Jeske Shoreline Revetment Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Jeske Shoreline Revetment Project aims to reconstruct and strengthen an existing shoreline structure along Lake Tahoe to combat erosion and protect the lake’s shoreline integrity. The work will involve reinstalling existing rock material alongside new imported boulders, filter fabric, gravel, and cobbles to reinforce the revetment. Beyond the shoreline, upland efforts will focus on stabilizing adjacent slopes, establishing native vegetation to prevent soil loss, and constructing a rock wall to safeguard the higher ground from accelerated erosion caused by water and weather. Additionally, a new stone step access path will be built to connect the upland area to an existing pier, improving safe and sustainable access while minimizing environmental impact. The project is managed by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, under the California state agency, with a planned execution date post November 21, 2025. The primary point of contact is Environmental Scientist Kathleen Bindl, who can be reached via phone or email for further inquiries. Work will occur in the 96145 zip code area near South Lake Tahoe, with no formal set aside or NAICS code specified. All activities are designed to comply with regional water quality standards and environmental protection goals, ensuring long-term ecological resilience of the Lake Tahoe shoreline and its immediate surroundings.
General Info
Agency
NAICS
Place of Performance
North Lake Boulevard, CA, 96145Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
