Plant F20 Reservoirs Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Plant F20 Reservoirs Project entails the construction and operation of two new 1.28 million-gallon potable water reservoirs—East Reservoir and West Reservoir—in Fontana, California, within the San Gabriel Valley Water Company’s service area. These reservoirs are designed to enhance water storage capacity to meet domestic, fire suppression, and emergency demand needs for the City of Fontana. Construction is scheduled to begin on February 2, 2026, and conclude by July 1, 2027, with distinct phases including site preparation, grading, infrastructure and tank installation, paving, and architectural coating. The project site is located near 15151 Long View Drive, with associated Assessor’s Parcel Numbers 0237-411-17 and 0237-411-15. The State Water Resources Control Board is the overseeing agency, and project documentation includes detailed technical submittals such as subsurface exploration maps, site plans, site photographs, and assessments of potentially occurring special-status biological resources. Compliance with environmental and water quality regulations is central to the project, enforced through a Water Quality Management Plan certified under Regional Water Quality Control Board Order No. R8-2010-0036. Key performance standards require adherence to ASTM D1557 for soil compaction (minimum 90% relative compaction), the San Bernardino County Hydrology Manual, and the Technical Guidance Document for Water Quality Management Plans. Inspection and acceptance occur on-site, with the contractor responsible for implementation and maintenance of Best Management Practices, while the City retains authority to enforce compliance and order corrective actions. Packaging and storage of materials must follow general environmental protection measures—including use of labeled original containers, protection from rain and contamination, and covered storage—though military-specific packaging standards are not required. No formal contract value, pricing structure, acquisition type, or federal procurement clauses are documented, nor are federal identifiers such as UEI or CAGE codes provided. The project is identified as a forecast entry with no solicitation or contract number, and while certifications and environmental compliance are robustly detailed, the documentation lacks standard federal contract administration elements such as payment terms, invoicing methods, contracting officer details, or award evaluation factors.

General Info

Construction of two 1.28-million-gallon water reservoirs in Fontana, CA, to enhance storage and emergency supply, with strict environmental compliance.

Agency

California → State Water Resources Control Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

In proximity to 15151 Long View Drive, Fontana, CA, 92337

Set-Aside

NONE

Documents

(13)

Appendix G - Noise Analysis Memorandum for Fontana Plant F20 Reservoirs Project

PDFnoise-analysis-memo

Appendix A - Air Quality and Greenhouse Gas Memorandum for Fontana Plant F20 Reservoirs

PDFmemorandum

Appendix D - Energy Memo for Fontana Plant F20 Reservoirs Project

PDFenergy-assessment-memo

Appendix C - Cultural Resources Assessment for San Gabriel Water Company Plant F20 Project

PDFcultural-resources-assessment

Appendix E - Geotechnical Investigation for San Gabriel Valley Water Company Plant F20

PDFgeotechnical-investigation

Appendix B Biological Resources Assessment for Plant F20 Water Storage Project

PDFbiological-resources-assessment

Appendix H - Vehicle Miles Traveled Analysis for Plant F20 Reservoirs Project

PDFtechnical-report

Initial Study/Mitigated Negative Declaration for Plant F20 Reservoirs Project

PDFmitigated-negative-declaration

Summary_Form_SGVWC Fontana F20

ZIP

NOI_SGVWC Fontana F20

ZIP

16872-02 AQ & GHG Assessment Technical Memorandum

PDFtechnical-memorandum

Appendix F - Hydrology and Water Quality Management Report for San Gabriel Valley Water Company Plant F20

PDFhydrology-report

Notice of Completion - Plant F20 Reservoirs Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Wendy PierceSenior Environmental Scientist
Karolina GuzmanEngineering Manager

Full Description

Show more
The Applicant proposes the construction and operation of two new 1.28 million-gallon reservoirs, East Reservoir and West Reservoir, which are to be used for potable water services within the San Gariel Valley Water Company Fontana’s service area. The proposed reservoirs would be constructed to allow San Gariel Valley Water Company Fontana to provide necessary water storage to meet the existing demands for domestic usage, fire suppression, and emergencies from the City of Fontana.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive suite of airfield infrastructure upgrades at the Port of Seattle, targeting critical safety, operational, and regulatory needs through multiple interrelated projects. Key components include replacing airfield lighting circuits with degraded megger readings, installing modern LED lighting fixtures and signs to enhance visibility and energy efficiency, and replacing failing pavement and essential utilities to maintain structural integrity and service reliability. Wildlife hazard mitigation efforts involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signage to deter bird activity, and addressing ponding issues through regrading and new storm drainage infrastructure to reduce attractants and improve site drainage. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. All work falls under the NAICS code 237990 for other heavy and civil engineering construction, reflecting the scale and complexity of the airfield system enhancements. The contract is forecasted by the Aviation Project Management Group under the Port of Seattle, with Yanet Maldonado serving as the primary point of contact for inquiries. Although the solicitation number is not yet assigned, the posted date indicates preparation for bidding in 2026 with an anticipated performance window aligned to the 2028 timeframe referenced in the title. The scope reflects a strategic, multi-year investment in airfield safety, compliance, and long-term sustainability, integrating environmental, operational, and emergency preparedness objectives into a single coordinated procurement.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract encompasses a major airfield modernization initiative focused on improving safety, efficiency, and compliance at the Port of Seattle’s airfield facilities. Key work includes replacing aging lighting circuits with low megger readings with new LED lighting fixtures and signs to enhance visibility and reduce maintenance, updating failing pavement sections and critical utilities to ensure structural integrity and operational continuity, and addressing wildlife hazards by removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs, and mitigating ponding through regrading and new storm drainage infrastructure. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is formally designated as Contract 1 under the 2027 Airfield Project, managed by the Aviation Project Management Group within the Port of Seattle, with a NAICS code of 237990 indicating it falls under other heavy and civil engineering construction. No set-aside provisions are specified, and the work is scheduled to be performed at the airport’s existing airfield locations. The primary point of contact is Jay Kim, reachable via email or phone, with Mengqi Wu serving as the project manager. The solicitation was posted on July 20, 2026, and further details can be accessed through the Port’s official solicitation portal.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves a comprehensive modernization of airfield infrastructure at the Port of Seattle, focusing on upgrading lighting systems, pavement, utilities, and safety features to meet current operational and safety standards. Key work includes replacing aging airfield lighting circuits that exhibit low megger readings with new LED fixtures and signs to improve visibility, energy efficiency, and longevity. Concurrently, failing pavement sections and critical utility lines will be removed and rebuilt to ensure structural integrity and uninterrupted airfield operations. Wildlife hazard mitigation is a major component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure to reduce attractants and improve drainage. Additionally, the project requires the replacement of deteriorating flush fire hydrant access hatches to ensure reliable and rapid firefighter access during emergencies. The contract is forecasted under the NAICS code 237990, indicating specialized construction activities not elsewhere classified, and is managed by the Aviation Project Management Group under the Port of Seattle. Primary point of contact is Moraa Omwega, with David Neds serving as the project manager, and all correspondence and inquiries should be directed through their provided contact information. The solicitation was posted in July 2026, with anticipated activities leading toward execution in 2027.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
RFP AR27-01 - York Spit Reef Deployment 2The contract seeks qualified vendors to load, transport, and deploy reinforced concrete pipe and concrete structural components at the York Spit Reef site in the Chesapeake Bay, Virginia, with the deployment location specified as 417 Octavia Drive, Tabb, VA 23696. All work must be performed in compliance with site-specific technical and logistical requirements outlined in the solicitation, ensuring safe and accurate placement of materials to support habitat restoration efforts. The project is managed by the Virginia Marine Resources Commission under solicitation number RFP-124685, with a response deadline of August 3, 2026, at 7:00 PM Eastern Time, and all proposals must be submitted through the designated vendor portal by that date. The contracting authority is a state-level agency, and the solicitation does not specify a set-aside classification or NAICS code. The point of contact for questions and submissions is Brandy Battle, reachable via email at brandy.battle@mrc.virginia.gov or phone at 757-247-2260. Vendors are expected to demonstrate experience with marine logistics, heavy lifting, and deployment of large concrete structures in open water environments, with a strong emphasis on environmental compliance and safety protocols. All activities must be coordinated with the location and regulatory constraints inherent to the York Spit Reef site within the Chesapeake Bay.
Marine Resources Commission

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details