Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hyatt Lobby Renovation (V-1056 )

Closed
25-769-IFBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged areas, including residential rooms, bathrooms, common areas, and mechanical rooms, to return them to safe residential use. Key deliverables include the installation of drywall for approximately 300 square feet of floor area in mechanical rooms, the restoration of walls and ceilings, and the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. The contractor must provide a minimum one-year workmanship warranty and adhere to Center standards. This solicitation is a small business set-aside under NAICS 236220 and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100, Modification 1. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of the award. Proposals must include detailed relevant experience, a comprehensive description of the proposed work and phasing, and itemized pricing that remains firm for 60 days. The project timeline is scheduled for completion between February 1st and March 31st, 2024, with a response deadline for the solicitation set for November 20, 2026.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Hyatt Lobby Renovation project (V-1056) is an interior modernization of the Hyatt Regency Hotel located within Terminals A and B of the Orlando International Airport. Managed by the Greater Orlando Aviation Authority, the scope includes refinishing surfaces across the 1st and 3rd floor elevator lobbies and the 4th floor lobby, as well as renovating the bar, meeting rooms, concourse ballrooms, and restrooms. Key deliverables involve the installation of new wall coverings, flooring, ceilings, lighting, millwork, and decorative metal work, along with the construction of a new Market grab-and-go area. The project requires the delivery of a fully functional space, including all necessary electrical, mechanical, plumbing, and fire suppression systems, and the installation of owner-furnished furniture, fixtures, and equipment. The contract is an Invitation for Bids (IFB 25-769-IFB) with a total bid price of 8,360,294.00 dollars. Award is based on the lowest qualified responsible respondent. The performance period is 409 calendar days to achieve substantial completion from the issuance of the Notice to Proceed, with final completion due within 60 days thereafter. The work is structured into six phases and includes a 30-day initial submittal period. Contractors must hold a Florida General Contractor License and meet a 5 percent combined Local Developing Business and Veteran Business Enterprise participation goal. Special requirements include the posting of performance and payment bonds, adherence to strict airport security and CBP coordinator protocols, and compliance with ADA standards. Coordination for permits and inspections must be managed through the City of Orlando and various state departments.

General Info

Hyatt Regency Orlando Airport lobby renovation, $8.36M bid, 409-day performance period.

Documents

51

01 55 31 Requirements for Use of South Canal Road

PDF, High priority: read this first2 pages · sow
High

25-769-IFB Hyatt Lobby Renovation (V-1056)

PDF, High priority: read this first41 pages · ifb
High

25-769-IFB Hyatt Lobby Renovation (V-1056)

PDF, High priority: read this firstifb
High

25-769-IFB Hyatt Lobby Renovation (V-1056)

PDF, High priority: read this first41 pages · ifb
High

28 31 00 Addressable Fire Detection and Alarm - North Terminal

PDF, High priority: read this first31 pages · sow
High

A-2.02.02_REV_3 Floor Plan and Specifications

PDF, High priority: read this firstspecifications
High

A-2.02.03 Rev 2 Floor Plan Drawing

PDF, High priority: read this first1 page · specifications
High

A3.01.01 Rev 2 - General Note / RCP Elevator Lobby

PDF, High priority: read this first1 page · specifications
High

A-3.02.07_REV_3 - Hyatt Lobby Renovation RCP

PDF, High priority: read this firstspecifications
High

AD-2.01.01_REV_3 - Demolition Plan General Notes

PDF, High priority: read this firstspecifications
High

AD-2.02.02_REV_3 - General Notes - Demolition

PDF, High priority: read this firstspecifications
High

AD-3-02-01 Demolition RCP - Level 4 Arena

PDF, High priority: read this firstspecifications
High

Attachment C - Division Technical Specifications

DOCX, High priority: read this first1 page · specifications
High

Bidder's Qualifications Form for Airfield Pavement Construction

PDF, High priority: read this first2 pages · qualifications-form
High

Division 1 General Provisions Attachment

DOCX, High priority: read this first1 page · sow
High

E-0-02-02 Electrical General Notes

PDF, High priority: read this first1 page · sow
High

E-2-04-01 Power & Systems Plan - Level 4 - Area A

PDF, High priority: read this first1 page · specifications
High

E-3.02.01 Enlarged Plans - Electrical

PDF, High priority: read this firstspecifications
High

E-4.02.03 New Dimming Panel Schedules

PDF, High priority: read this first1 page · specifications
High

E-4-02-04 New Dimming Panel Schedules

PDF, High priority: read this first1 page · specifications
High

E-6.02.01-PANEL_SCHEDULES - Electrical Panel Schedules

PDF, High priority: read this firstspecifications
High

Hyatt Lobby Renovation - Table of Equipment / Walk-In Cooler Submittal

PDF, High priority: read this firstspecifications
High

Hyatt OIA Lighting Control System Electrical and Equipment Requirements

PDF, High priority: read this firstspecifications
High

New Dimming Panel Schedules

PDF, High priority: read this first1 page · specifications
High

Sample Contract Division 00 - General NonFederal FY25

PDF, High priority: read this first151 pages · contract-document
High

Section 01 21 00 - Allowances

PDF, High priority: read this first2 pages · specifications
High

Section 21 05 00 - Common Work Results for Fire Suppression Systems

PDF, High priority: read this first6 pages · specifications
High

Section 27 05 00 - Common Work Elements for Communications

PDF, High priority: read this firstspecifications
High

V-01056 Hyatt Lobby GC Specifications

PDF, High priority: read this first28 pages · specifications
High

V-01056 Hyatt Lobby Renovation FF&E Procurement Responsibility Matrix

PDF, High priority: read this first4 pages · sow
High

V-01056 Hyatt Lobby Renovation Phase 2 FF&E Specifications

PDF, High priority: read this first293 pages · specifications
High

V-01056 Hyatt Lobby Renovation-Phase II FF&E Procurement List

XLSX, High priority: read this first6 pages · ffe-procurement-list
High

V-01056 Hyatt Lobby Renovation Project Schedule

PDF, High priority: read this firstspecifications
High

V-01056 Hyatt Lobby Renovation - Section 27 05 00 Common Work Elements

PDF, High priority: read this first67 pages · specifications
High

V-01056 Hyatt Lobby Renovation - Section 28 31 00 Fire Alarm

PDF, High priority: read this first32 pages · sow
High

V-01056-MCO Hyatt Lobby Renovation Phase II Performance and Payment Bond

PDF, High priority: read this first131 pages · performance-and-payment-bond
High

V-1056 Hyatt Lobby Renovation Addendum 2 - Section 03 30 53 Concrete

PDF, High priority: read this first6 pages · sow
High

V-1056_HYATT LOBBY RENOVATION - Addendum 2 - Steel Decking

PDF, High priority: read this first4 pages · sow
High

V-1056 Hyatt Lobby Renovation Construction Drawings 2026-07-21

PDF, High priority: read this firstconstruction-drawings
High

V-1056 Hyatt Lobby Renovation Pricing Table 2026.07.28 Rev1

XLSX, High priority: read this first3 pages · pricing-table
High

V-1056 Hyatt Lobby Renovation Risk Assessment and Insurance Requirements

DOCX, High priority: read this first2 pages · risk-assessment
High

V-1056 Hyatt Lobby Renovation Specifications

PDF, High priority: read this first816 pages · specifications
High

AD3_01_01 Rev 2 - Demolition RCPs Level 1 & 3 Area B Elevator Lobby

PDF, Low priority1 page · specifications
Low

Bidder's Qualifications Form for Airfield Pavement Projects

DOCX, Low priority2 pages · qualifications-form
Low

DRAWINGS Provided by Engineer

DOCX, Low priority1 page · other
Low

E-0-02-04 Partial Power Riser Diagram

PDF, Low priority1 page · other
Low

E-1.04.08 Lighting Plan - Level 4 - Area H

PDF, Low priority1 page · specifications
Low

E-2-04-08 Power & Systems Plan - Level 4 - Area H

PDF, Low priority1 page · other
Low

Hyatt Regency Orlando Airport Visuals

PDF, Low priority10 pages · design-renderings
Low

Lighting Plan - Level 1 - Elevator Lobby

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 17, 2026 to Sep 18, 2026.

Deadline changed

Response deadline changed from Sep 18, 2026 to Sep 1, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Planning, Engineering and Construction
Contacts2 people available
OfficeOrlando, FL, 32827, USA
Office AddressOrlando, FL, 32827, USA
Contacts
Michael YebbaProject Manager
Kendrick DandridgeManager, Procurement (Capital Programs)

Interested Companies (145)

GD&S General ContractorsLake Mary, FL
N/aN/A, DC
Suffolk ConstructionBoston, MA

See All 145 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project involves the interior renovation of the iconic Hyatt Regency Hotel located at 9300 Jeff Fuqua Blvd Orlando Fl. 32827, within MCO's Terminals A&B. We will refinish nearly all surfaces on the 1st and 3rd Floor Elevator Lobbies, and the 4th Floor Lobby, including the Bar, Meeting Rooms, Concourse Ballrooms and Restrooms. Scope shall include new wall coverings, flooring, ceilings, lighting, millwork, decorative metal work, and paint. Additionally, a new Market grab-and-go will be constructed. This investment will modernize the hotel's amenities and redefine its guest experience for years to come.

More opportunities from Florida → Planning, Engineering and Construction

Same awarding agency

NAICS: 236220
New
SLED
Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)
Solicitation # 27-109-RFSQ
The Greater Orlando Aviation Authority is seeking a Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program (BP-00517) at Orlando International Airport. The project involves the construction of Airside 2 Wing 8, which includes adding up to nine Narrowbody Equivalent Gates, lounge facilities, vertical circulation, and operational maintenance spaces. The scope also encompasses airfield and apron improvements, as well as the integration of MEP, fire protection, and IT/low-voltage systems. To accelerate delivery and minimize operational impacts, the authority strongly prefers a CMAR with technical expertise in modular, prefabricated, and off-site construction strategies. The estimated program cost ranges from 279.9 million to 681 million dollars, with cumulative construction values potentially exceeding 300 million dollars. The selected CMAR will serve as the single point of responsibility for design collaboration, preconstruction, and construction services, with the ability to self-perform up to 20 percent of direct costs. The contract utilizes a Guaranteed Maximum Price (GMP) model and requires the CMAR team to be collocated with authority staff. Evaluation of respondents is based on a points-weighted system focusing on team staffing, program approach, and schedule innovation, with a shortlisting process and interviews for the top candidates. Key compliance requirements include adherence to the Federal Fair Labor Standards Act, Florida Statutes regarding scrutinized companies, and strict non-communication rules during the solicitation period. Performance is measured through a rigorous inspection process, including a preliminary substantial completion check and a joint warranty inspection nine months after substantial completion.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS