Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB #S26-33383 Office Moving Services (Central Coast District)

Closed
S26-33383State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 484210
New
Federal
Shipyard Infrastructure Optimization Program (SIOP) Industrial and Office Relocation Services Move 2 PSNS&IMF
Solicitation # N4523A26Q1333
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) is soliciting quotes for a Firm-Fixed-Price commercial services contract to provide industrial and office relocation services in support of the Shipyard Infrastructure Optimization Program (SIOP). This 100% Total Small Business Set-Aside, under NAICS 484210, requires the relocation of government-owned office furniture, warehouse materials, and specialized industrial equipment from the Controlled Industrial Area (CIA) in Bremerton, Washington, to designated facilities within a 40-mile roadway radius. The period of performance is scheduled from December 1, 2026, to November 30, 2027. The scope of work is divided into three primary components: the relocation of the Shop 26 Welders Workspace and equipment to Building 995, the relocation of Shop 26 warehouse materials to a facility in Poulsbo, and a consolidated capacity ceiling of up to forty 26-foot truckloads for ad-hoc and contingency moves. Contractors must provide all necessary personnel, equipment, and supervision, including lift gates and forklifts. Key operational constraints include a mandatory 100% U.S. citizenship requirement for all personnel, strict adherence to base security and traffic policies, and a prohibition on handling hazardous materials. Award will be made based on the Lowest Price Technically Acceptable (LPTA) criteria. Interested offerors must be active in the System for Award Management (SAM) and submit a complete proposal package, including pricing for all CLINs and equipment capabilities, by October 16, 2026. Invoicing and payments will be processed through the Wide Area Workflow (WAWF) system.
Puget Sound Naval Shipyard IMF

POSTED

about 22 hours ago

DEADLINE

in 16 days
NAICS: 484210
New
SLED
Citywide Office Moving & Relocation Services
Solicitation # IFB 5000 BRS1080
The City of Austin is seeking a qualified contractor under solicitation IFB 5000 BRS1080 to provide comprehensive commercial moving and relocation services. The contract covers all labor, materials, and equipment necessary for office moves and staff relocations, including the provision of secure, segregated interim off-site storage. To be eligible, contractors must possess at least five years of continuous commercial moving experience and maintain operational facilities within twenty miles of the State Capitol. The scope includes the provision of all packing materials, with a strong preference for reusable plastic crates over cardboard. While the contractor provides the materials, City personnel are responsible for packing and labeling items, including those marked as fragile. Award decisions are primarily based on price, with specific discounts applied for certified small businesses and local businesses within the Austin-Round Rock-San Marcos Metropolitan Statistical Area. The pricing structure is divided into hourly labor rates for movers, drivers, supervisors, and installers across both regular and non-regular business hours, as well as rentals for equipment such as crates, pallet jacks, and dollies. Required submittals include a detailed price sheet, a subcontracting plan, and certifications regarding the Living Wage Program and Wage Theft Prevention. The contract includes strict compliance requirements regarding OSHA safety standards, ADA accessibility, and the Lone Star Infrastructure Protection Act, with payment terms set at 30 calendar days following the receipt of proper invoices.
City of Austin

POSTED

2 days ago

DEADLINE

in 20 days
NAICS: 484210
New
Federal
V301--Moves Furniture Installation and Storage
Solicitation # 36C26127Q0039-Amended
The Department of Veterans Affairs, Network Contracting Office 21, is soliciting quotes for recurring commercial furniture management, installation, relocation, delivery, and storage services for the VA Sierra Nevada Health Care System in Reno, Nevada. The scope of work includes routine weekly moves, furniture reconfiguration, and the activation of new and renovated spaces, with a specific increase in activity expected for the VA North Campus during FY27. A critical requirement is the provision of 5,000 square feet of secure, restricted-access off-site storage located within 5 to 10 road miles of the facility. The contractor must provide all necessary vehicles, tools, and protective materials, and personnel must be experienced with commercial systems from manufacturers such as Steelcase, Herman Miller, and Haworth. This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offerors must be verified as an SDVOSB at the time of submission and maintain registration through final payment; failure to submit a completed VAAR Clause 852.219-75 will result in ineligibility for award. Quotes are due by October 6, 2026, at 11:00 am PST and must be submitted as a single PDF containing technical capability and past performance sections. Award will be based on a comparative evaluation of price and other factors, including vendor methodology and past performance. The period of performance is scheduled from November 1, 2029, to October 31, 2030, with invoicing submitted monthly in arrears supported by daily service tickets and inventory reports.
261-NETWORK Contract Office 21 (36C261)

