Plant F20 Reservoirs Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Plant F20 Reservoirs Project, led by the State Water Resources Control Board for the San Gabriel Valley Water Company, involves the construction and operation of two new 1.28-million-gallon welded steel potable water reservoirs, designated as the East and West Reservoirs, in Fontana, California. Each tank will measure 74 feet in diameter and 40 feet in height. The project is designed to meet domestic usage, fire suppression, and emergency water storage demands for the City of Fontana. Associated site work includes the installation of a retaining wall system ranging from 1 to 26 feet in height to create a level pad, as well as new pipelines, pavement improvements, block walls, and wrought iron fencing. The project is subject to comprehensive environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration issued to address air quality, greenhouse gas emissions, noise, biological resources, and energy consumption. Technical assessments have confirmed that the project will have less than significant impacts on transportation, cultural resources, and air quality. Construction must adhere to the California Building Code, OSHA, American Water Works Association standards, and CALGreen requirements. Site management includes a storm water detention system with a capacity of 6,929 cubic feet and strict adherence to hazardous material storage and labeling standards.

General Info

Construction of two 1.28-million-gallon water reservoirs in Fontana, CA, to enhance storage and emergency supply, with strict environmental compliance.

Agency

California → State Water Resources Control Board

Place of Performance

In proximity to 15151 Long View Drive, Fontana, CA, 92337

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Wendy PierceSenior Environmental Scientist
Karolina GuzmanEngineering Manager

Full Description

Show more
The Applicant proposes the construction and operation of two new 1.28 million-gallon reservoirs, East Reservoir and West Reservoir, which are to be used for potable water services within the San Gariel Valley Water Company Fontana’s service area. The proposed reservoirs would be constructed to allow San Gariel Valley Water Company Fontana to provide necessary water storage to meet the existing demands for domestic usage, fire suppression, and emergencies from the City of Fontana.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 12 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS