Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

E-Wells PFAS Groundwater Treatment Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clarita Valley Water Agency is undertaking the E-Wells PFAS Groundwater Treatment Improvements Project to construct a centralized treatment facility and associated pipelines for collecting and treating groundwater drawn from Wells E-14, E-15, E-16, and E-17 in Santa Clarita, California. The facility will treat per- and polyfluoroalkyl substances to concentrations below the federal Maximum Contaminant Level, enabling the activation of Wells E-14 and E-16 with a combined production capacity of up to 2,400 gallons per minute, while maintaining but not increasing the historical output of the already active Wells E-15 and E-17. This project directly supports the agency’s goals under the Groundwater Sustainability Plan and Urban Water Management Plan by restoring local groundwater use, reducing reliance on imported water supplies, and ensuring long-term water resource resilience. Construction is scheduled to begin in January 2027 and conclude by December 2028, with grading and excavation expected to occur from March to the end of 2027 and drainage, utilities, and sub-grade work following into late 2028. The completed facility will operate continuously, 24 hours a day, 365 days a year, with routine maintenance including weekly staff visits, bimonthly chemical deliveries, and resin media replacement every four to six months. The project site spans portions of Assessor’s Parcel Numbers 2866-002-061, 3271-030-091, and 2866-003-011, with infrastructure crossing public rights-of-way including Commerce Center Drive, Henry Mayo Drive, The Old Road, and Hancock Parkway. Environmental compliance is a central requirement, mandating the presence of a qualified biologist on-site throughout construction to conduct pre-construction clearance sweeps for nesting birds and special-status species, document observations, recommend protective actions, and submit daily and weekly compliance logs for agency review. Construction crews must adhere to strict best management practices, including a 10-mph speed limit on unpaved areas, fencing or sloping of excavations to prevent wildlife entrapment, daily removal of food waste in sealed containers, prohibitions on feeding wildlife or bringing pets or firearms onto the site, and conducting all equipment maintenance in designated staging areas. Night work requires downward-directed, shielded lighting to minimize light spill, and any incident involving injury or death of

General Info

Construct PFAS treatment facility for four wells, restore groundwater use, reduce imports, begin 2027, operate 24/7, ensure environmental compliance.

Agency

California → Santa Clarita Valley Water Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Commerce Center Drive and Henry Mayo Drive, Santa Clarita, CA

Set-Aside

NONE

Documents

(4)

SCV Water E Wells PFAS Groundwater Treatment Improvements Project Summary

PDFenvironmental-summary

SCV Water E Wells PFAS Groundwater Treatment Notice of Intent

PDFspecial-notice

SCV Water E-Wells PFAS Groundwater Treatment Improvements Project Final NOC

PDFnotice-of-completion

E-Wells PFAS Groundwater Treatment Improvements Project Draft Initial Study - Mitigated Negative Declaration

PDFinitial-study-mnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Clarita Valley Water Agency
Office AddressN/A
Contacts
Amanda AntonelliSupervising Environmental Planner

Interested Companies (1)

Show more
Rincon Consultants
Los Angeles, CA

Full Description

Show more
The project involves construction of a per- and polyfluoroalkyl substances (PFAS) groundwater treatment facility and associated pipelines to collect and treat groundwater pumped from Wells E-14, E-15, E-16, and E-17. The project would not expand the capacity or increase historical production from recently active Wells E-15 and E-17 and would enable SCV Water to activate Wells E-14 and E-16 for groundwater production in accordance with the Groundwater Sustainability Plan and Urban Water Management Plan. The project would treat PFAS in pumped groundwater to levels below the federal Maximum Contaminant Level, restore the use of the E-Wells, and reduce SCV Water’s dependency on imported water. Construction would occur between approximately January 2027 and December 2028. The E-Wells and treatment facility would operate 24 hours per day, 365 days per year. Maintenance activities would include four maintenance staff visits per week, bimonthly chemical deliveries, and resin media replacement approximately every four to six months.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 1 hour ago

DEADLINE

in 30 days
View Details