Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on January 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Khai Bui Use Permit for Restoration UP2602C

Awarded
UP2602CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 2 days
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 7 hours ago

DEADLINE

in 28 days
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 7 hours ago

DEADLINE

in 10 days
NAICS: 562910
New
SLED
Mold Remediation at the Town Hall
Solicitation # BD-24-1688-TOW94-TOW-135194
The Town of Wendell is seeking professional contracting services for mold remediation in the men's and women's bathrooms and the repair of water damage in the basement utility room at the Town Hall located at 6 Center St., Wendell, MA. The contractor is responsible for providing all necessary labor, equipment, and technical expertise, including the installation of temporary containment barriers in bathrooms and the use of fans, dehumidifiers, or ozone machines to dry the basement. To maintain operational continuity, the contractor must ensure that at least one bathroom remains available at all times. Specific technical requirements include the use of HEPA rated filters for vacuuming, the installation of 1/2 inch MR gypsum board with three coats of joint compound, and a painting process consisting of one coat of seal/prime and two coats of glossy paint. Additionally, the vinyl sheet product must be Tarkett Performa Stonework Dover 55031. This public works project is subject to prevailing wage rules, and a certificate of insurance is required upon bid acceptance. The scope of work specifically excludes duct cleaning and furnace servicing. Contractors must report any hidden issues discovered during subfloor and wall cavity inspections to the project manager, and the use of ozone machines must be supervised by the facilities engineer. The solicitation, numbered BD-24-1688-TOW94-TOW-135194, has a bid opening date of November 18, 2026, with a project walk-through scheduled for November 12, 2026. Electronic quotes are permitted through the procurement system.
Town of Wendell

POSTED

about 12 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Use Permit UP2602C, approved on December 3, 2025, by the Del Norte County Planning Commission, authorizes restoration work on a 0.81-acre parcel (APN 102-080-037) located at 161 Salmon Harbor Road in Smith River, California. The project was initiated by Frank Galea on behalf of property owner Khai Bui to remediate the unpermitted removal of five Sitka spruce trees. The subject property is situated within the Coastal Zone under the jurisdiction of the Coastal Commission and is zoned as General Resource Conservation Area District (RCA-1) and Rural Residential (RR-1). The scope of work requires the implementation of a mitigation and monitoring plan to restore the impacted environmentally sensitive habitat areas, which includes planting 20 Sitka spruce seedlings and 10 red alder. Key environmental protections include maintaining a 100-foot buffer from the Class II watercourse to protect wetlands and ensuring that restoration activities do not alter the watercourse or increase erosion. A qualified biologist or botanist must inspect the site at the end of each summer for five years to ensure planting success. Additionally, the project must adhere to strict archaeological protocols, requiring the immediate cessation of work if cultural resources or human remains are discovered, in compliance with California State Health and Safety and Public Resources Codes. The project was processed under the California Environmental Quality Act (CEQA) and concluded with a Notice of Determination filed on January 15, 2026.

General Info

Permit UP2602C authorizes habitat restoration and tree planting at 161 Salmon Harbor Road.

Place of Performance

Crescent City, CA, 95567

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Del Norte County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Del Norte County
Office AddressN/A
Contacts

Full Description

Show more
Frank Galea, representing property owner Khai Bui, has submitted a use permit application for proposed restoration work in an RCA-1 zone, following the unpermitted removal of five Sitka spruce trees within the RCA-1 section of the parcel. The subject parcel, identified as 102-080-037, is 0.81 acres in size and is located in the Coastal Zone and within the Coastal Commission’s appeal jurisdiction. The parcel is zoned General Resource Conservation Area District (RCA-1) and Rural Residential (RR-1) 1-acre minimum. The area's General Plan Land Use designation is Resource Conservation Area and Rural Residential - one dwelling unit per acre. The property is located off Salmon Harbor Road in Smith River, CA and is currently developed with a residence.

More opportunities from California → Del Norte County

Same awarding agency

NAICS: 237210
SLED
Wetherell Minor Subdivision of Agriculture Prime Land MS2601C
Solicitation # MS2601C
The Wetherell Minor Subdivision project, identified as MS2601C, involves the division of an approximately 184.1-acre parcel located at 8280 and 8300 Bailey Road in Crescent City, Del Norte County, California. The project aims to separate an existing farmhouse from a dairy barn to allow for the sale of one parcel while maintaining family ownership of the residence. The subdivision will create two parcels: Parcel 1, approximately 56.9 acres, containing the residential structures and detached garage, and Parcel 2, approximately 127.2 acres, containing the dairy barn and manure tank. Both parcels are designed to maintain long-term agricultural viability by ensuring each contains at least 40 acres of Agricultural Exclusive land, complying with local zoning ordinances for Agricultural Exclusive and Resource Conservation Area districts. To support the subdivision, a shared well agreement is proposed to provide water to Parcel 1, as all existing wells will remain on Parcel 2. The project utilizes existing onsite wastewater treatment systems that will remain on their respective parcels. Access to both properties is provided via Bailey Road, and the applicant has requested a modified road improvement standard for a 30-foot-wide right-of-way due to the infeasibility of the standard 50-foot requirement. The Del Norte County Planning Commission is the lead agency overseeing the project, which has undergone environmental review under the California Environmental Quality Act, resulting in a draft negative declaration indicating no significant environmental impacts. All existing land uses and agricultural operations will continue following the approval of the subdivision.
Land Subdivision

POSTED

2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS