Full-Scale Parking Lot Construction

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the full turn-key construction of a 100-vehicle parking lot at the James J. Rowley Training Center in Laurel, Maryland, managed by the U.S. Secret Service under the Department of Homeland Security. Scope of work includes comprehensive site preparation with grading, paving, striping, stormwater drainage systems, ADA-compliant access features, and final site clean-up to meet federal security standards. All elements must adhere to stringent regulatory requirements for accessibility and environmental compliance, with particular attention to effective stormwater management solutions. The project is classified under NAICS code 237310 and is issued as a subcontract opportunity with a response deadline of July 15, 2026, and was posted on July 1, 2026. Performance is required at the specified location in Laurel with ZIP code 20708.

General Info

Turn-key parking lot construction for U.S. Secret Service in Laurel, Maryland, with ADA and stormwater compliance by July 15, 2026.

Agency

Department Of Homeland Security → U S Secret ServiceView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Laurel, MD, 20708, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → U S Secret Service
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Homeland Security → U S Secret Service
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Turn-key design, grading, paving, striping, drainage, and final clean-up for a 100-vehicle parking lot at the James J. Rowley Training Center. Includes ADA compliance, stormwater management, and federal security standards.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details