Dry Canyon Reservoir Maintenance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Department of Water and Power is implementing the Dry Canyon Reservoir Maintenance Project in Santa Clarita, California, to address maintenance requirements identified during a November 2024 inspection by the Department of Water Resources Division of Safety of Dams. The project involves annual vegetation management on the upstream slope of the dam, specifically the removal of approximately one acre of woody and dense vegetation and trees while maintaining a 10-foot buffer from the upstream toe. Additionally, the scope includes clearing vegetation within a 10-foot radius of the ungated outlet at the toe of the dam, with all resulting spoils to be relocated to an upland area approximately 500 feet to the east. To ensure environmental compliance, the project incorporates worker awareness training, pre-construction surveys, and active monitoring to avoid impacts on sensitive resources. The project is classified under NAICS code 237990 and is categorically exempt under California Environmental Quality Act sections 15301 and 15304, as it involves minor maintenance and land alterations. Alexandria Fortaleza serves as the primary point of contact for this effort.

General Info

Annual vegetation removal near Dry Canyon Reservoir dam, Santa Clarita, under CEQA environmental exemptions.

Agency

California Los Angeles Department of Water and Power

Place of Performance

Santa Clarita, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Alexandria FortalezaEnvironmental Specialist

Full Description

Show more
The Los Angeles Department of Water and Power's (LADWP) Dry Canyon Reservoir dam is under the jurisdiction of the Department of Water Resources - Division of Safety of Dams. The latest inspection conducted in November 2024 determined that maintenance by LADWP was required. Maintenance activities will be conducted annually and will include vegetation management on the upstream slope to remove approximately one acre of woody and dense vegetation and trees at least 10 feet from the upstream toe of the dam. Additional maintenance will include vegetation clearance of a radius of 10 feet from the ungated outlet at the toe of the dam. Spoils from vegetation removal will be placed in a separate upland area approximately 500 feet east of the vegetation removal area. The vegetation proposed for removal has been previously surveyed and no sensitive resources were observed. Avoidance and minimization measures including worker environmental awareness training, preconstruction surveys and monitoring will be incorporated with construction to ensure avoidance of potential impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS