McCormack-Williamson Tract, Dead Horse Cut Stream Gage Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The McCormack-Williamson Tract, Dead Horse Cut Stream Gage Installation Project, managed by Reclamation District 2110, involves the installation and operation of a new stream gage at the southeast corner of Dead Horse Island in Walnut Grove, Sacramento County. The primary objective is to collect water elevation and quality data from Dead Horse Cut, with all collected data to be uploaded to the California Data Exchange Center for public accessibility. The project is classified under NAICS code 237990 and is identified as a forecast with a posted date of July 15, 2026. The physical scope of work includes installing an enclosure with solar panels mounted on two-inch galvanized steel pipes with concrete footings on the southeast levee. A sonde transmitter and bubbler line will be installed, with the transmitter line enclosed in a steel pipe fastened above ground on the waterside levee slope. The project requires minor trenching and backfilling within a previously disturbed levee area. Due to the minimal environmental impact and lack of tree removal, the project is exempt under CEQA Regulations sections 15303, 15304, 15305, and 15306. Michael Kynett serves as the primary point of contact and District Engineer for the project.

General Info

Solar-powered stream gage installed on Dead Horse Island to monitor water data and transmit real-time readings to state center.

Agency

California → Reclamation District 2110

Place of Performance

CA, 95690

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 2110
Contacts1 person available
OfficeN/A
Organization / Agency
California → Reclamation District 2110
Office AddressN/A
Contacts
Michael KynettDistrict Engineer

Full Description

Show more
The proposed project would install and operate one new stream gage on the southeast corner of Dead Horse Island to collect data on water elevations and quality in Dead Horse Cut. The stream gage data would be uploaded to the California Data Exchange Center where it would be accessible to the public. The proposed stream gage would include an enclosure with solar panels mounted on two two-inch galvanized steel pipes with concrete footings. The enclosure would be installed on the Dead Horse Island's southeast levee. A sonde transmitter and bubbler line would run down the waterside levee slope to Dead Horse Cut. The sonde transmitter line would be enclosed in a steel pipe fastened above ground on the levee slope. The project would involve minor trenching and backfilling on the levee which is a disturbed area.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS