Dry Canyon Reservoir Maintenance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Department of Water and Power is undertaking annual vegetation maintenance at the Dry Canyon Reservoir dam, a facility under the regulatory oversight of the California Department of Water Resources Division of Safety of Dams. The work involves removing approximately one acre of woody vegetation and trees from the upstream slope within ten feet of the dam’s toe and clearing vegetation within a ten-foot radius of the ungated outlet at the dam’s toe. All removed material must be transported and deposited in a designated upland disposal area located about five hundred feet east of the removal site. The project has been previously surveyed, confirming the absence of sensitive biological or cultural resources, and environmental mitigation measures including worker training, pre-construction surveys, and ongoing monitoring will be implemented to ensure compliance with California Environmental Quality Act (CEQA) categorical exemptions under Sections 15301 and 15304, which classify the activity as routine maintenance and a minor alteration to land. The place of performance is Santa Clarita, California, with Alexandria Fortaleza serving as the primary environmental point of contact. No contract value, pricing details, delivery schedules, FOB terms, invoicing instructions, or formal federal acquisition regulation clauses are included in the documentation, as this is an environmental exemption notice under CEQA rather than a federally governed procurement contract. The agency code provided is 3dac4901 and the contract is listed as a forecast with no solicitation number, amendment, or specified contract type such as FFP or IDIQ. While the Los Angeles Department of Water and Power is the responsible entity for performing the work, no formal COR, COTR, or PCO roles are designated in the provided materials, and no socioeconomic certifications, UEI codes, or special contractual requirements beyond environmental compliance are identified.

General Info

Annual vegetation removal near Dry Canyon Reservoir dam, Santa Clarita, under CEQA environmental exemptions.

Agency

California Los Angeles Department of Water and Power

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Santa Clarita, CA

Set-Aside

NONE

Documents

(1)

Dry Canyon Reservoir Vegetation Maintenance Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Alexandria FortalezaEnvironmental Specialist

Full Description

Show more
The Los Angeles Department of Water and Power's (LADWP) Dry Canyon Reservoir dam is under the jurisdiction of the Department of Water Resources - Division of Safety of Dams. The latest inspection conducted in November 2024 determined that maintenance by LADWP was required. Maintenance activities will be conducted annually and will include vegetation management on the upstream slope to remove approximately one acre of woody and dense vegetation and trees at least 10 feet from the upstream toe of the dam. Additional maintenance will include vegetation clearance of a radius of 10 feet from the ungated outlet at the toe of the dam. Spoils from vegetation removal will be placed in a separate upland area approximately 500 feet east of the vegetation removal area. The vegetation proposed for removal has been previously surveyed and no sensitive resources were observed. Avoidance and minimization measures including worker environmental awareness training, preconstruction surveys and monitoring will be incorporated with construction to ensure avoidance of potential impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 18 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details