Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on January 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H244--*H244 SOURCES SOUGHT* Boiler Plant Services (VA-25-00038967)

Closed
36C26325Q0374Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 5 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 5 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Department of Veterans Affairs St. Cloud VA Health Care System 4801 Veterans Drive, St. Cloud, MN, 56303-2015

Set-Aside

SDVOSBC

Documents

1

36C26325Q0374 - Boiler Plant Services (St. Cloud VA)

DOCX, Low priority13 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts1 person available
OfficeSaint Paul, MN, 55101, USA
Office AddressSaint Paul, MN, 55101, USA
Contacts
Timothy KimmelContracting Officer

Full Description

Show more
STATEMENT OF WORK 1. TITLE: Boiler Plant Instrumentation Calibration, Combustion and Tune, Device Testing and Motor Vibration Analysis services to support the St. Cloud VA Health Care System. 2. OVERVIEW: The contractor shall provide boiler safety device testing, tuning, inspection, calibration of boiler plant equipment, burners, controls, instruments at the frequency described on the schedule below. 3. DEFINITIONS: a. CO Contracting Officer b. VA Department of Veterans Affairs c. VAHCS St. Cloud VA Health Care System d. VATR Veterans Affairs Technical Representative e. Contractor Employee means all Contractor staff, technicians, personnel, subcontractors, or persons working on behalf of the Contractor. 4. PLACE OF PERFORMANCE: St. Cloud VA Health Care System, 4801 Veterans Drive, St. St Cloud, MN 56303 PERIOD OF PERFORMANCE: This contract will be a Single Award, Firm Fixed Price Service Contract for 1 (One) Base Year from with 4 (Four) Option Years. QUALIFICATIONS AND SPECIAL CERTIFICATIONS: Certified Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAHCS plant. The VAHCS facility manager/engineer may define and accept equivalent qualifications. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: NFPA 85, Boiler and Combustion Systems Hazards Code. VHA Boiler Plant Safety Device Testing Manual, most current edition. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, to calibrate all instruments, gauges, and transmitters as required herein. All must be calibrated within one month prior to test P-1 and P-4, or recalibration must be completed. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this. Any anticipated sub-contracting work shall be presented in a sub-contracting plan, which is to include the identity of the sub-contractor who will be performing the work. The CO and the VATR must approve, in writing, any sub-contract work prior to its commencement. The contractor shall provide experience, past performance, and references with their bid submission. REGULATIONS / DIRECTIVES / POLICIES: VHA Directive 1810, Boiler and Boiler Plant Operations (most current version) VHA Boiler Plant Safety Device Testing Manual (most current version) Master Construction Specification, Division 23- Heating, Ventilating and Air Conditioning. NFPA 85 - National Fire Protection Association. Boiler and Combustion Systems Hazards Code (most current edition) Boiler Safety Device Testing Data Sheet Combustion Performance Data Sheet Compliance with all state, federal, and local laws SCOPE OF WORK: The Contractor shall provide all transportation, lodging, meals, labor, personnel, equipment, tools, materials, and any resources necessary to provide the following services. Semiannual Boiler Combustion and Tune, Semiannual instrument calibration to include all associated instruments, Semiannual motor vibration analysis, and Annual safety device testing. SPECIAL NOTES: Only one boiler is allowed to be offline for testing/tune purposes at a time! If a boiler plant emergency, site emergency, or national emergency develops, Contractor will cease testing at the request of site personnel. BOILER PERFORMANCE TESTING: P1 through P4 shall be completed in accordance with VHA Directive 1810 (Most Current Edition) and VHA Boiler and Associated Plant Safety Device Testing Manual (Most Current Edition) P-1 - Semiannual Boiler Combustion and Tune P-2 - Semiannual Instrumentation Calibration P-3 - Semiannual Motor Vibration Analysis P-4 - Annual Safety Device Testing Tests will follow VHA Boiler Plant Safety Device Testing Manual procedures verbatim. Technicians shall provide all tools, equipment, and labor necessary to perform inspection, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six or twelve months in accordance with a schedule provided by VAHCS. Instrumentation, monitoring, and data management systems as listed per Directive 1810 Appendix B Table 2 Number 10 shall be calibrated every six months. Provide at least two weeks notice to the Boiler Plant Supervisor prior to performing the work. Work must be conducted when the Boiler Plant Supervisor or his/her designate is available on site to monitor the work. During normal business hours unless approved by the Boiler Plant Supervisor. VAHCS will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable. Performance Testing of Boiler, Burner, Economizer (if provided), Combustion Control, Boiler Plant Instrumentation to be done in accordance with VA Master Construction Specifications, Office of Construction and Facilities Management TIL (Technical Information Library) Division 23. Perform overall visual inspection of systems. Observing any minor or major deficiencies before administering test procedures. Verify that systems comply with referenced code and VAHCS requirements. Perform tests on each boiler on all main burner fuels. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least twelve increments and record combustion performance, flue gas oxygen, carbon monoxide, NOx, fuel train pressures, atomizing train pressures, burner pressures, combustion air temperature, flue temperatures and boiler steam output. If required by local emissions authorities, provides services of testing firm to determine NOx and carbon monoxide. Test firm shall be acceptable to emissions authorities. NOTE: If NOx emissions limits are applicable, list the method of testing that is required by local authorities if it differs from the method listed. NOx emissions shall be tested with electronic analyzer reading in parts per million. Analyzer shall be calibrated with certified test gas within three months prior to use. Analyzer shall be accurate to plus or minus 5% of reading. Test No. P-1: Combustion and Tune Operate boiler on each fuel, with economizer (if provided) in service and record data for at least twelve evenly spaced steam loads from low fire start to 100% of full steam output, and in the same sequence back to low fire. Demonstrate performance and efficiency required by paragraphs under Articles, BOILER, BURNER AND FUEL TRAINS, and ECONOMIZER. Demonstrate proper operation of combustion controls, draft control (if provided), feed water level controls, and instrumentation systems (Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT). When flue gas oxygen trim is provided, conduct tests with trim control on manual at the zero trim (null) position (Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT). After completion of tests with trim control on manual control, repeat the tests on one fuel with the trim control on automatic control. Test No. P-2: Calibration Check current draw of forced draft fan motor at startup and at 100 percent of maximum boiler load. Current draw shall not exceed full load current stamped on motor nameplate. This test may be combined with Test No. P-1. List of instrumentation and controls to be inspected and calibrated: (Yokogawa, Rose Mount, Cleaver Brooks, McDaniel, Trerice, Setra, Ashcroft, Ari industries INC, Siemens.) Steam flow transmitters (all). Steam flow recorders/computer readout. Flue gas oxygen sampling, analyzing and recorder/computer readout. Boiler and economizer stack temperature transmitters and recorder/computer readout. Master steam pressure and combustion controllers. Boiler outlet draft controllers. Boiler water level controllers. Feedwater deaerator and condensate storage tank water level controllers including overflow. All pressure and temperature sensors, gauges, and transmitters. Test Methods: Utilize permanent instrumentation systems for data. All systems shall be operable and in calibration. Utilize portable thermocouple pyrometer furnished and retained by Contractor to measure stack temperature as a verification of permanent stack temperature recorder. Use portable electronic flue gas analyzer to determine constituents of flue gas. Analyzer shall be capable of measuring oxygen in percent with accuracy of plus or minus 0.5 percent oxygen and carbon monoxide in parts per million (ppm) with accuracy of plus or minus 5 percent of reading (Range 0-l000 ppm). Obtain oxygen and carbon monoxide readings at each test point. Calibrate instrument with certified test gases within three months prior to use and immediately after analyzer cell replacement. In Test No. P-1 retain boiler at each load point for a time period sufficient to permit stabilization of flue gas temperature and other parameters. Steam loads for tests may be furnished by the hospital systems, by operation of the steam silencer vent system, or by a combination of the above. Utilize dry bulb and wet bulb thermometers furnished and retained by Contractor for checking combustion air. Smoke testing shall be by visual observation. If smoke density monitor is not provided, utilize Bacharach Model 21-7006 Smoke Test Kit. If there is disagreement with the results of these tests, provide qualified observation person and tests in compliance with EPA Reference Method 9 (CFR 40, Part 60, Appendix A). An additional efficiency test will be required, conforming to ASME Performance Test Code PTC 4, if the boiler efficiency determined in the Test P-1 above, does not comply with requirements. Utilize ASME Test Forms PTC 4.1.a, 4.1.b, and the abbreviated input-output and heat balance methods. Compare the combustion performance data with VAHCS requirements and previous readings. (Flue gas oxygen, carbon monoxide and NOx). If necessary, make adjustments to the fuel, combustion air controllers, and FGR controller and damper to obtain the required performance. Record the new performance data. Flash S.D. card with new tune. P-3: Motor Vibration Analysis Check vibration of all electric motors in the boiler plant: burner fans, feed water motors, and condensate motors. Total of 9 motors. EQUIPMENT LIST: Description Type Make Model/Serial Number Year Boiler 1 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 2 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 3 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 4 Fire Tube Cleaver Brooks 200-400-200 2008 DA Tank Industrial Steam Stamp # 13194 2008 Surge Tank Industrial Steam Stamp # 13138 2008 VA TECHNICAL REPRESENTATIVES: Primary: Boiler Plant Supervisor, +1 (555) 000-0000 Ext. 6829 Alternate: Lead Plant Operator, +1 (555) 000-0000 Ext. 6347 11. SCHEDULE: Contractor shall perform on-site services during normal business hours, 8:00 am to 4:30 pm, Monday through Friday, excluding Federal Holidays, unless otherwise coordinated with the VATR. If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. If a holiday falls on Saturday, the preceding Friday is observed as a legal holiday. The eleven national holidays observed by the Federal Government are: New Years Day January 1 Martin Luther King Jr. Day Third Monday in January Presidents Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 Any additional Federal Holiday declared by the President of the United States The Contractor shall coordinate with the VATR for an agreed upon work schedule to determine when services can be performed. Work may be required to be performed outside of normal duty hours if mutually agreed upon by the VATR or designate and Contractor. Any work resulting in hours outside of 8:00 am to 4:30 pm CT because of operational impacts shall occur at no additional expense to the Government. The Contractor shall provide a minimum of 48-hour notice of any schedule changes. Schedule: Description Type Make Model Number Serial Number Year Type of Service Testing Month(s) Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks 200-600-200 200-400-200 2008 Instrument Calibration April - May October - November Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks Industrial Steam 200-600-200 200-400-200 2008 Safety Device Testing October November Boiler # 1-3 Boiler # 4 Fire Tube Cleaver Brooks 200-600-200 200-400-200 2008 Combustion Tuning April - May October - November Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks Industrial Steam 200-600-200 200-400-200 2008 Motor Vibration Analysis April - May October - November 12. REPORTING REQUIREMENTS: PERFORMANCE DATA REPORTS: The Contractor shall develop and submit to the Government for approval, a written report for instrumentation and calibration, and vibration analysis within ten (10) calendar days after contract award. The Contractor shall submit completed required reports on all services to the VATR within fifteen (15) business days from the completion of services. At a minimum, the report shall contain: Device description and/or model number Date(s) of services Method Equipment inspection checklist and comment section for identifying system defects Name and signature of service technician Defects/deficiencies (if applicable) Combustion Performance Data Sheet 13. SERVICE LABEL: After a calibration/testing/inspection/analyzed service has been accomplished for each device, a service label shall be placed conspicuously, readily accessible, visible, and legible, on the device in the immediate vicinity of the system tag or existing device label. The label shall be writeable and made of heat resistant, self-destructing material with self-sticking adhesive on the back. The label shall be pre-printed with the following information: Company name or identifier (logo) with the company s full address Technician name (Signature line) All information pertaining to complete date of service: year, month, day. This system has been: Inspected or Certified All information pertaining to next service due: days and years. This information shall be clearly and permanently affixed to the label capable of withstanding the elements. 14. SAFETY REQUIREMENTS: SAFETY REQUIREMENTS AND REPORTING: The Contractor is solely responsible for compliance with all federal, state, and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable and shall perform all work in a safe manner as required by these standards. The Contractor shall implement an Occupational Safety and Health Plan to ensure the safety of their personnel, as well as the protection of Government personnel and property. Additionally, the Contractor is responsible for the safety and health of all sub-Contractor employees. The Contractor shall provide a verbal report to the CO within 24 hours of an accident resulting in injury, death, occupational disease, or adverse environmental impact. The Contractor shall provide a completed copy of required accident investigation reports to the CO within five calendar days of each occurrence. SAFETY: The contractor shall have in place a documented and comprehensive Health and Safety program to ensure all shredding activities are provided in a safe and secure manor. 15. SECURITY REQUIREMENTS: BADGES: Contractor and/or all sub-contracted personal are required to always wear and have visible a Contractor Badge. Badges are issued by Facilities Management (FM), B-3, second floor. FM Office hours are Monday Friday, 8:00 am 4:30 pm. The Contractor shall be required to obtain and display identification badges for all employees requiring access to the St Cloud VA Facility. These badges will be Government furnished and issued to Contractor employees upon initial entry, under contract. Identification shall be always worn on the outer clothing between the neck and waist on the front of the body and visible with the Contractor s name plainly displayed. Loss of a contractor badge shall be reported to the VATR no later than the following workday. There is a $30.00 fee for a lost badge. All contract personal shall be checked in by Facilities Management (FM) located in building 3, second floor. Contractor personnel will be escorted by VA staff. 16. DAMAGE TO GOVERNMENT EQUIPMENT AND PROPERTY: The Contractor shall take all necessary precautions to prevent damage to Government equipment and property. The Contractor shall report damage of Government property or equipment to the Contracting Officer and/or VATR within 24 hours of the incident. 17. INVOICING: The contractor shall submit invoice(s) in arrears after the services have been completed. Invoice shall include, but not limited to: Contract Number Purchase Order (PO) Number (changes each option year) Date of Service Location Description Quantities 18. REFERENCES: REFERENCE UPON REQUEST 1 - Master Construction Specification, Division 23- Heating, Ventilating and Air Conditioning ATTACHMENTS: 1 - VHA Directive 1810, Boiler and Boiler Plant Operations 2 - VHA Boiler Plant Safety Device Testing Manual -Most Current Edition 3 - Combustion Performance Data Sheet 4 Safety Device Testing Data Sheet

