Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Fremont Peak State Park Vault Restroom Relocation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

FPSP 26-13 Vault Restroom Relocation ADA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Diana FongDistrict Environmental Coordinator

Full Description

Show more
The project proposes relocating an existing non-compliant precast vault restroom from the day-use area to Doe Flat Group Campground in Fremont Peak State Park to address accessibility compliance and equal facilitation for visitors with disabilities. One (1) accessible sized portable chemical toilet will be permanently located on a concrete pad adjacent to the precast vault restroom and one (1) concrete “Van Accessible” parking stall will be constructed to facilitate a level surface for parking and approach to the restrooms with a concrete route of travel constructed to connect the buildings to parking. In the group campground work will: To Install the Precast Vault Restroom Use equipment to excavate a 11 foot long by 11 foot wide by 6 foot deep area; Install a layer of road base or similar aggregate at the bottom of the excavation to create a level installation surface; and Use a crane truck to remove the vault restroom from the current location in the day use area and place the vault restroom into the excavated area within the group campground. For the Accessible Sized Portable Chemical Toilet Use equipment to excavate a 10 feet by 10 feet by approximately 12 inches deep area and pour concrete to create a level surface; and Use equipment to install a 7 foot by 7 foot accessible sized portable chemical toilet on the concrete pad For the Parking and Travel Path Use equipment to excavate an approx. 20 foot by 22 foot by 12 inch deep area and install 6 inches of base rock followed by 6 inches of reinforced concrete to create a level parking surface; Use equipment to excavate an approx. 7 foot wide by 26 foot long by 12 inch deep area to create a path from the parking to the restrooms; Use equipment to install 6 inches of base rock followed by 6 inches of reinforced concrete and create a level path of travel; Install truncated domes between the travel route and the parking area; and Installed boulders between the travel route and the parking area to act as dividers.

Similar Contracts