This Solicitation opportunity from Government of Canada was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Foundation Design Build – Stribling Point Range
Closed
30006908CanadaSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Government of Canada → Department of Fisheries and OceansView Agency
NAICS
N/A
Place of Performance
*Ontario (except NCR), CANSet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Full Description
Show more
1.0 TITLE
St. Mary’s River Towers, Foundation Design-Build - Stribling Point Range for Canadian Coast Guard (CCG).
2.0 DESCRIPTION
2.1 Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to:
2.1.1 Attend a kick-off meeting with the Project Authority to discuss the requirements of the project.
2.1.2 Design of two (2) site-specific concrete foundations for towers supplied by Canadian Coast Guard (CCG);
2.1.3 Legal survey of range line and crown-owned property;
2.1.4 Survey layout of the new front range location;
2.1.5 Supply and installation of two(2) concrete foundations as approved by CCG;
2.1.6 Demolition of one(1) existing skeleton-style tower and concrete foundations.
2.2 CCG Stribling Point range towers are at the end of their lifecycle and are required to be replaced. All sites are accessible by land/vehicle. Photos of the
sites can be found in Figures 1-2, Appendix A to Annex A. The exact coordinates of the sites are as follows:
2.2.1 Stribling Point LL5416 front range tower : 46°18'49.08"N, 84° 6'55.14"W
2.2.2 Stribling Point LL5417 rear range tower: 46°18'37.62"N, 84° 6'13.02"W
3.0 DELIVERY
This Contract’s completion date will be October 31, 2025.
