Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Energy was posted on June 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

115kV Disconnect Switch Installation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 22 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves furnishing and installing a new 115kV disconnect switch, which includes integrating it with existing bus work to enhance the flexibility of load feeding and facilitate maintenance operations. This subcontract is managed by the Department of Energy’s Western Rocky Mountain Region. The project aligns with NAICS code 237130, which pertains to power and communication line and related structures construction. The contract posting date is June 12, 2026, with a response deadline set for July 6, 2026. Although specific details about the location, point of contact, and set-aside status are not provided, the primary objective centers on ensuring a seamless upgrade to the electrical infrastructure to support operational flexibility and maintenance efficiency. The procurement is accessible through the FedConnect portal, allowing qualified subcontractors the opportunity to respond within the given timeframe.

General Info

Supply and install 115kV disconnect switch to improve load flexibility, managed by DOE Western Region.

Agency

Department Of Energy → Western Rocky Mountain RegionView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 89503226BWA000078.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

North Gunnison Substation 115kV Switch Install

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Rocky Mountain Region
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Western Rocky Mountain Region
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnish and install a new 115kV disconnect switch, including integration with existing bus work to support flexible load feeding and maintenance.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS