Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Jeske Shoreline Revetment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Jeske Shoreline Revetment Project aims to reconstruct and strengthen an existing shoreline structure along Lake Tahoe to combat erosion and protect the lake’s shoreline integrity. The work will involve reinstalling existing rock material alongside new imported boulders, filter fabric, gravel, and cobbles to reinforce the revetment. Beyond the shoreline, upland efforts will focus on stabilizing adjacent slopes, establishing native vegetation to prevent soil loss, and constructing a rock wall to safeguard the higher ground from accelerated erosion caused by water and weather. Additionally, a new stone step access path will be built to connect the upland area to an existing pier, improving safe and sustainable access while minimizing environmental impact. The project is managed by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, under the California state agency, with a planned execution date post November 21, 2025. The primary point of contact is Environmental Scientist Kathleen Bindl, who can be reached via phone or email for further inquiries. Work will occur in the 96145 zip code area near South Lake Tahoe, with no formal set aside or NAICS code specified. All activities are designed to comply with regional water quality standards and environmental protection goals, ensuring long-term ecological resilience of the Lake Tahoe shoreline and its immediate surroundings.

General Info

Reconstruct shoreline revetment with new rocks and vegetation, stabilize slopes, build stone access path, comply with water quality standards.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

North Lake Boulevard, CA, 96145

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A
Contacts
Kathleen BindlEnviornmental Scientist

Full Description

Show more
The purpose of this project is to reconstruct and enhance an existing shoreline revetment to prevent shoreline erosion into Lake Tahoe. Existing rock material as well as imported boulders, filter fabric and gravel and cobbles will be installed. Upland work includes slope stabilization, vegetation establishment and the creation of a rock wall to protect the slope above the revetment from accelerated erosion. A new access path consisting of stone steps will be created upland to provide access to an existing pier.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS