This Solicitation opportunity from Department Of Energy was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Glendo-Lusk Rural Tap and Quinn Creek Substation

Closed
89503226BWA000073Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 15 hours ago

DEADLINE

in 17 days
NAICS: 237130
New
SLED
Wood Pole Inspection, Joint Use Inventory & NJUNS Coordination Services
Solicitation # RFP26-27
The City of Winter Park Electric Utility is soliciting proposals for wood pole inspection, condition assessment, joint-use attachment inventory, and NJUNS coordination services for approximately 3,500 utility poles. The primary objective is to enhance system reliability and asset management through the use of non-destructive evaluation techniques, specifically ultrasonic or equivalent technologies, to identify internal decay and structural deterioration. Beyond inspections, the selected contractor will be responsible for providing physical stabilization and bracing for deficient poles, documenting third-party attachments, and managing NJUNS tickets for poles where electric facilities have been removed. The procurement process follows a two-phase evaluation: an initial scoring of proposals based on price, delivery approach, experience, personnel, and professional contacts, followed by oral presentations for shortlisted firms. Compliance requirements are extensive, including adherence to the Build America, Buy America Act, Davis-Bacon Act labor standards, ADA and WCAG 2.0 AA accessibility standards, and Florida's Public Records Law. Proposals must be submitted electronically via the City's procurement portal by October 13, 2026, at 10:00 am. Payment is governed by the Florida Local Government Prompt Payment Act with standard net 30 terms, and the City prefers payment via a VISA platform.
Electric Utility

POSTED

about 24 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, is soliciting proposals for the Power Construction and Services II (PCS II) Multiple Award Task Order Contract (MATOC). This firm-fixed-price IDIQ contract aims to establish a pool of three to seven contractors to provide power construction and services in contingency or austere environments. The scope of work covers the United States Central Command (CENTCOM) Area of Responsibility and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The total shared contract capacity is 249,000,000 dollars, with a primary period of performance from June 7, 2027, to June 6, 2032. The contract encompasses single-source responsibility for the construction of low, medium, and high voltage electrical systems, as well as the operation and maintenance of power plants and distribution systems. Key requirements include the ability to provide personnel and equipment for preventive, scheduled, and emergency maintenance, as well as fueling operations for diesel generator sets. Award decisions will be based on a best-value tradeoff process, evaluating technical approach and past performance, with the combined non-priced factors being approximately equal in importance to price. Proposals must be submitted electronically via the PIEE Solicitation Module by October 13, 2026.
W2SD Endist Philadelphia

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 237130
New
Federal
CJAG Underground Utilities Construction
Solicitation # W9136426QA076
Solicitation W91364-26-Q-A076 is a 100% small business set-aside for the construction of underground utilities at the Load Line 6 area of Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project, valued between $500,000 and $1,000,000, involves the installation of approximately 9,900 linear feet of open-cut trenching, 60 linear feet of dual-wall fuel lines with four termination points, and 500 linear feet of grounding rods. The scope also includes electrical and communications conduit routes, pull boxes, concrete-encased roadway crossings, backfill, compaction, and stone-road restoration. The work must be completed within 60 days following the issuance of the notice to proceed. The government will award a firm-fixed-price purchase order based on a best-value determination, evaluating technical acceptability, relevant past performance in medium-voltage electrical systems or similar infrastructure, and price reasonableness. Bidders must provide a bid guarantee with their offer, and performance and payment bonds are required no later than 10 days after receipt of the order. Quotations are due by September 24, 2026, at 10:00 AM EDT and must be submitted electronically to Barry Beale. Required submission materials include a detailed price quotation, a project schedule, key personnel qualifications, and documentation of all necessary licenses and permits.
W7NU Uspfo Activity Oh Arng

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Western Area Power Administration (WAPA) is seeking a contractor to execute a comprehensive upgrade of the Glendo-Lusk Rural Tap 69kV transmission line to a 115kV system and construct a new Quinn Creek Substation to enhance grid reliability and efficiency. The project involves removing approximately 35 miles of aging single-pole wood transmission infrastructure and replacing it with 115kV wood H-frame construction, with 34 miles following the existing alignment and 2 miles on a new route. The new Quinn Creek Substation, located approximately 25 miles northeast of Glendo, requires full design, fabrication, and installation of electrical systems including a 115/69/13.8-kV 50 MVA power transformer (government-furnished), circuit breakers, disconnect switches, grounding systems, control switchboards, indoor termination cabinets, and a 125 DC station battery system with chargers. All work must comply with WAPA’s Construction Standards, Standard Drawings, and Electrical Equipment Standards, with detailed specifications outlined across six technical attachments covering transmission line and substation requirements, commissioning, geotechnical conditions, and as-built documentation. The solicitation is a 100% Small Business Set-Aside under NAICS Code 237130, and the Government contemplates award of a Firm-Fixed Price contract with a mandatory performance period of 800 calendar days after issuance of the Notice to Proceed, commencing no later than 10 days after award. Contractors must submit electronic bids exclusively through FedConnect by the August 3, 2026 deadline and are required to bid on all items in the solicitation to remain responsive; failure to do so results in automatic disqualification. The bid schedule includes specific line items for conductor types, substation metalwork, electrical equipment, and mobilization work, with all equipment subject to stringent marking, labeling, and packaging specifications—including four-way pallets for indoor cabinets and heat-shrink marker sleeves with machine-printed, indelible black lettering on white for wire identification. Factory Acceptance Testing (FAT) must be witnessed by the Contracting Officer’s Representative, with results and punch lists submitted electronically or in hard copy. Comprehensive commissioning is required, including pre-, during-, and post-commissioning phases, with deliverables such as Standard Operating Procedures, RTU point lists, RTAC settings, training for WAPA personnel, detailed test records, as-built

General Info

Upgrade Glendo-Lusk 115kV line, build Quinn Creek Substation, enhance Wyoming power reliability.

Agency

Department Of Energy → Western Rocky Mountain RegionView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(8)

WAPA ES 2.5 Control Switchboards & Indoor Termination Cabinets Specifications

PDFspecifications

Appendix C QCK Option CLIN Contract Commissioning Specifications

PDFspecifications

Quinn Creek Substation Control Building Specifications Part 3 of 6

PDFspecifications

Attch A6. Specs_APPENDIX_D_QCK_Geotechnical_Report.pdf

PDF

Glendo-Lusk Rural Tap 115kV Upgrade Project Specifications Part 1 of 6

PDFspecifications

Quinn Creek Substation Stage 01 Project Specifications Part 2 of 6

PDFspecifications

IFB 89503226BWA000073 Glendo-Lusk 115kV Transmission Line Upgrade

PDFifb

IFB 89503226BWA000073 Glendo-Lusk 115kV Transmission Line Upgrade

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Rocky Mountain Region
Contacts1 person available
OfficeLoveland, CO, 80539-8986, USA
Organization / Agency
Department Of Energy → Western Rocky Mountain Region
View Agency Profile
Office AddressLoveland, CO, 80539-8986, USA
Contacts
John PrattContracting Officer

Full Description

Show more
The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA’s ability to provide reliable and cost-efficient electric power, aligning with WAPA’s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo – Lusk Rural Tap 69kV line.
RSVP - NLT 22 June 2025 [Must RSVP by this date if you plan to attend the site visit](RSVP email: Mr. Bronson Perry, Engineering Field Supervisor, bperry@wapa.gov and cc'd Mr. John Pratt, jpratt@wapa.gov) Meet Location: Sinclair Gas Station 106 A St Glendo, WY 82213 (We will leave from the gas station to the Glendo substation as a caravan. From there we will head to Quinn Creek Substation location then Lusk Rural Tap) Site Locations: Platte and Niobrara, 82213, 82227, 82225 Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213 Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84 Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS