Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hastings Resident Office Furniture

Awarded
W912ES25Q0054Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 337214
New
Federal
Cubicle Installation
Solicitation # FA301627Q0011
The Department of Defense, specifically the 502nd Contracting Squadron, is conducting market research through a Request for Information (RFI) to identify qualified small business offerors for the installation of cubicle furniture at JBSA Randolph Building 399. This sources-sought effort is designated as a Total Small Business Set Aside, utilizing NAICS code 337214 and PSC 7110. The scope of work requires the contractor to provide all materials, labor, management, and tools necessary for the installation, leveraging existing LAN infrastructure where possible. The project includes a performance extension of 52 days and requires adherence to strict technical standards, including UFC 3-580-01 for telecommunications and electrical installations, UFC 2-600-01 for fire protection, and MIL-HDBK-419 for grounding and shielding. Key deliverables include a comprehensive milestone installation schedule, which serves as a technical evaluation factor, weekly soft-copy progress reports, and as-built engineering drawings. The contractor must coordinate storage and staging with 502 CS/SCXP 30 days prior to installation and conduct a final walk-through 72 hours before close-out. Security requirements include potential DoD Secret Security Clearances for personnel handling network equipment and a formal site visit request process for base access. All on-site testing must follow Original Equipment Manufacturer manuals and vendor procedures, with a formal test plan due 10 days before installation begins. Interested small businesses must submit their company identification and socioeconomic status to Darreus Hiers and Joseph Gyakari by 10:00 A.M. Central Time on October 3, 2026.
FA3016 502 Cons Cl

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 337214
New
Federal
Office Furniture - Site Visit Required - 100% Small Business Set-Aside
Solicitation # N6600127Q6018
Solicitation N66001-27-Q-6018 is a 100% Small Business Set-Aside for the Naval Information Warfare Center (NIWC) Pacific to acquire design services and Furniture, Fixtures, and Equipment (FF&E) for multiple rooms across Buildings A33, A35, and A40 in San Diego, California. The project involves creating furniture plans and providing FF&E for eight specific rooms, with a required period of performance of 8 to 12 weeks following the award. This is a Firm-Fixed-Price contract under NAICS code 337214, with a small business size standard of 1,100 employees. Interested offerors must be an Authorized Source and maintain active registration in the System for Award Management (SAM). The government will award the contract to the responsive vendor whose quote is most advantageous, utilizing a trade-off analysis where non-cost factors—specifically design quality and FF&E quality—are significantly more important than price. Design evaluations will focus on space utilization, traffic flow, and aesthetic appeal. Site visits are scheduled for November 2nd and 3rd, 2026, and must be coordinated with James Blake by October 30th, 2026. All questions are due by November 16th, 2026, and the final RFQ closing date is November 27th, 2026. Submissions must include design layouts, AutoCAD drawings, a Bill of Materials, and an estimated project schedule in PDF or Excel format.
Niwc Pacific

POSTED

2 days ago

DEADLINE

in 29 days
NAICS: 337214
New
International
Department of Justice Canada - CAT 1,2,3,5,6 Office Furniture
Solicitation # 1000037089
The Department of Justice Canada is soliciting offers for the purchase, delivery, and installation of office furniture to be delivered to 284 Wellington Street in Ottawa, Ontario, by January 25, 2027. This requirement is restricted to holders of the Workspaces Supply Arrangement (SA) series E60PQ-140003/D and covers Product Categories 1, 2, 3, 5, and 6, including workstation systems, work surface products, filing and storage, ancillary products, and collaborative products. The procurement follows the PSIB stream, and the contract will be awarded to the compliant offer with the lowest evaluated price, with evaluations conducted on a per-category basis. Under Amendment 001, the solicitation end date was extended to November 5, 2026, and the scope was modified to remove the Category 6 Collaborative Table and its associated installation table while updating task light specifications. Technical requirements mandate that furniture meet ANSI/BIFMA X5.5 and UL 962 standards, utilize SCS Global GreenGuard Gold certified low-emitting adhesives, and incorporate FSC-certified wood cores. Additionally, the contractor must adhere to strict green procurement policies, ensuring packaging is reusable, returnable, or recyclable. Delivery is required under DDP Incoterms 2020, and there are no security requirements associated with this contract.
Department of Justice

POSTED

2 days ago

DEADLINE

in 7 days
NAICS: 337214
New
Federal
MCRC Branded Furniture FY27
Solicitation # M9549227BRANDFURN
The Marine Corps Recruiting Command is seeking a contractor to provide a nationwide turnkey solution for the project management, delivery, assembly, installation, and disposal of standardized, commercial-grade branded furniture. This requirement covers approximately 1,500 locations, including Recruiting Substations, Officer Selection Sites, Permanent Contact Stations, and Temporary Recruiting Facilities across the 1st, 4th, 6th, 8th, 9th, and 12th Marine Corps Districts. The anticipated contract structure is a Requirements Contract with a five-year ordering period, governed by FAR Parts 12 and 15. The scope includes a variety of items such as recruiter and visitor chairs, work desks, lounge furniture, and filing cabinets, all of which must adhere to the USMC Recruiting Facility Brand Guidelines of 2012 and meet BIFMA and ANSI quality and safety standards. Logistical capabilities are critical, as the contractor must perform inside-delivery and disposal at various sites throughout the continental United States. Compliance with the Buy American Act, the Nonmanufacturer Rule, and the Berry Amendment is mandatory for specific items. To ensure durability and aesthetic alignment, the government will require an in-person physical display evaluation during the source selection phase, involving both destructive and non-destructive testing. This current effort is a Sources Sought notice to conduct market research; interested vendors must submit a company profile, a completed capability and logistics questionnaire, and a non-binding Rough Order of Magnitude estimate for the base year and four option years by November 6, 2026.
Commanding General

POSTED

3 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract involves the design, furnishing, and installation of office systems furniture for the U.S. Army Corps of Engineers at the Hastings Resident Office, located near Lock & Dam 2 in Minnesota. The scope includes creating detailed floor plan drawings, verifying existing building conditions, electrical infrastructure, and coordinating finish selections with the government. The furniture must be fully functional, including power outlets, and adhere to all relevant codes and regulations, such as the ADA and federal standards. The standard workstations are approximately 64 square feet, with additional supervisor offices of around 96 square feet, and the design should incorporate these sizes along with other configurations as needed. The project timeline specifies that the design intent drawings are to be completed within 21 days of award, with government review, and the furniture installation is expected to occur around mid-July 2025, once the renovation is complete. The contractor is responsible for site verification, coordinating finish and electrical requirements, documenting existing conditions, and ensuring compliance with all applicable regulations. They must also provide detailed digital documentation of furniture specifications and finishes, including manufacturer details and care instructions. The contractor's responsibilities extend to logistical planning, damage documentation, safety reporting, and delivering a final furniture layout that reflects actual site conditions. Communication and coordination with the Contracting Officer’s Representative and the government are emphasized throughout the process to ensure smooth execution and adherence to project specifications.

General Info

Design, furnish, install office furniture with integrated power for US Army Corps, Minnesota, by July 2025.

NAICS

337214 - Office Furniture (except Wood) Manufacturing

Place of Performance

Hastin, MN, 55033, USA

Set-Aside

SBA

Documents

12

Amendment 0001 to Solicitation W912ES25Q0054

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912ES25Q0054

PDF, High priority: read this firstamendment
High

Hastings Furniture 2025 - Amendment 1 (Sheet A-100)

PDF, High priority: read this firstamendment
High

HRO Furniture Plan - Hastings Reeds Office Renovation

PDF, High priority: read this firstspecifications
High

Solicitation W912ES25Q0054

PDF, High priority: read this firstrfp
High

IMG_1156.jpg

JPG

IMG_1157.jpg

JPG

IMG_1159.jpg

JPG

IMG_1160.jpg

JPG

IMG_1161.jpg

JPG

IMG_3257.jpg

JPG

IMG_3258.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 4, 2025 to Jun 10, 2025. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts1 person available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
STATEMENT OF WORK U.S. Army Corps of Engineers - Hastings Resident Office (near Lock & Dam 2) Systems Furniture Design and Estimate 1 GENERAL 1.1 Purpose: This statement of work describes the requirements to design, furnish and install office systems furniture. A conceptual drawing has been provided to convey the intent of the new design. See section 2.6 of this document for specific requirements of the design. The Corps does have some office furniture available for possible re-use see the HRO furniture plan and attached pictures for more information. The contractor shall assess, refine, and estimate based on the premise that all systems furniture shall be fully functional including power to all outlets. The proposal shall include field verification of building conditions (including verification of electrical connections where hard-wired connections to furniture are required). Refer to Section 2, post-award verification and finish selection, for information on field verification requirements. The building is currently under renovation and the furnished floor plan represents the space post-construction. Furniture is to be supplied once the current renovation contract is complete. Period of Performance schedule is as follows: NLT 21 days after award Complete floor design intent drawings with electrical drop locations and material lists, submit draft for review. Allow 14 calendar days for government review and approval. NLT 60 days after notice Furnish and install approved furniture Notice will be provided after the design has been approved and all construction work at the Hastings office has been completed and the site is ready for furniture to be installed. Site is estimated to be ready for installation on or around 15 July 2025. 1.2 Project COR: The Contracting Officer's Representative (COR) for this project shall be provided after award. 1.3 Pre-Quote Site Visit: An informal site visit will be held at 1pm CDT on Monday June 2nd at the Hastings Resident Office. Points of Contact: Primary: Jesse Onkka, Contracting Officer +1 (555) 000-0000 2 POST-AWARD VERIFICATION AND FINISH SELECTION 2.1 Post-Award Kick-Off (Verification) Meeting: After contract award the Contractor shall schedule a site visit to field verify and document all existing building conditions. During this meeting the Contractor shall also coordinate all final finish, fabric, and color selections with the COR. This verification meeting shall be scheduled by the Contractor with the COR and shall occur soon after award. 2.2 Building Conditions: The Contractor shall verify and document all existing building conditions and all product changes required due to field conditions. The standard cubicle size will be 64 SF (basically 8'x8) with additional 96 SF offices for supervisors. The 64 SF is the standard but can be altered to meet the needs of the building office floor space. 2.3 Electrical Conditions: The Contractor shall verify and document all existing electrical conditions where powered furniture is required. Examples of electrical conditions to be verified include, but are not limited to, the following: type, location and quantity of wall or flush-floor outlets for plug-in electrical systems; location, quantity and suitability of wall, ceiling or floor junction boxes for hard-wired electrical systems; building electrical configuration (2+2, 3+1, etc.); requirement for sharing of neutrals. Contractor's design shall include any work necessary to run power in the furniture and provide power to the powered furniture to ensure systems furniture outlets are able to be utilized. 2.4 Finish Selections: Contractor shall provide all fabric, finish and color selections to COR and Contracting Officer for final selections. Actual material samples shall be provided; electronic samples or photographs of finish cards shall not be acceptable unless authorized by the Contracting Officer. 2.5 Finish Documentation: The Contractor shall provide a digital product file of cut sheets for all furniture items, with a sample of the actual fabrics/finishes selected for each item. Upholstery selections shall include manufacturer's specifications and care/cleaning instructions. Where one finish has been selected for multiple items, a single sample may be provided and annotated with the item number for each furniture item with this finish. This digital product file shall be delivered to the COR. 2.6 Design: 2.6.1 All products shall meet any and all Federal, state, local jurisdictions and governing authorities including but not limited to codes, laws, ordinances, and regulations applicable to this project including the Americans with Disabilities Act (ADA) and/or FED-STD 795. It will be the responsibility of the Contractor to ensure that applicable regulations and codes are followed. 2.6.2 The standard workstation cubical size will be approximately 64 SF (8'X8) and approximately 96 SF cube offices for supervisors. The 64 SF is the standard but can be altered to meet the needs of the building office floor space. Workstations are expected to have regular desks not sit/stand desks. Design intent drawings to be used for layout of systems furniture and design recommendations to be included for systems furniture function. Design to also include workstations utilizing systems furniture. Quantities for planned designed workstation are as follows: Minimum 8x8 workstations QTY-5 Minimum 96 SF workstations QTY-1 Minimum 6x6 workstations QTY- 4 3 OPERATION CONSTRAINTS 3.1 Responsibilities of the Selected Contractor: a. The Contractor is responsible for inspecting the loading and unloading areas, all spaces to be occupied and all other pertinent logistical conditions within all origin and destination locations. It is understood that the labor-hours included in pricing take into consideration building logistics. b. The Contractor shall acquaint itself with destination premises in relation to the use of trades, to ensure that there are no jurisdictional disputes or work stoppage. c. The Contractor shall determine and document any damage and communicate that information to the COR. d. The Contractor shall inform the COR and Contracting Officer of any injuries, illnesses, and property damage which took place on the jobsite within 4 hours of incident. e. The Contractor shall perform an inspection of the buildings and grounds with the COR prior to starting work and document accordingly. 3.2 The Contractor shall provide one copy of the final furniture layout by email in PDF format to the COR and Contracting Officer. This furniture layout will include the final building conditions that affect the furniture layout and all furniture awarded in the contract drawn to correct sizes and located per actual conditions. 4 INVOICES: Invoices shall be submitted to the COR for review and receipt. Attachments: 1. HRO Furniture Plan

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS