Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Lake Forest Verizon Tower

Forecast
PL-25-60/UP 24-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lake Forest Verizon Tower project, under Major Use Permit PL-25-60/UP 24-03, authorizes the construction of a 150-foot lattice cell tower at 16200 E Hwy 20, Clearlake Oaks, California. The facility will feature nine panel antennas and nine remote radio units, with antennas positioned at a tip height of 124 feet. The project includes a 900-square-foot lease area enclosed by an eight-foot chain-link fence to screen equipment from public view. This new installation is designed to eliminate a cellular dead zone between Lake County and the I-5 corridor, as an existing tower on the parcel is unsuitable for co-location due to line-of-sight obstructions. Approved by the Lake County Planning Commission on November 17, 2025, the project is subject to a Mitigated Negative Declaration under the California Environmental Quality Act, indicating no significant environmental impacts provided specific mitigation measures are met. Key requirements include the use of darksky.org compliant downcast lighting, mandatory tribal cultural resource sensitivity training for all personnel, and the maintenance of a water tender truck on-site during ground disturbance to mitigate wildfire risks. Additionally, the applicant must improve the interior driveway to meet Public Resources Code standards for emergency vehicle access. The project is overseen by the Lake County Community Development Department in coordination with the FAA, FCC, and other state and federal agencies.

General Info

Verizon will build a 150-foot cell tower in Clearlake Oaks, California.

Place of Performance

Almond Lane, CA, 95423

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts1 person available
OfficeN/A

Full Description

Show more
Major Use Permit (PL-25-60/ UP 24-03) to construct a new 150’ tall lattice cell tower, including three (3) sectors of three (3) antennas each, totaling nine (9) panel antennas along with nine [9] remote radio units (RRU) mounted below/adjacent to the antennas. The proposed facility will be designed as a one hundred fifty-foot (150’) lattice tower with antennas at a tip height of one-hundred and twenty-four feet (124’). Associated equipment cabinets will be placed at the base of the tower within a new eight-foot chain-link fence enclosure occupying 900 square feet (referred to as the lease area). All equipment will be screened from public view. There is an existing, previously approved lattice cell tower, owned by a different provider, located on the same parcel. However, the existing tower is unsuitable for co-location as its position at a lower elevation on the hillside creates a line-of-sight obstruction. The purpose of the new tower is to bridge the gap in a “dead zone” from Lake County to Williams or the I-5 corridor. The parcel also contains a large lattice PG&E tower, to support high-voltage transmission lines.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and coordinating professional engineering and laboratory services for geotechnical design and roadway materials testing. The project includes rigorous material characterization tests such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Virginia Department of Energy

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Fiber to the Home Phase 2 - Rebid
Solicitation # 50010
The City of Hudson, Ohio, is soliciting bids for the Fiber to the Home Phase 2 Rebid, a capital improvement project focused on expanding fiber optic infrastructure. The scope of work includes the installation of approximately 49,000 lineal feet of 1.5-inch HDPE fiber conduit and 52,000 lineal feet of 2x1.5-inch HDPE fiber conduit using horizontal directional drilling. Additionally, the project requires the installation of 29,000 lineal feet of aerial fiber, 174,000 lineal feet of fiber optic cable of various strand counts, and the placement of underground fiber vaults and handholes. Bidders are required to provide pricing for labor only, and the work includes all necessary splicing, testing, clearing, grubbing, and site restoration to pre-construction conditions. The project is governed by the City of Hudson Engineering Standards and ODOT Construction and Material Specifications, with a substantial completion deadline of December 3, 2027, and final completion by December 17, 2027. Bidders must submit electronic proposals via Bid Express and provide a Statement of Bidder's Qualifications demonstrating at least three years of experience in similar projects. The contract mandates compliance with Ohio Revised Code Chapter 4115 regarding prevailing wage rates and requires the provision of bid, performance, and payment bonds, as well as a maintenance bond equal to 10 percent of the final contract price. Evaluation for award will be based on compliance with requirements, financial ability, and the responsibility and qualifications of the bidder.
City of Hudson

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
SLED
On-Call Utility Civil Construction Services
Solicitation # CS 11-26-04
Alameda Municipal Power (AMP) is seeking on-call civil construction services to support its electric distribution system in the City of Alameda, California. The scope of work covers a two-year term and includes the installation, repair, and replacement of underground electrical and fiber conduits, utility boxes, transformer pads, and foundations, as well as surface restoration, excavation, and trenching. The contract is structured as a master agreement with a maximum combined not-to-exceed value of $1,000,000 across up to two on-call contracts, with specific work assigned via individual task orders. Awards are based on the lowest responsible bidder, with task orders generally awarded by lowest price, though AMP may consider expertise, performance history, and continuity of work. Bidders must demonstrate sufficient capacity, experience, and a satisfactory performance record, with a preference given to local businesses when labor quality and price are equal. Required submissions include a non-collusion declaration, a subcontractor list, and proof of DIR registration. The successful bidder must provide a full-time qualified superintendent on-site and adhere to prevailing wage requirements and strict safety standards, including specific shoring and bracing plans for excavations five feet or deeper. Financial security is required via a bid security of 10% of the maximum bid amount, while the awarded contractor must provide performance and payment bonds for 100% of the contract price. Technical acceptance is based on rigorous inspection criteria for various construction elements, including conduit alignment, base preparation for vaults, and compaction testing. Bids must be submitted electronically through the Bid Portal by December 17, 2026.
Engineering and Operations

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)
Solicitation # 27-0075-RFQ-DB
Pinellas County is soliciting a design-build firm for the design and construction of a centralized microgrid and power distribution center at the County Solid Waste Disposal Complex in St. Petersburg, Florida. The project aims to consolidate and modernize electrical infrastructure by replacing multiple separate Duke Energy services with a unified system. Key components include the construction of a new switchgear building elevated above the 500-year floodplain, the installation of advanced overhead and underground distribution infrastructure, and the integration of Distributed Energy Resources, specifically a Waste-to-Energy facility and an estimated 5 MW floating photovoltaic array. All work must comply with the Florida Building Code, NEC, NESC, and IEEE 1547 cybersecurity requirements. The contract is structured in two phases: a design phase lasting between 274 and 365 days, followed by a construction phase lasting between 390 and 480 days. Award selection is based on a multi-phase evaluation of firm experience, past performance, and an oral presentation, with a total potential score of 200 points. The selected design-builder must provide a 5 percent bid bond for the Phase 2 base bid and 100 percent performance and payment bonds for the final lump sum price. Payments are made in arrears per the Local Government Prompt Payment Act with Net 45 terms. Final acceptance occurs after a project manager inspection and written certification that all work is defect-free and meets contract specifications.
SOLID WASTE

POSTED

4 days ago

DEADLINE

in 14 days
View Details

More opportunities from California → Lake County

Same awarding agency

NAICS: 238910
SLED
Seigler Springs North
Solicitation # PL-26-115
The Seigler Springs North project, identified by Major Use Permit PL-26-115/UP 21-17, is an approved cannabis cultivation operation located at 11615 and 11625 Seigler Springs North Road in Kelseyville, California. Approved by the Lake County Board of Supervisors on August 4, 2026, the project includes three A-Type 3 outdoor cultivation licenses with a total canopy of 130,680 square feet and a total cultivation area of 196,020 square feet. The site infrastructure consists of twenty-two 40 by 100 foot temporary light deprivation hoop-houses secured by a six-foot fence, two 8 by 40 foot shipping containers, a 40 by 20 foot compost area, and a 5,000-gallon fire suppression system. Additional facilities include one ADA-compliant portable restroom, a 15 by 15 foot trash enclosure, and five parking spaces, one of which is dedicated to ADA access. The project also includes a Type 13 Distributor Transport Only license for self-distribution and a Complex Grading Permit. Environmental compliance is managed under CEQA, with a Mitigated Negative Declaration confirming no significant environmental effects. Key requirements include the removal of approximately 128,000 square feet of vegetation, strictly limited to dead, dying, or diseased trees as identified by a certified forester or arborist. To mitigate habitat disturbance, the project establishes a 20-acre No Development Zone and requires the planting and protection of over 327 black oak saplings for seven years. The operation must adhere to California Public Resources Code sections 4290 and 4291 for defensible space, California Building Code Chapter 7A, and Lake County Air Quality Management District regulations. Operational mandates include maintaining Material Safety Data Sheets for all hazardous materials, storing pesticides in original labeled containers, and submitting a Site Management Plan under Order No. WQ 2019-001-DWQ for water quality compliance.
Site Preparation Contractors

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Guenoc Valley Mixed-Use Planned Development Project
Solicitation # DA24-01
The Guenoc Valley Mixed-Use Planned Development Project, identified by solicitation number DA24-01, is a phased development in Middletown, Lake County, California, led by applicant Lotusland Investment Holdings Inc. The project encompasses the construction of resort facilities, including residential units, boutique hotels, neighborhood-serving retail, restaurants, open space, and off-site workforce housing. A key component of the development is the Anasu Farms Tentative Subdivision Map, which involves eight phases and the creation of 34 new parcels, including 30 resort residential, one commercial, and three facilities parcels, along with six peripheral parcels and a community clubhouse. Infrastructure work is a critical part of the project, specifically the Guenoc Ranch Tier 2 and 3 Roads, which involves widening and realigning existing roadways to meet safety standards, constructing new crossings, and repairing or installing 11 culverts. This work is governed by Lake and Streambed Alteration Agreement EPIMS Notification Number LAK-15321-R2 from the California Department of Fish and Wildlife. The project has undergone comprehensive environmental review under CEQA, with a certified Environmental Impact Report and adopted mitigation measures. Administrative approvals include a Development Agreement approved by the Lake County Board of Supervisors on October 21, 2025, and a Water Supply Assessment.
Land Subdivision

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 111419
SLED
East Side Farms Expansion
Solicitation # PL-25-243
East Side Farms, Inc. has obtained discretionary approval from the County of Lake for Major Use Permit PL-25-243 to operate a commercial cannabis cultivation project in Middletown, California. The project is located across multiple parcels on Jerusalem Grade and features a maximum outdoor canopy of 50,560 square feet along with a Type 13 self-transport only distribution license. The site infrastructure includes two groundwater wells for irrigation, a 2,100 square foot greenhouse for immature plants, a 3,000 square foot processing building, and existing facilities for drying and harvest storage. The project was approved on July 9, 2026, following a Negative Declaration under the California Environmental Quality Act, indicating no significant environmental impacts. Operational compliance is governed by several comprehensive plans, including a Property Management Plan, a Biological Resources Assessment, and a Hydrogeologic Assessment confirming sustainable groundwater use. A specialized Drought Management Plan mandates water conservation measures and a minimum 10 percent reduction in canopy area and water use during declared emergencies. Strict environmental and safety protocols are required, including the use of bear-proof waste containers, secondary containment for petroleum products, and the maintenance of Material Safety Data Sheets for all hazardous materials. Additionally, the project must adhere to an Air Quality Management Plan with a specific Odor Response Program and ensure ADA compliance through the installation of permeable paver parking.
Other Food Crops Grown Under Cover

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
South Main Street and Soda Bay Road Widening and Bike Lanes ProjectThe South Main Street and Soda Bay Road Widening and Bike Lanes Project in Lake County, California, involves the rehabilitation and expansion of a roadway corridor located just south of Lakeport. The scope of work covers a 0.5-mile segment of South Main Street and approximately 0.8 miles of Soda Bay Road. Key infrastructure improvements include the construction of two 12-foot wide travel lanes, a continuous 12-foot wide center turning lane, and 8-foot wide paved shoulders designed as Class II bicycle facilities. Additional deliverables include the undergrounding of overhead utility lines, surface drainage improvements, and a safety correction to a horizontal curve on Soda Bay Road to increase its radius from 230 to 550 feet. The project is governed by CEQA and NEPA environmental standards, with recent addendums approved in November 2025 to allow for nighttime construction to maintain vehicle and business access. Environmental compliance includes a Streambed Alteration Agreement with the California Department of Fish and Wildlife and adherence to the Statewide NPDES General Construction Activity Permit. Construction is expected to span two seasons and may be implemented in two phases depending on funding. Critical scheduling constraints require that all in-channel and culvert work be performed during the dry season and outside the Clear Lake Hitch spawning season. The project is managed by Lake County, with oversight from the Lake County Department of Public Works and the Community Development Department.
Highway, Street, and Bridge Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS