Inside Plant (ISP) Fiber Optic Cable Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves engineering, furnishing, installing, and testing inside plant (ISP) fiber optic cable within flightline buildings. The scope includes cable pulling, termination, labeling, and slack management to ensure a fully operational fiber optic infrastructure. The work is to be performed in North Lakewood, with the Department of Defense through the FA4407 375th Contracting Logistics Group acting as the overseeing agency. This subcontract is categorized under NAICS code 238210, which pertains to electrical contractors and other wiring installation contractors. The solicitation was posted on June 11, 2026, with a response deadline set for June 22, 2026. While no specific set-aside type or organization type is indicated, the contract focuses on specialized fiber optics installation services within a critical operational environment, emphasizing reliability and precision in supporting defense infrastructure.
General Info
Agency
NAICS
Place of Performance
North Lakewood, WA, 98433, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