More opportunities from Department Of Veterans Affairs → Network Contract Office 23 (36C263)

Same awarding agency

NAICS: 811310
New
Federal
J039--JLG Boom Lift Hydraulic Leak Repairs - STC (VA-27-00010304)
Solicitation # 36C26327Q0084
The Department of Veterans Affairs, Network Contracting Office 23, is issuing a sources sought notice for market research to identify qualified contractors for hydraulic repairs on a JLG Boom Lift, Model 600S, at the St. Cloud VA Health Care System in Minnesota. Under NAICS code 811310, the required services include replacing all hydraulic hoses through the cat track, replacing the hydraulic line from the pump to the block, replacing hydraulic oils, and updating the basket display decal and operator and ANSI manuals. The selected contractor must be located within a 100-mile radius and will be responsible for the pickup and delivery of the equipment to and from the St. Cloud VA campus. All repairs must be completed within three weeks of the contract award and must meet industry and manufacturer operational standards. This notice is not a formal solicitation and does not obligate the government to award a contract. Interested parties must submit their company information, including DUNS and SAM Unique Entity ID, a capability statement, and their socio-economic size classification to Contract Specialist Evan Beachy by 4:00 PM Central Time on November 04, 2026. Additionally, respondents should specify if the procurement can be handled through GSA, FSS, SEWP, or other existing contract vehicles. Responses are intended solely for planning purposes to help the government make informed acquisition decisions.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 811210
New
Federal
J065--Karl Storz Support Services IDIQ VISN
Solicitation # 36C26327Q0022
The Department of Veterans Affairs Network Contracting Office 23 is soliciting a brand-name only, five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for OEM-certified support and service of Karl Storz OR1 Video Integration Systems across the VISN 23 Healthcare System. This requirement, managed under simplified acquisition procedures, covers multiple locations including Minneapolis, St. Cloud, Fargo, Central Iowa, Iowa City, Black Hills, and Sioux Falls. The scope of work includes preventive and corrective maintenance, replacement parts, software and firmware updates, cybersecurity compliance, and technical training for clinical and biomedical staff. The contract has a guaranteed minimum value of 300,000 dollars and a maximum lifetime cost limitation of 5,600,000 dollars. Award will be based on a comparative evaluation of price and technical factors, including vendor qualifications, cybersecurity capabilities, and service level agreement response times. The contractor must adhere to strict OEM standards, NIST calibration requirements, and VA security policies, including the submission of cybersecurity artifacts and a signed Business Associate Agreement for HIPAA compliance. Performance will be monitored via a Quality Assurance Surveillance Plan targeting 98.9 percent operational uptime and 99 percent response time rates. Offers are due by November 11, 2026, and must include a signed SF 1449, completed pricing schedules, and proof of OEM certification for technicians.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 238330
New
Federal
Replace Operating Room 5 Flooring
Solicitation # 36C26327Q0019
Solicitation 36C26327Q0019 is a Service-Disabled Veteran-Owned Small Business set-aside for the Department of Veterans Affairs, Network Contracting Office 23. The project involves providing all labor, materials, tools, and supervision to remove and replace the flooring and subflooring in Operating Room 5 (Room 4211, Building 1W) at the Des Moines VA Medical Center in Iowa. The work must be completed within 120 calendar days following the Notice to Proceed. Award will be granted to the responsible, eligible quoter who submits the lowest-priced acceptable quotation that meets all solicitation requirements, provided the price is determined to be fair and reasonable. Key technical requirements include conducting asbestos survey testing, adhering to the Architectural Design Manual, and utilizing certified installers through INSTALL or a comparable four-year apprenticeship program. The contractor must provide a floor tile mockup of 100 square feet to establish quality standards and comply with strict packaging and marking regulations for asbestos waste and HEPA filters. Administrative requirements include the submission of an Accident Prevention Plan and Site-specific Safety Plan for COR approval, as well as the provision of payment bonds or irrevocable letters of credit for contracts exceeding 35,000 dollars. The contract is subject to the Davis-Bacon Act and Buy American requirements, with specific limitations on subcontracting to ensure a minimum of 15 percent of the work is performed by the prime SDVOSB contractor.
Flooring Contractors

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
Federal
J045--Glycol Loop Flushing - NWI
Solicitation # 36C26327Q0060
Solicitation 36C26327Q0060 is a firm fixed price request for quotation issued by the Department of Veterans Affairs Network Contracting Office 23 for the flushing, cleaning, and recharging of two closed-loop glycol heating systems, specifically the Surgery and Microbiology loops, at the Omaha VA Medical Center. The project requires the contractor to provide all labor, materials, equipment, and disposal handling to restore the systems to a stable operating condition using propylene glycol-based heat transfer fluid. The anticipated period of performance runs from November 1, 2026, to October 31, 2027, with the initial service required within 30 calendar days of award and a second identical service performed approximately 12 months later. Work must be conducted during normal business hours when temperatures exceed 40 degrees Fahrenheit and must comply with NFPA-99, ASHRAE 170, CMS, JCAHO, and VA HVAC Design Manual standards. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with strict limitations prohibiting the contractor from paying more than 50 percent of the government-paid amount to non-certified SDVOSB or VOSB firms. Award will be based on a comparative evaluation of price, technical quality, past performance, and veterans involvement. Key deliverables include pre-flush fluid sampling reports, system volume calculations, refractometer readings, and disposal manifests. Following Amendment 0001, the response deadline has been extended to November 10, 2026. Proposals must be submitted electronically to the contracting officer and include separate volumes for administrative documents, technical and past performance narratives, a subcontracting statement, and a labor standards statement confirming compliance with Service Contract Labor Standards.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS