Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Energy was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sidney Substation Breaker Replacement

Closed
89503226BWA000076Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 22 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract pertains to the replacement of three power circuit breakers and associated equipment at the Sidney Substation located at 2297 Road 111, Sidney, Nebraska, involving comprehensive demolition, site development, and installation of new electrical infrastructure. The scope includes constructing foundations and platforms for substation equipment, installing three Government-furnished 115-kV, 3000-amp power circuit breakers, three Government-furnished coupling capacitor voltage transformers (CCVTs), and two CCVT support pedestals, as well as furnishing and installing high voltage bus, grounding systems, conduit, and insulated cables. All work must comply with standardized divisions covering sitework, concrete, steel structures, and substation electrical systems, and is governed by the Blanket CX for Routine Maintenance Activities at Existing Substations and Switchyards. Equipment must be labeled as “No-PCB” if oil-filled, and all materials must adhere to applicable label directions. The contractor is responsible for inspecting Government-furnished circuit breakers for damage during shipment and reporting any issues to the WAPA Contracting Officer’s Representative. Bids must be submitted electronically via FedConnect as a single PDF file by the deadline of July 24, 2026, and must include all line items under a strict all-or-nothing bidding requirement; failure to include any item renders the bid nonresponsive. The estimated contract value ranges between $500,000 and $1,000,000, with performance required to be completed within 365 calendar days after award and notice to proceed, and a detailed construction schedule must be submitted with every invoice and as directed by the COR. The contract incorporates numerous Federal Acquisition Regulation and Department of Energy-specific clauses, including requirements for affirmative action in employment, construction wage rate compliance, Buy American Act adherence, and prohibitions against polychlorinated biphenyls (PCBs) in oil-filled equipment. The contractor must provide bid, performance, and payment bonds, comply with OSHA standards under 29 CFR 1910, 1925, and 1926, and operate under a drug-free workplace policy. Technical correspondence must be directed to the Contracting Officer’s Representative, with copies to the Contracting Officer and Contract Specialist, both identified as John Pratt at the Western Rocky Mountain Region of the Department of Energy, with invoicing required through Procore’s Email tool prior to IPP submission, with specific formatting rules for subject

General Info

Replace circuit breakers and install electrical equipment at Sidney Substation, Nebraska by July 24, 2026.

Agency

Department Of Energy → Western Rocky Mountain RegionView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(10)

Blanket CX for Routine Maintenance Activities at Existing Substations and Switchyards 2021-035

PDFcategorical-exclusion

Sidney Substation 115kV Breaker Replacement Project Specifications

PDFspecifications

Attachment E Bid, Performance, Payment Bonds - 89503226BWA000076

PDFbond-forms-instructions

Sidney Substation 2026 Breaker Replacement Project Drawings

PDFspecifications

Wage Determination NE20260037 Heavy Construction Cheyenne County Nebraska

PDFwage-determination

SF24-16e Bid Bond Form

PDFbid-bond

IFB 89503226BWA000076 Sidney Substation Breaker Replacement

PDFifb

IFB 89503226BWA000076 Sidney Substation Breaker Replacement

PDFifb

Wage Determination NE20260030 Highway Construction Nebraska

PDFwage-determination

Wage Determination NE20260082 Building Construction Nebraska

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Rocky Mountain Region
Contacts1 person available
OfficeLoveland, CO, 80539-8986, USA
Organization / Agency
Department Of Energy → Western Rocky Mountain Region
View Agency Profile
Office AddressLoveland, CO, 80539-8986, USA
Contacts
John PrattContracting Officer

Full Description

Show more
Sidney Substation Breaker Replacement; SD566 SD662 SD862 BREAKER REPLACEMENTS: demolition and site development, foundations and platforms for substation electrical equipment, installation of three (3) Government-furnished power circuit breakers, installation of three (3) Government-furnished CCVTs and two (2) Government-furnished CCVT support pedestals, and furnishing and installing high voltage bus, grounding system, conduit, and insulated cables.
Sidney Substation 2297 Road 111 Sidney, NE 69162 Directions: From the town of Sidney head north on 13th Avenue from Illinois St (Hwy 30) for 0.4 miles to Cedar Street. Turn left and go 0.3 miles to 17th Avenue (Haskell Hill Road). Turn right and go 0.9 miles to substation on the right. Note Sidney 230 (Tri-State) is the southeast portion of the yard, with Sidney 115 (Western) toward the northwest.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS