Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

ISO 450001 Certification and Maintenance

Active
W519TC-26-SS-035449Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This Sources Sought notice seeks a qualified contractor to provide services for obtaining and maintaining ISO certifications for RIA-JMTC, specifically focusing on ISO 45001:2018 Occupational Health and Safety. The selected provider must be accredited to ISO 17021 and the ANAB, with a proven track record of completing at least two ISO audits for DoD facilities with over 1,000 personnel. The contract spans five years, consisting of one base year and three one-year option periods, and prohibits the subcontracting of the certification process to third parties. Key responsibilities include conducting pre-assessments, formal registration audits, and annual surveillance audits to ensure no lapse in certification. The contractor must provide detailed audit plans, electronic reports, and certification documents. Due to the nature of the work at Rock Island Arsenal, personnel must be U.S. citizens, undergo background checks, and complete specific security training, including AT Level I and iWATCH. Interested parties must submit their company name, Cage Code or EUI number, POC information, and a capability statement to the designated point of contact.

General Info

Five-year contract for ISO 45001 certification services for RIA-JMTC by accredited providers.

Agency

Department Of Defense → W6QK Acc-RiView Agency

NAICS

541990 - All Other Professional, Scientific, and Technical ServicesView NAICS

Place of Performance

Rock Island, IL, 61299, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts1 person available
OfficeROCK ISLAND, IL, 61299-0000, USA
Organization / Agency
Department Of Defense → W6QK Acc-Ri
View Agency Profile
Office AddressROCK ISLAND, IL, 61299-0000, USA
Contacts
Heather Petersen

Full Description

Show more

This is a Sources Sought only.



You MUST send an e-mail to the POC (heather.j.petersen.civ@army.mil) that includes the following:


1) Company Name


2) Cage Code or EUI number


3) Company POC, e-mail address, and phone number


4) Capability statement that outlines you have and can complete the work outlined below.


_______________


Scope of Work (SOW):


  1. Scope of Work

B.1 The contractor shall provide all necessary services and support to assist RIA-JMTC in certifying to, obtaining and maintaining the most current revision of each International Standard Organization (ISO) certification that RIA-JMTC deems necessary.


B.2 This performance work statement (PWS) describes the general requirements and deliverables required for this effort through the end of the contract. Each ISO certification required by RIA-JMTC will be included as an appendix to this PWS and will describe the specific requirements and deliverables for that ISO certification. Unless specifically stated, the general requirements and deliverables of this PWS will apply to each ISO certification. The Government will add a new appendix to this PWS for new RIA-JMTC ISO requirements. All revisions/changes to the PWS will be coordinated with the Contractor.


  1.  GENERAL REQUIREMENTS

C.1.1 The Offeror shall be accredited to ISO 17021 and the ANAB with a scope of accreditation that includes but is not limited to, ISO 45001:2018. The Offeror cannot have any previous suspensions or revocations of their accreditation.”  The contractor shall have objective evidence that they’ve performed successful completion of two ISO audits specific to RIA-JMTC’s requirements on DoD facilities of greater than 1000 personnel.    


C.1.2 RIA-JMTC shall be scheduled for audits to ensure no lapses of any certificates.  It is the intention of RIA-JMTC to schedule all audits in one calendar week each year.  Deviations from the intended scheduling may be necessary to achieve initial registration and may occur at the discretion of RIA-JMTC.  Section C1.2-ISO 17021 requires a surveillance audit once per calendar year. No lapse in certification will occur if audits are conducted once per calendar year. A recertification audit occurs 60 days prior to expiration of a certificate.


C.1.3 The contractor and/or sub-contractor shall abide by all applicable requirements of ISO for the duration of this contract.


C.1.4 The Certification Body shall conduct all pre-assessment and formal registration audits including review of documentation.  Reviewing RIA-JMTC’s documentation shall be performed at least two weeks in advance of any formal audit.


C.1.5 The Certification Body shall provide registration audits and/or Surveillance/Maintenance Audits to be conducted, to maintain the requested ISO certification through the end of the contract. 


C.1.6 The specific schedule for each of these audits shall be agreed upon between RIA-JMTC’s Management Representative and the Certification Body.  The audit duration is governed by IAF.  The Government may require additional audit days to allow for a more extensive audit than what the IAF recommends.


C.1.7 The scope of the certification is not segmented but rather is inclusive of the entire facility except for RIA-JMTC’s exclusions mentioned previously.  Therefore, audits shall be performed facility wide, simultaneously over one calendar week, or in the scheduled timeframe, to avoid unnecessary disruption of the organization.


C.1.8 Sub-contracting. Contractor shall not sub-contract the certification process to a third party.  Contractor must be able to perform all aspects of the certification process upon award of the contract.


C.2 DELIVERABLES.  The ultimate deliverable under this contract is formal ISO certification/maintenance during the period of the contract.  In addition, the Certification Body shall provide the following:


C.2.1 Information regarding the certification process, including processing complaints and appeals and any associated fees.  This should be provided prior to each audit.


C.2.2 The name of, and when requested, background information on each member of an audit team.  Such information should be provided sufficiently in advance of the audit to allow reconstitution of the audit team in the event RIA-JMTC objects to any audit team member.


C.2.3 Provide an audit plan, at least 30 days in advance of each audit to allow an agreement between RIA-JMTC and the Certification Body’s lead auditor on dates, times, and areas to be audited.  This notice shall include a single point of contact with which RIA-JMTC will communicate.


C.2.4 After any audit is complete, the Certification Body is required to provide an electronic audit report.


C.2.5 Upon an initial or re-registration audit, the Certification Body must notify RIA-JMTC of the decision to certify or not certify.  If the decision is to certify, the Certification Body is required to provide a certification document to RIA-JMTC.


C.2.6 The Certification Body is required to communicate audit results during and after an audit and to respond to RIA-JMTC’s response to any nonconformance.  The results of the Certification Body’s review of such response to nonconformities shall be reported to RIA-JMTC.  


C.2.7 Transfers of certificates for RIA-JMTC;


Note: Transfer of certificates means that RIA-JMTC maintains certification by an Accreditation Body which is a member of the IAF (International Accreditation Forum) and those responsibilities are being assumed by another Accreditation Body which is a member of the IAF (International Accreditation Forum).  New certificate reflects new Certification Body.


C.2.8 Audit support for the certification or maintenance of certifications of RIA-JMTC.  All information that could potentially affect certification to ISO shall be communicated to the RIA-JMTC representative immediately when found.


C.2.9 Any other deliverables required by the certification process in accordance with IAF and ANAB whether listed herein or not. 


C.3 PERIOD OF PERFORMANCE.  The period of performance for this contract is five years (one base year and three one-year option periods) from the date of award.  It is RIA-JMTC’s intent to maintain ISO registration/certification without a break in service.


C.4 SAFETY.  The contractor shall provide for the safety and protection of personnel employed in support of this contract.  The contractor shall comply with all RIA-JMTC Safety Regulations and all Standing Operating Procedures to include wearing appropriate eye and shoe safety equipment when required.  Procurement of safety glasses and shoes is the responsibility of the contractor.  The contractor /subcontractor shall comply with all Occupational Safety and Health Act (OSHA), as well as Federal, State, and local laws and regulations.


C.5 SECURITY


C.5.1 Site Security.  The contractor/subcontractor shall be responsible for the security of your own supplies, material, and equipment. The RIA is an Army installation subject to Department of Defense safe-guards, various precautions and plant protection measures.  At all times during execution of this PWS, the contractor will maintain adequate plant protection devices to minimize espionage, sabotage, and other malicious destruction and damage.  The contractor shall comply with all security requirements of the Rock Island Arsenal.


C.5.1.A Security Requirements.


            AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities,or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil.


            Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. The contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the change clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.


            For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center interstate identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.


            Contractor will acquire and need to return all issued U.S. Government Common Access Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause IF00015.


            IWATCH (See Something, Say Something) Training. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.


This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance, with the results reported to the COR no later than 60 calendar days after contract award.


            Impact on contractor performance during increased FPCON during periods of increased threat (contractor personnel working on an installation). During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.


            Random Antiterrorism Measures Program (RAMP) participation. Contractor personnel working on this installation are subject to participation in installation RAMP security program (e.g. vehicles searches, wearing ID badges, etc.).


C.5.2 Contractor Personnel.  Contractor personnel employed in support of this contract shall be native born or naturalized citizens of the United States and may require security clearances issued by the U.S. Government.  Foreign nationals shall not be used as auditors due to stringent security requirements.  The contractor shall be responsible for obtaining any security clearances that are required for contractor and sub-contractor personnel.


C.5.3 Visitor’s Requests.  Ten days prior to commencing work, contractor shall provide a completed visitor’s request form to the contracting officer representative (COR) for all personnel who will be working onsite or visiting during performance of the PWS. 


C.6 INSPECTION.  Contractor shall be subject to announced/unannounced security inspections conducted by physical security and other security offices while on Rock Island Arsenal.  Inspections can include vehicle searches and searches of personal and professional property within those vehicles and on the contractor’s person. 


C.7 HOURS OF OPERATION.  Normal hours of operation are 0600-1430, Monday through Friday, except for Federal holidays or as stated in the PWS.  The contractor /subcontractor shall comply with these hours of operation.  Requests to work outside these hours shall be made with the COR 24 hours in advance.


C.8 QUALITY ASSURANCE.  Inspection and acceptance of services will be performed by the COR, in accordance with the RIA-JMTC Quality Assurance Surveillance Plan (QASP).


C.9 PERSONNEL.  The contractor/subcontractor shall provide a work force possessing the skills, knowledge and training to satisfactorily perform the services required under this PWS.  This is a non-personal service contract; personnel performing work under this PWS remain your employees and are not employees of the Government.


C.10 SPECIFIC TASKS.  The PWS for new/additional ISO requirements will include a definitive statement of work, to include a delivery or performance schedule, a description of the requirement and any other special information.  Contractor response shall include a cost estimate, based on agreed and supplied cost schedules, and proposed performance schedule if you will not be able to meet the performance schedule.  The Government Contracting Officer will notify you if we take exception to anything in your proposal and if necessary, conduct negotiations.


C.11 PROGRAM MANAGEMENT


C.11.1 The contractor shall manage all technical performance issues, including logistics support, schedule, and data delivery requirements of the contract.  Contractor management responsibility shall include Program Planning and Control, Subcontractor Control and Data Management.


C.11.2 Management Control.  The contractor shall have management control, in sufficient detail, to identify contractor, subcontractor, or partner responsibilities.


C.11.3  Logs.  The contractor shall maintain daily work logs for work performed under the PWS and have them available for review.  As a minimum, the logs shall contain the work date, employee names, work location, and type of work performed.


C.11.4 Progress.  The contractor shall make progress on assigned tasks so as not to endanger timely performance.  Progress will be determined by adherence to schedule.  Adherence to schedule shall be monitored by the RIA-JMTC Performance Certifier in conjunction with the department/s requesting the audit service.  


  1.  GOVERNMENT FURNISHED EQUIPMENT and SERVICES

D.1 Government Furnished Equipment.  RIA-JMTC shall provide an office environment to include applicable space for the contractor to perform on-site auditing services.


D.2 Government Furnished Services.  RIA-JMTC will provide full-time escorts during all visits.


APPENDEX A


Performance Work Statement of ISO 45001


E.1 The contractor will provide accreditation, compliance audits, and certifications to International Standard ISO 45001, Occupational Health and Safety.  Certification must be accredited by the ANAB and transferable as ANAB. 


E.1.2 RIA-JMTC shall be scheduled for audits to ensure no lapse of any certificates.  It is the intention of RIA-JMTC to schedule all audits in one calendar week each year.  Deviations from the intended scheduling may be necessary to achieve initial registration and may occur at the discretion of RIA-JMTC.  To ensure no lapse of any certificates, the first audit must be completed by the second week of October annually.  Subsequent audits, if ordered, must be conducted in the option periods during that same time frame.


E.1.3 Upgrades or conversions to International Standard, ISO 45001, Occupational Health and Safety.


Note: Upgrade or conversion means an upgrade or conversion from International Standard, ISO 45001, Occupational Health and Safety if there is a new version released by ISO.


E.1.4 The contractor shall schedule an out-brief for the installation commander and plant management.


E.1.5 All other specific requirements refer to sections A through D.2.


E.1.6 Any other deliverables required by the registration process in accordance with IAF and the ANAB, whether listed herein or not.

Similar Contracts

Same NAICS industry code

NAICS: 541990
New
Federal
Account Management, Planning, and Maintenance for Online Crowd-Sourced Surveys and Cognitive Tasks for Individuals
Solicitation # 75N98026Q01128
Solicitation 75N98026Q01128 is a Sources Sought notice issued by the National Institute of Mental Health to identify qualified small business sources capable of providing account management and participant recruitment for online crowd-sourced research. The objective is to collect survey and cognitive task responses from at least 2,720 individuals across four specific categories: adults with anxiety only, adults with depression only, adults with both conditions, and a control group with neither. Additionally, the contractor must provide at least 1,500 high-quality English-speaking adult respondents for tasks lasting up to 75 minutes, with a set participant compensation of 20 dollars per completion. This notice is for market research purposes to determine the availability of capable small businesses and to inform the government's acquisition method and potential set-aside decisions. Interested parties must submit a capability statement by September 16, 2022, detailing their technical qualifications, business size, and NAICS code 541990 classification. The government maintains unlimited rights to all deliverables, and the selected contractor will be responsible for managing participant reimbursement and providing the collected data and demographic information to the National Institute of Mental Health.
National Institutes Of Health Nida

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541990
New
Federal
Post-Construction Environmental Compliance Monitoring Services for OR FLAP GRANT 24(2) Granite Hill Road Reconstruction Phase II
Solicitation # 69056726Q000034
Solicitation 69056726Q000034 is a request for quotation issued by the Department of Transportation, Western Federal Lands Division, for post-construction environmental compliance monitoring services supporting the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction Phase II project in Oregon. This acquisition is a total small business set-aside conducted under FAR 12.201-1 simplified procedures. The scope of work requires the contractor to ensure full compliance with the Oregon DEQ NPDES 1200-CA permit, which includes developing and maintaining an Erosion and Sediment Control Plan (ESCP) across four construction phases: demolition and land development, street and utilities, vertical construction, and final landscaping and site stabilization. The contract involves maintaining detailed inspection logs, performing visual monitoring, and providing a Hazardous Spill Plan. The period of performance extends from the date of award through September 30, 2027, with services delivered as firm-fixed price tasks. Technical requirements mandate that the ESCP and engineered facilities be stamped by qualified professionals, such as Oregon Registered Professional Engineers or Landscape Architects, depending on the acreage disturbed. Offerors must submit a price schedule and a past experience submission form, limited to five pages per relevant contract, to be evaluated against specific performance factors. The response deadline was extended via Amendment 0001 to September 10, 2026.
690567 Western Federal Lands Division

POSTED

2 days ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 325998
New
Federal
The Family of Hand Held Signals
Solicitation # W519TC-23-R-0080
The Army Contracting Command - Rock Island is soliciting proposals under W519TC-23-R-0080 for the production of a Family of Hand Held Signals, specifically including M125A1, M158, and M159 Star Clusters and M126A1, M127A1, and M195 Star Parachutes. This requirement is a 100% Total Women-Owned Small Business set-aside under NAICS code 325998. The resulting award will be a five-year Indefinite Delivery Indefinite Quantity contract utilizing a combination of Firm Fixed Price for First Article Tests and Fixed Price with Economic Price Adjustment for production. The contract includes a guaranteed minimum purchase of 1,500,000 dollars, with production capacities reaching up to 8,333 units per month for various signal configurations. The acquisition follows Best Value tradeoff procedures, where Technical Capability and Past Performance serve as pass/fail gates. Technical capability must be rated as Acceptable, and Past Performance must be rated at least as Satisfactory to be considered for award. Due to the nature of the materials, the contract is classified as Sensitive Ammunition/Explosives, requiring strict adherence to DoD physical security standards for contractor-owned, contractor-operated facilities and the implementation of an Operations Security plan. Additionally, the contractor must manage Government Furnished Material, specifically M548 Metal Ammo Cans, and comply with strict Technical Data Package distribution restrictions under the Arms Export Control Act. Deliveries are F.O.B. Origin to Rock Island, Illinois, with a requirement for First Article Testing for each of the six signal configurations. The contractor is required to use the Wide Area WorkFlow system for invoicing and must provide a Quality Program Plan and Critical Characteristics Control Plan within specified timeframes after award. Proposals must be submitted electronically, with a final response deadline of September 22, 2026.
All Other Miscellaneous Chemical Product and Preparation Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 325510
New
Federal
M48 Filter Coating and Painting
Solicitation # W519TC-26-Q-A086
The contract W519TC-26-Q-A086 for M48 Filter Coating and Painting is a firm-fixed price, indefinite-quantity contract issued by the Department of Defense through the Office of W6QK Acc-Ri in Rock Island, Illinois, with performance required at Pine Bluff Arsenal, Arkansas. The contract supports the cleaning, chromating, and painting of six specific military filter components, including cap inlets, filter bodies, and mesh assemblies, all to be treated in accordance with detailed drawings and the Performance Work Statement. Deliveries will occur as needed over the contract term, with line items covering both base and option periods spanning from June 2026 through May 2028. Pricing is structured on a tiered basis for two key items—CLIN 0001 and CLIN 0008—with volume-based rates tied to quantity ranges of 1–3,000 and 1–2,000 units respectively. All work must comply with MIL-STD-171F for marking and coating standards, and paint colors must adhere strictly to FED-STD-595 specifications for Green 383 CAMO or Tan 686A CAMO. The contract requires full compliance with government property management standards under FAR 52.245-1, including submission of a detailed Property Management Plan within 30 days of award that addresses net-centric electronic tracking systems and all required outcomes of the clause. Salt fog testing documentation meeting Method 509.5 of MIL-STD-810 must be submitted prior to processing the first shipment, and chemical and paint data must include manufacturer technical packages. Acceptance occurs at the destination—Pine Bluff Arsenal—with FOB destination terms, and all shipments must be trackable. Payment will be processed via DFAS using Wide Area Workflow (WAWF), requiring cost vouchers for labor-hour or time-and-materials line items and “Invoice 2in1” or separate invoice/receiving report combinations for fixed-price items, using specified DoDAACs for routing. Offerors must maintain current SAM registration, provide CAGE codes, confirm no exclusion status, declare compliance with prohibitions on inverted domestic corporations and interrogation of detainees, and submit proposals signed by corporate officers or authorized representatives by the deadline of August 6, 2026. All submitted materials must be hand-signed or time-stamped, with pricing inclusive of shipping, and amendments
Paint and Coating Manufacturing

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541512
New
Federal
Call for Solutions - Information and Communications Technology (ICT) Supply Chain Risk Management (SCRM) Monitoring Tool
Solicitation # W519TC-26-R-SCRM
The Army's Capability Program Executive Enterprise Software and Service Product Lead for Digital Market has issued a Call for Solutions (CFS) under solicitation W519TC-26-R-SCRM to identify a Commercial Off-the-Shelf (COTS) or Software as a Service (SaaS) monitoring tool for Information and Communications Technology Supply Chain Risk Management (ICT-SCRM). The objective is to implement a solution capable of continuous surveillance of corporate structures and high-volume vendor catalogs to vet for cybersecurity vulnerabilities, Foreign Ownership, Control, or Influence (FOCI), and other risks. Key technical requirements include robust RESTful API integration to feed real-time risk scores into the Digital Market IT e-Mart portal, support for Software Bill of Materials (SBOM) and Hardware Bill of Materials (HBOM) accuracy, and the ability to provide analytical visualization and hierarchical mapping of prime and sub-tier vendors. The procurement process is divided into two phases, beginning with a Phase 1 evaluation of a technical white paper and a recorded video demonstration. Submissions must pass five binary compliance gates to avoid immediate disqualification and are evaluated based on system architecture, continuous corporate monitoring, workflow management, and support services. The resulting contract will be subject to the Revolutionary FAR Overhaul Part 12 and DFARS Part 212, with strict adherence to NDAA FY19 Section 889 prohibitions and the exclusion of Kaspersky Labs products. Interested vendors must provide a Rough Order Magnitude (ROM) covering a twelve-month base period and four twelve-month options. Solution briefs are due by 1200 Eastern Standard Time on September 9, 2026.
Computer Systems Design Services

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 332993
New
Federal
120mm Tank Training Ammunition - FY27-FY32
Solicitation # W519TC-26-R-A061
The U.S. Government is issuing a draft Request for Proposal (RFP) W519TC-26-R-A061 for the acquisition of 120mm Tank Training Ammunition for Fiscal Years 2027-2032. This Firm-Fixed-Price contract involves the manufacture and delivery of M1002 and M865A1 cartridges, as well as the refurbishment of shipping and storage containers. The scope includes production planning, quality assurance, and support for Non-Recurring Engineering projects to improve cartridge safety and performance. The contract is structured with a base award and five option periods, with delivery and acceptance processed via Form DD 250. The procurement utilizes a sequential two-phase evaluation process. Phase I serves as a technical entry gate on a pass/fail basis, verifying ISO 9001:2015 certifications, explosive storage licenses, and DD Form 2345s. Offerors who pass Phase I proceed to Phase II, where a trade-off analysis is conducted based on technical approach, past performance, and price. Technical approach is the most critical factor, encompassing contract management, quality systems, and manufacturing capabilities. Potential offerors must register through the PIEE Solicitation Module and are invited to an Industry Day event on September 22 and 23, 2026, at Picatinny Arsenal, though participation is restricted to U.S. citizens.
Ammunition (except Small Arms) Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Federal
Install Utilities - RV Campground Site - Rock Island Arsenal (Amendment 0001)
Solicitation # W519TC-26-R-A072
The Army Contracting Command - Rock Island is soliciting proposals for a commercial, firm-fixed-price contract to install utilities for a new RV Campground Site at the Rock Island Arsenal in Rock Island, Illinois. This 100% small business set-aside project requires the installation of an 8-inch HDPE water main with a fire hydrant, a 1-inch gas main with a meter, and a 13.8 KV overhead electrical service connected to a 750 KVA transformer. The contractor is responsible for all labor, equipment, and materials, including excavation and surface restoration, adhering to the 2026 Iowa State Urban Design and Specifications Program (SUDAS) and USACE EM 385-1-1 (2024) safety standards. The project must be completed within 180 working days of the Notice to Proceed, with liquidated damages set at 1,000 dollars per calendar day of delay. Proposals are due by September 15, 2026, and will be evaluated based on best overall value, considering price, schedule, personnel experience, and past performance on similar utility projects. Required submission documents include a one-page high-level schedule, resumes for a Quality Control Manager and Site Safety and Health Officer, and a bid bond equal to 20 percent of the bid price or 3 million dollars, whichever is less. The pricing structure consists of a base bid for the general scope of work, with separate unit-priced line items for estimated rock excavation and granular stabilization. Award will be made to a responsible offeror who provides proof of appropriate licensing and maintains an active SAM.gov registration.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 13 days
View Details