POSTED

2 days ago

DEADLINE

in 6 days
NAICS: 484210
New
International
Warehousing services for office furniture and accessories as well as moving, installing and dismantling services in the National Capital Region (NCR)
Solicitation # 100031092
Employment and Social Development Canada (ESDC) is seeking a single vendor to provide moving, dismantling, installation, and warehousing services for office furniture and equipment within the National Capital Region. The scope of work is divided into two streams: Stream 1 covers the disassembly and installation of workstations, primarily Teknion and Haworth, and the relocation of office goods; Stream 2 requires the provision of secure, climate-controlled warehouse space of up to 100,000 cubic feet located within a 30 km radius of ESDC Headquarters in Gatineau, Quebec. The contract is for an initial term of one year, with an option to renew for up to two additional consecutive years. This procurement is conditionally set aside under the Procurement Strategy for Indigenous Business; if two or more Indigenous businesses submit bids, only those bidders will be evaluated. Award selection is based on a weighted ratio of 70 percent technical merit and 30 percent price. High security standards are mandatory, requiring the contractor to maintain a valid Designated Organization Screening and for all personnel to hold Reliability Status. The contractor must also demonstrate the capacity to execute two large projects simultaneously, utilizing at least 20 installers and 10 movers. Bids are due by October 15, 2026, and must be submitted electronically to the contracting authority.
Department of Employment and Social Development

POSTED

5 days ago

DEADLINE

in 15 days
NAICS: 484210
International
Provision of Commercial Removals and Associated Services
Solicitation # C417080
Kent Community Health NHS Foundation Trust, acting as the lead for Kent and Medway NHS and Social Care Partnership Trust, is seeking a single service provider for commercial removals and associated relocation services. The contract covers clinical and non-clinical wards and departments within live environments, including hospitals, health centres, community hubs, and general office buildings. The geographical area of performance spans Kent, Medway, East Sussex, and parts of Inner and Outer London. The estimated total contract value is 602,052 GBP excluding VAT, with an initial term of three years starting November 20, 2026, and options to extend for three additional 12-month periods, potentially reaching a total duration of six years. The award will be based on a weighted evaluation of Price (70%), Quality (20%), and Social Value and Sustainability (10%). Mandatory requirements for bidders include a satisfactory Dun and Bradstreet credit rating, a lack of insolvency proceedings, and specific certifications such as the British Association of Removers Commercial Moving Group membership, ISO 14001 accreditation, and a Healthcare Waste Carrier Licence. Providers must also demonstrate capabilities in storage, logistics, and vehicle maintenance. Payment terms are set at 30 days in arrears. The submission deadline for this opportunity is October 23, 2026, via the Atamis portal.
Kent Community Health Nhs Foundation Trust

POSTED

9 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The California Department of Rehabilitation is seeking a contractor to provide comprehensive office moving services across the Central Coast District under Solicitation S26-33383, with a bid deadline of July 23, 2026. The scope includes full-service relocation of free-standing office furniture and equipment, covering disassembly and reassembly of modular furniture, pad-wrapping of sensitive electronics, packing and unpacking, transportation, storage-in-transit, and site cleanup. All work must be performed in accordance with the DOR’s instructions, potentially outside normal business hours, including early mornings, evenings, and weekends. The contractor must supply appropriate vehicles, including specialized units like refrigerated vans or low-boys when required, and ensure all vehicles are in good working condition and equipped with clean protective gear. A dedicated move coordinator must be assigned to manage the workforce and maintain communication with the DOR throughout each move. The contractor is responsible for securing all property, arranging necessary permits and building access, and ensuring compliance with all federal, state, and local regulations, including prevailing wage standards established by the California Department of Industrial Relations for all workers on the project. The contract operates on a “not to exceed” pricing structure with defined hourly and mileage rates, where hourly rates encompass compensation, fuel, overhead, insurance, and materials, while mileage applies only to moves over 100 miles with prior DOR approval. Third-party expenses such as parking, tolls, bond fees, and equipment rentals are pass-through charges requiring documentation to qualify for reimbursement, though fuel surcharges are excluded. Storage is permitted in a 424-square-foot unit (53’x8’) for up to 90 days, after which a separate agreement is required, and the contractor must offer alternatives if the proposed facility imposes unreasonable restrictions. The contractor must provide full replacement value protection for state property in transit and bear liability for any damage caused by improper packing or handling, except when damage results from pre-existing conditions or improper packing by others. Claims for damaged or lost items must be filed by the DOR within nine months and acknowledged by the contractor within 30 days, with resolution required within 60 days. All bids must include completed certifications regarding workers’ compensation, ADA compliance, non-eligibility of aliens under federal law, and adherence to California civil rights statutes. Small business and Disabled Veteran Business Enterprise (DVBE) participation offers financial incentives of up to 5% on bid evaluation, with cumulative adjustments capped at $100,0

General Info

Contract for California DOR office moving services with strict pricing, compliance, labor, and liability rules, including packing, transport, storage, and overtime guidelines.

Documents

(6)

Addendum 1 to IFB S26-33383 Office Moving Services

PDF•amendment

Attachment 10 - DVBE Incentive Preferences

DOCX•special-notice

Attachment 9 - DGS Certified Small Business Participation Information

DOCX•supporting-document

IFB S26-33383 Office Moving Services Central Coast District

PDF•ifb

California STD 204 Payee Data Record

PDF•payee-data-record

Darfur Contracting Act Certification Form

PDF•certification-form

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 23, 2026 to Jul 16, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Rehabilitation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Contractor will provide office moving services, which shall include a full range of services: furniture installation, to remove the office furniture, equipment and related supplies from existing location, transport items to the new location and replace them according to the direction of the DOR Contract Manager on an as needed basis. Work may be conducted before 7:00 a.m., after 5:00 p.m., and/or on weekends, if needed. 1. SERVICES COVERED The contractor shall provide the following services under this agreement on an as-needed basis and subject to the dates of actual moving services provided by Contractor as follows: a. Labor, equipment, and materials to perform various office move related services including packing, moving, transportation/delivery, and unpacking and move management. b. Labor and equipment to perform various disassembly and reassembly of modular furniture including reconfiguration, moves, adds and changes. c. All sensitive equipment shall be pad-wrapped. This is to include electrical as well as computers, printers, etc. d. Storage of property in a secured location as required. e. Removal of surplus property to an appropriate location as needed. f. Removal of packing materials, rubbish, and debris from government premises as directed. g. Removal of transportation of hazardous materials is not included in this agreement. Removal of these substances is regulated under the Governors Office of Emergency Services and the California Environmental Protection Agency. 2. CONTRACTING FOR SERVICES a. Response to request for services may require Contractor to conduct a visual inspection of goods to be moved. Bids shall not be for more than the Contractors rates. b. The price on the bid will be the not to exceed price. All prices must reflect or be lower than the Contractors rates. c. All hourly and mileage rated costs indicated in this agreement shall not include third party or extra charges such as, parking fees, fuel surcharges, bond fees, rental equipment, and other moving related expenses the DOR may request. These costs, excluding fuel surcharges, bridge tolls, and parking fees, shall be on a pass-through basis only. Documentation must be submitted to support any of these charges to receive payment. d. Contractors shall itemize the above charges on the response to IFB for DOR approval prior to contract on-going contract request. Equipment rental (such as library and computer carts) is limited to specialized needs required by the DOR and must be agreed to prior to contract award by the DOR. e. Offers for move more than 100 miles (line haul) shall use the mileage rated and must have prior approval from DOR. All others shall use the hourly rates. 3. MODULAR FURNITURE (MOVING AND RECONFIGURING) This contract is for office moving services for free-standing office furniture. 4. MOVE COORDINATION AND PLANNING a. The Contractor shall provide a move coordinator to direct workers and to ensure that all necessary communication with the DOR is provided throughout the project. b. The DOR to provide Contractor with an inventory of items to be moved. c. Any items of value shall be listed separately by the DOR and the value noted ion the inventory list. d. Any items that require special handling shall be noted and the items tagged. 5. PACKING, PICKUP AND OTHER PREPARATIONS a. DOR shall notify the Contractor of any packing requirements and shall pay no more than the applicable contracted maximum hourly rates. b. Pickup shall be on the date mutually agreed upon. c. The Contractor shall provide the type of vehicle applicable to the items to be moved (e.g., refrigerated van, vehicle contractor, low-boy, etc.). Also, the Contractor shall not provide two smaller vehicles (and charge extra) when one larger vehicle would be more appropriate. d. For line haul moves, moving vans or contractor vehicles shall be weighted before and after loading by a certified weigh master on a certified scale and a copy of the report to be delivered or faxed to the DOR. There shall be no separate and extra charges allowed for moves which require weight tickets. 6. UNPACKING a. If unpacking is required, the Contractor shall unpack items with efficiency and care, and with consideration of all safety requirements. b. Upon delivery, all items on the inventory list shall be verified by the DOR as having been delivered prior to invoice payment. c. The Contractor shall be notified in writing of any missing or damaged articles in accordance with item 10, Filing a Claim. 7. LIMITS OF LIABILITY The Contractor shall be liable for loss or damage to property caused by its failure to properly pack and transport property; however, the Contractor shall not be held liable for loss or damage in the following situations: a. Damage or breakage to items packed improperly by other than the Contractors personnel. b. Damage caused by deterioration or inherent susceptibility of the article or by insects. 8. VALUATION OF ARTICLES The Contractors rates and/or insurance shall include full replacement value protection against possible loss or damage while property is under the protection of the Contractor. Contractor shall be responsible for the satisfactory repair, or replacement (at the States option) of any State property that is lost, damaged or stolen while in the Contractors custody and for the satisfactory repair of any damage to buildings or grounds. The DOR must declare any item of extraordinary value above $20,000. 9. FILING A CLAIM If DOR has determined that damage or loss to property has occurred, DOR shall note it on the Contractors shipping order or freight bill and file a formal claim by: a. Send a written notice to the Contractor describing the loss or damage. b. List each article damaged. c. List value of each item. d. Provide the Contractors order number, date of move, origin and destination. e. Store any damaged packing material or other evidence of damage. f. Retain copies of all receipts, correspondence, repair estimates, etc. Claims should be filed within nine (9) months after delivery or after loss has been reasonably established. Contractor shall acknowledge claim in writing within thirty (30) days and commit to action within sixty (60) days (i.e., pay, identify a compromise or decline to pay). Claims not settled within one year shall be reported to the Department of General services, Transportation Management Unit. 10. STORAGE If the new facility is not available at the time of the move and/or items must be stored, DOR may request storage-in-transit. Storage unit will be 53 by 8 or 424 square feet. When that occurs, the following steps shall be taken: a. The DOR must request storage-in-transit at least five (5) days prior to the move. b. Separate charges will accrue for transportation to storage, the storage period, and transportation from storage to the new facility. c. If storage is required for more than 90 days, a separate agreement will be necessary with the storage company itself with rates and terms that are not regulated by the Public Utilities Commission. d. Should the DOR expect to use long-term storage, the DOR will carefully review the rates and terms offered by the storage facility before the move. If the terms would place an undo burden on the State (such as limited access/removal, and unnecessary requirement for staff, etc.), the DOR may decline and the Contractor shall offer an acceptable alternate facility. Facilities offered by the Contractor must be applicable to the type of property requiring storage (i.e., refrigeration, low humidity, etc.). 11. CONTRACTOR RESPONSIBILITIES a. The Contractor shall not commence work until the Agreement has been approved and fully executed. b. For individual jobs estimated to exceed $5,000.00, the Contractor must be available to inspect the project prior to submitting an offer within two (2) working days or a mutually agreeable time from the date of notification by the DOR. c. The selected Contractor shall not commence work until the Individual Request for Moving Services Cost Estimate has been fully approved and authorization has been received from the authorized contact of the DOR. d. The Contractor must have personnel available to commence work on the project if given sufficient advance notice of ten (10) working days by the DOR or upon mutual agreement. e. All Contractor personnel shall be properly licensed, insured and experienced to perform their tasks. f. The Contractor shall make all arrangements with the building manager at the new site if necessary and shall obtain any necessary clearances or permits that may be required for parking and unloading. g. Contractor shall supply vehicles in good working condition and in compliance with all federal, state, and local laws and regulations for operation. All vehicles shall be sufficiently equipped with clean protective equipment to ensure safe transit and delivery of DOR property. h. Job hours shall begin when the Contractors personnel arrive at the DORs designated site and shall end when items are delivered and placed as specified at the new location. No additional drive time is allowed unless the Contractor is transporting State property to or from storage. i. Work shall be performed during normal workdays and hours unless a different schedule is specifically requested by the DOR. j. The Contractor is responsible to furnish sufficient personnel to accomplish the work in the time indicated on their estimate. If work is not completed within that period and requires overtime which was not specifically required by the DOR, the State shall not be liable for overtime charges. In addition, overtime shall not accrue due to the Contractors failure to provide personnel and equipment at the DORs designated place and time. State shall not pay overtime rates unless Contractors personnel have worked more than eight (8) hours on the State job for the day overtime is charged. k. If the Request for Service provided by the DOR is not clear, it is the Contractors responsibility to seek clarification. l. The Contractor shall not charge for any time lost in any way not required in the performance of the services requested (excluding required break periods). The Contractor may charge for time used in delivering equipment and materials, and in removing them at the conclusion of the move. This time should be included in the Contractors response to the Service Request. m. The Contractor shall attach documentation for all pass-through charges to the invoice. n. Failure to comply with any of the requirements may be grounds for contract termination. 12. DOR RESPONSIBLITIES a. DOR shall attempt to provide the Contractor with no less than ten (10) working days advance notice of a prospective move. b. DOR shall notify the Contractor of any additional security requirements, such as special clearance procedures or the need for the Contractors personnel to wear a uniform or identifying logo. c. DOR will provide the Contractor with a minimum of four (4) hours of work performed per request. 13. CANCELLATION NOTICE If service request is rescheduled or cancelled by DOR, the following shall apply: a. DOR notifies Contractor of reschedule more than 48 hours before the move, then no charge shall apply. b. DOR notifies Contractor of cancellation, more than 24 hours before the move, then no charge shall apply. c. DOR notifies Contractor of cancellation less than 24 hours before the move; charges may not be more than 10% plus cost of any materials provided and used by the DOR. 14. DISPOSAL/DUMP FEES The contractor must submit a receipt for reimbursement of disposal fees. 15. STATE GENERAL PREVAILING WAGE RATES State General Prevailing Wage Rates will apply for all counties where service is requested and continue for the duration of this Agreement. The predetermined general prevailing wage rates published by the Director of the Department of Industrial Relations may be obtained via the internet at www.dir.ca.gov. It is the Bidders responsibility to use the correct classification determination as published by the Department of Industrial Relations. Bidder must submit a certified copy of all payroll records for verification by the DOR Contract Administrator and/or designee with each invoice.

More opportunities from California Department of Rehabilitation

Same awarding agency

NAICS: 445132
New
SLED
03-0061 Tani Cantil-Sakauye Sacramento County Courthouse
Solicitation # 03-0061
The California Department of Rehabilitation has issued an informal competitive solicitation, number 03-0061, for the procurement and installation of one low temp combo vending machine at the Tani Cantil-Sakauye Sacramento County Courthouse. The award will be granted to the lowest responsive and responsible bidder who is either the manufacturer or a factory-authorized supplier. All equipment must be newly manufactured, as used or reconditioned goods are strictly prohibited. Bidders must submit their quotes by October 9, 2026, and include mandatory documentation such as the Bidder Declaration Form GSPD-05-105, post-consumer recycled content certification, and federal debarment status. The selected contractor must ensure the machine is delivered, installed, and fully operational within 35 calendar days after receipt of order. Installation requirements include the use of lift-gate trucks for delivery to the 17th floor, the removal and offsite disposal of all packaging, and the return of barcodes from any replaced equipment to the department. The machine must comply with ADA accessibility standards, Energy Star Version 3.0, and UL Standard 751, among other safety and electrical regulations. Additionally, the supplier is responsible for coordinating with the visually impaired operator regarding machine configuration and labeling, providing operational training, and offering a trade-in value or recycling plan for existing equipment.
Vending Machine Operators

POSTED

5 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS