek bank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. Additionally, Bid Alternate A includes the repair of a damaged seawall along the western shore of the creek. All construction must adhere to Santa Rosa County and FDOT standards, with a primary performance period of 120 days, potentially extending by an additional 90 days if Bid Alternate A is selected. The project is supported by an agreement with the Florida Fish and Wildlife Conservation Commission with maximum compensation not to exceed 375,000 dollars. Bidders must be licensed under Chapter 489 of the Florida Statutes and provide a bid guarantee of 5 percent of the total bid price. The contract incorporates several federal requirements, including the Davis-Bacon Act for prevailing wages, the Build America, Buy America Act, and the Copeland Anti Kick Back Act. Performance and payment bonds are required for contracts exceeding 200,000 dollars. Project administration is facilitated through the engineer, Mott MacDonald, who serves as the County representative for inspections and payment certifications.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in about 10 hours
View Details
NAICS: 237310
SLED
Orange Park Neighborhoods - Milling and Resurfacing
Solicitation # 26/27-004
Clay County is soliciting bids for solicitation number 26/27-004 to provide milling and resurfacing improvements for various residential roadways within Orange Park neighborhoods, including Ameca Avenue, Canis Drive, and others. The scope of work involves milling existing asphalt pavement, placing SP-9.5 Traffic Level C asphaltic concrete, applying tack coat, and installing painted and thermoplastic pavement markings. All work must be performed in accordance with Florida Department of Transportation standards and specifications. The selected contractor must be FDOT pre-qualified in Flexible Paving and Hot Plant-Mixed Bituminous Courses and is required to maintain residential and emergency access at all times during operations. The contract will be awarded to the lowest responsive and responsible bidder, with preference given to businesses certifying a drug-free workplace. Substantial completion is required within 60 working days from the Notice to Proceed, with final completion due 30 calendar days after the delivery of the punch list. Bidders must submit their proposals electronically via the County e-Procurement Portal by November 30, 2026. Key requirements include E-Verify registration, compliance with the County's Buy American and local preference policies, and the provision of performance and payment bonds for projects exceeding 200,000 dollars. Final acceptance is contingent upon a mandatory walkthrough with the County Project Manager to correct any identified deficiencies.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS