This Solicitation opportunity from District of Columbia was posted on December 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the design and construction of the modernization of LaSalle-Backus Elementary School, a facility covering approximately 79,590 square feet. The awarded design-build contractor will be responsible for both renovating the existing structure and adding new construction to meet the school’s Educational Specifications as stipulated by the District of Columbia Public Schools. The project includes demolition of the existing gymnasium and the connecting one-story building, while maintaining the classroom bar. A key focus is on addressing the student population’s accessibility needs through the inclusion of two elevators. The site has notable topographical challenges, including a significant grade change from east to west along Madison Street NE, which must be considered by the project team to optimize outdoor programming space and building layout.
The solicitation, identified as DCAM-26-CS-RFP-0004, is managed by DC Public Schools and was posted at the end of 2025 with responses due by early February 2026. The design-builder must propose a design solution that maximizes site use and aligns with modern educational facility standards. The project reflects a combination of preserving key elements of the original 1957 structure while implementing new construction to support updated educational needs and accessibility. The District aims to select the most advantageous proposal based on specified evaluation criteria, with designated contract points of contact available for inquiries.
General Info
Design-build contract for LaSalle-Backus School modernization including renovation, new construction, and accessibility upgrades.
PDF, High priority: read this first7 pages · wage-determination
HighAI Summary for 29 CFR Part 5 - Labor Standards: An excerpt from Title 29 of the Code of Federal Regulations (CFR) detailing labor standards under the Davis-Bacon and Related Acts. It defines terms such as 'wages' and 'helper' and outlines the requirements for contracting officers to insert minimum wage and fringe benefit clauses into construction contracts exceeding $2,000.
PDF
PDF, High priority: read this first320 pages · sow
HighAI Summary for ADA Compliance QA-QC Manual v2 for DGS-DCPS Modernization Projects: This document is the ADA Compliance Quality Assurance-Quality Control (QA-QC) Manual version 2, prepared for the Department of General Services (DGS) for DC Public Schools (DCPS) Modernization & Stabilization Projects. It outlines the QA-QC program and procedures to ensure ADA code compliance during design and construction phases of school building projects. The manual covers primary focus areas including accessible entryways, interior furniture, elevators, bathrooms, exterior sidewalks, parking lots, and ADA code integration in design. It includes detailed chapters and appendices with scope specific checklists (SSC) for field execution and contractor quality control. The objective is to ensure high quality construction and compliance with ADA standards from project design through construction completion.
PDF
PDF, High priority: read this firstasbestos-management-plan
HighAI Summary for Asbestos Management Plan and Inspection Report for LaSalle Elementary School: This document is the Asbestos Management Plan (AMP) and Asbestos Inspection Report for LaSalle Elementary School, located at 501 Riggs Road, NE, Washington, DC. Prepared originally in August 2000 and updated in February 2017, it assists the District of Columbia Public Schools in managing asbestos-containing building materials (ACBM) in compliance with AHERA regulations. The report includes inspection results, hazard assessments, and response recommendations for identified asbestos materials. It details the scope of inspection, laboratory analysis methods, and provides a summary table of asbestos-containing materials found in the school building, including floor mastic, floor tiles, and fire doors, with their quantities and asbestos status.
PDF
PDF, High priority: read this first7 pages · sow
HighAI Summary for Attachment A1 - Concept, Schematic, and Design Development Milestone Requirements: This document outlines the milestone requirements for Concept Design, Schematic Design, and Design Development phases as referenced in Section 2 of the contract. It details deliverables for each phase including conceptual floor plans, education specifications updates, zoning analysis, cost estimates, value engineering, net zero energy reports, quality control plans, permitting and approvals process, and design narratives. The Schematic Design phase includes further plan development, presentation materials, agency meetings, community engagement, and detailed submittal requirements such as site and floor plans, building elevations, material selections, and preliminary LEED scorecards. The Design Development phase requires detailed plans, specifications, and code compliance analysis. The document serves as a comprehensive guide for the Design-Builder to meet project milestones and deliverables.
PDF
PDF, High priority: read this firstcondition-assessment-report
HighAI Summary for Attachment B4 - Roof Condition Assessment Report LaSalle-Backus Education Campus FY24: This Roof Condition Assessment Report was prepared for DGS - DCPEP for the LaSalle-Backus Education Campus located at 501 Riggs Rd NE, Washington, DC. The inspection was conducted on 03/01/2024 by Mantis Innovation Group, a technology-driven solutions firm specializing in facility performance and sustainability. The report covers detailed roof sections with material types, areas, condition scores, and recommended repairs including clogged drains, protective coating defects, open mortar joints, debris removal, mechanical defects, deteriorated sealants, maintenance items, and membrane aging. Estimated repair costs total $10,340. The report includes summaries and inventories for roof sections A and B, describing roofing materials, installation years, and condition scores, providing a comprehensive evaluation for maintenance and repair planning.
PDF
PDF, High priority: read this first29 pages · contract-document
HighAI Summary for Attachment H2 - Standard Contract Provisions A&E Services Contracts: This document outlines the standard contract provisions for Architecture and Engineering (A&E) services. It details the roles and responsibilities of the Contractor and the Government, including requirements for professional standards, performance of services, and the process for modifications. It specifically addresses the handling of deliverables, the role of the Contracting Officer, and the legal framework for claims and disputes.
PDF
PDF, High priority: read this first3 pages · wage-determination
HighAI Summary for Attachment K - Living Wage Act Fact Sheet: This document is a fact sheet regarding the Living Wage Act of 2006 for the District of Columbia. It specifies that recipients of contracts or government assistance of $100,000 or more must pay affiliated employees the current living wage. It outlines the wage rates for 2024 ($17.05 through June 30 and $17.50 starting July 1), defines 'affiliated employees', and lists specific exemptions and subcontractor thresholds.
PDF
PDF, High priority: read this first2 pages · past-performance
HighAI Summary for Attachment L - Past Performance Evaluation Form: Attachment L is a Past Performance Evaluation Form used to assess an offeror's performance on a project. The form includes rating elements such as Quality of Services/Work, Timeliness of Performance, Cost Control, Business Relations, and Customer Satisfaction, with rating options from Excellent to Unacceptable. It requires evaluator details including name, signature, organization, and contact information. The form also asks for contract specifics and remarks on excellent or unacceptable performance. The second page provides detailed rating guidelines to assist evaluators in assigning scores based on compliance, cost control, timeliness, and business relations. This document is essential for evaluating contractor past performance in federal procurements.
PDF
PDF, High priority: read this firsteeo-policy-statement
HighAI Summary for Attachment R - Equal Employment Opportunity (EEO) Policy Statement: This document is the Equal Employment Opportunity (EEO) Policy Statement required for compliance with Mayor's Order 85-85 and the D.C. Human Rights Act. It includes the contractor's written commitment to non-discrimination and affirmative action in employment practices, covering various protected categories. The policy mandates posting of EEO provisions, notification to labor unions, and compliance monitoring by the Office of Human Rights and Contracting Agency. It also requires inclusion of these provisions in subcontracts and outlines enforcement actions. The document includes signature blocks for authorized officials and an Employer Information Report form for submission to the Office of Contracting and Procurement. This policy statement is essential for contract award and continuation in the District of Columbia government contracts.
PDF
PDF, High priority: read this first3 pages · self-certification
HighAI Summary for Attachment Y - Campaign Finance Reform Self-Certification Form: This document is a Contractor Self-Certification form related to the D.C. Law 22-250, Campaign Finance Reform Amendment Act of 2018. It requires businesses to disclose political contributions made since November 9, 2022, to specified officials including the Mayor, Attorney General, and Councilmembers, and whether the business held any District contracts at those times. The form also asks about any violations of D.C. Official Code § 1-1163.34a and requires certification that the business is not and will not be in violation of the Act. It includes fields for business and principal information, and requires notarized signature to certify accuracy and compliance.
PDF
PDF, High priority: read this first6 pages · certification-form
HighAI Summary for Bidder/Offeror Certification Form for DGS Contracts: This document is the Bidder/Offeror Certification Form used for DGS contracts, revised in 2024. It contains five sections covering bidder responsibility, additional certifications, domestic preferences, Walsh-Healey Act compliance, and signature requirements. The form collects detailed information about the bidder's business entity, ownership, legal and financial status, licenses, and any past government contract issues such as suspensions, debarments, or terminations. It requires full disclosure of relevant legal and business conduct history to determine bidder responsibility and eligibility for contract award.
PDF
PDF, High priority: read this first126 pages · contract-document
HighAI Summary for DCAM-26-CS-RFP-0004 LaSalle-Backus Elementary School Design-Build Agreement: This document is the Design-Build Agreement for the LaSalle-Backus Elementary School Modernization project under contract number DCAM-26-CS-RFP-0004. It is an agreement between the District of Columbia Department of General Services and the selected Design-Builder. The agreement outlines the project scope, including design, preconstruction, construction, and construction administration services, with a guaranteed maximum price approach. Key details include the project budget of $79 million, important dates such as substantial completion by July 16, 2029, and final completion by January 17, 2030. The document also specifies liquidated damages, disincentive fees, and allowances for permits, public art, utilities, and investigations. The agreement incorporates terms and conditions, definitions, and references the original RFP and letter contract authorizing initial work.
PDF
PDF, High priority: read this first6 pages · contract-document
HighAI Summary for DCAM-26-CS-RFP-0004 Letter Contract for LaSalle-Backus ES Design-Build: This document is a Letter Contract issued under Request for Proposals No. DCAM-26-CS-RFP-0004 for Design-Build Services for the LaSalle-Backus Elementary School Modernization project. It serves as a notice to proceed and governs the relationship between the Contractor and the District of Columbia Government until a final contract is executed. The Letter Contract outlines the scope of work, deliverables, not-to-exceed amount, construction phase compensation, insurance requirements, contract duration, billing instructions, key personnel requirements, and use of the Department's project management software. It includes provisions for disincentive fees for late deliverables and replacement fees for key personnel changes. The document is critical for initiating and managing the project under the referenced RFP.
PDF
PDF, High priority: read this first24 pages · contract-document
HighAI Summary for DC DGS Standard Contract Provisions for Construction Contracts: This document outlines the Standard Contract Provisions for construction contracts issued by the District of Columbia Department of General Services (DGS). It defines key roles, establishes the order of precedence for contract documents, and details the procedures for designated and other change orders, including requirements for equitable adjustments and cost breakdowns for labor, bonds, and materials.
PDF
PDF, High priority: read this first344 pages · specifications
HighAI Summary for DCPS Educational Specifications Elementary School Prototype Program 2021: This document, titled 'Educational Specifications' for the District of Columbia Public Schools Elementary School Prototype Program, dated September 2021, provides detailed space programs, adjacency diagrams, and room specifications for various academic, administrative, health, dining, and building service areas. It includes comprehensive tables of contents listing specific rooms and spaces such as classrooms, libraries, art labs, gymnasiums, offices, and storage areas, along with their designated codes and page references. The document serves as a critical technical specification for school design and construction planning.
PDF
PDF, High priority: read this first27 pages · sow
HighAI Summary for DGS Project Turnover Protocol Manual 2024: This document is the Projects Turnover Protocol Manual prepared by the Capital Construction Division of the District of Columbia's Department of General Services (DGS) for 2024. It outlines the internal process for transferring construction projects from the Capital Construction Services Division to the Facilities & Maintenance Division. The manual includes step-by-step procedures covering design and construction phases, detailing roles, responsibilities, and required documentation for effective project turnover. Key contacts and communication protocols are provided to ensure smooth transition and maintenance readiness immediately upon project turnover.
PDF
PDF, High priority: read this first241 pages · specifications
HighAI Summary for DGS Standard Specifications & Owner’s Project Requirements: This document titled 'DGS Standard Specifications & Owner’s Project Requirements' serves as design guidelines supplementing technical specifications for projects managed by the Department of General Services (DGS). It outlines mandatory mechanical, security, door hardware, and electronic lockdown hardware standards, including prohibitions on VRF systems and wireless lockdown hardware. The document specifies requirements for school projects, such as wired lockdown systems, keying of doors, ADA push operators, and video door stations. It also covers interior plantings, projector installations, artificial turf fields, athletic equipment warranties, emergency evacuation maps, furniture and equipment restrictions, attic stock, fire alarm systems, phone lines, and standby generator capacity. The guidelines emphasize precedence over conflicting technical specifications and owner's project requirements, ensuring compliance with DGS standards.
PDF
PDF, High priority: read this first313 pages · facility-condition-assessment
HighAI Summary for Facility Condition Assessment Report - LaSalle-Backus Education Campus: This Facility Condition Assessment (FCA) report for LaSalle-Backus Education Campus, dated September 27, 2022, provides a comprehensive evaluation of the building's condition to support capital planning and asset management for the District of Columbia Department of General Services. The report includes an executive summary, building detail, requirement forecasts, and a 10-year expenditure forecast. It uses the Facility Condition Index (FCI) to benchmark asset condition, calculated as the ratio of deferred maintenance and capital renewal costs to the current replacement value. The assessment follows ASTM standard E2018-15 and includes visual inspections, documentation review, and interviews. Building systems assessed include core and shell, interiors, equipment, site improvements, and additional elements such as ADA accessibility and safety. The report aims to guide fiscally responsible capital asset management and maintenance planning.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for LaSalle Backus Elementary School Educational Specifications: This document provides detailed educational specifications for LaSalle Backus Elementary School. It includes comprehensive space descriptions, quantities, sizes, and total square footage for various functional areas such as playgrounds, administrative spaces, health services, student dining, and building services. The document outlines the building subtotal, gross-up, and total square footage, totaling 79,591 square feet. The specifications serve as a critical reference for planning and construction, ensuring all educational and operational space requirements are met.
PDF
PDF, High priority: read this first3 pages · rfp
HighAI Summary for RFP DCAM-26-CS-RFP-0004 Design-Build Services LaSalle-Backus ES: This document is a proposal submission in response to the District of Columbia Department of General Services Request for Proposal (RFP) DCAM-26-CS-RFP-0004 for Design-Build Services for the LaSalle-Backus Elementary School Modernization project. It includes the Offeror's proposed Design Fee, Design-Build Fee, and Lump Sum General Conditions Cost. The proposal confirms the Offeror's agreement to hold the proposal open for 120 days and to enter into a contract within 10 days of award notification. It also contains representations regarding authority, anti-collusion, and certification compliance with local business enterprise participation. The document is a formal offer to provide design-build services under the terms outlined in the RFP and associated contract documents.
PDF
PDF, High priority: read this first84 pages · rfp
HighAI Summary for RFP DCAM-26-CS-RFP-0004 LaSalle-Backus Elementary School Modernization: This Request for Proposals (RFP) DCAM-26-CS-RFP-0004, issued by the District of Columbia Department of General Services on December 31, 2025, solicits design-build services for the modernization of LaSalle-Backus Elementary School. The project involves full design and construction services including renovation and new construction to meet DC Public Schools Educational Specifications. Key elements include demolition of existing gymnasium, installation of two elevators, site slope considerations, and coordination with adjacent DPR facilities. The RFP outlines project requirements, evaluation criteria, economic inclusion, insurance, bonds, and miscellaneous provisions. The Design-Builder will collaborate with school leadership, DCPS, and the community, including a School Improvement Team, and manage a $500,000 Public Art Allowance under the DGS Percent for Art Program. Proposal due date is February 2, 2026.
PDF
PDF, High priority: read this first8 pages · supporting-documents
HighAI Summary for SBE Subcontracting Plan FAQs & Checklist: This document provides instructions, FAQs, and a checklist for completing the Small Business Enterprise (SBE) Subcontracting Plan. It outlines the requirement for contracts over $250,000 to subcontract at least 35% of the contract value to qualified SBEs, the process for requesting waivers through the Director of DSLBD, and submission guidelines for agency solicitations and public-private projects.
PDF
PDF, High priority: read this first10 pages · sow
HighAI Summary for Waste and Recycling Design Guidelines for DCPS Modernizations: This document provides detailed waste and recycling design guidelines specifically for DC Public Schools (DCPS) modernizations, issued by the D.C. Department of General Services, Sustainability + Energy Division. It includes recommendations for disposal container types and sizes based on student enrollment, design considerations for dumpster pads, driveways, and loading docks, and specifications for front-end load dumpsters and compactors. The guidelines address practical issues such as truck maneuverability, weight load capacity, overhead clearances, and prevention of illegal dumping and parking problems. It also covers dumpster enclosure design, compactor usage, and flow of waste materials through school buildings. The document aims to ensure efficient, safe, and sustainable waste management practices in DCPS facilities.
PDF
PDF, Low priority1 page · other
LowAI Summary for Attachment O - Bid Guarantee Certification: A certification form for offerors providing a cashier's check or irrevocable letter of credit as an alternate bid security. It requires notarization and stipulates that the offeror must post a payment and performance bond upon award or face liquidated damages and potential termination.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Attachment P - Conflict of Interest Disclosure Statement: A mandatory disclosure form requiring offerors to identify any organizational conflicts of interest in accordance with 27 DCMR §§ 4705 and 4707. It requires the disclosure of contractual relationships, employment ties, or financial interests that could influence the procurement process.
PDF
PDF, Low priority4 pages · other
LowAI Summary for DC Department of General Services - Release of Lien Forms: This document contains two standardized templates from the District of Columbia Department of General Services: a 'Release of Lien' for partial payments and a 'Final Release of Liens and Claims' for final disbursement. Both forms require notarization and serve to indemnify the District of Columbia and waive claims/liens upon payment for work performed.
PDF
PDF, Low priority19 pages · other
LowAI Summary for First Source Employment Agreement for Construction Projects: A District of Columbia Government agreement (Revised February 15, 2018) requiring employers receiving $300,000 or more in government assistance for construction projects to utilize the Department of Employment Services (DOES) as the first source for recruiting and hiring DC residents.
PDF
PDF, Low priority113 pages · report
LowAI Summary for Lead-Based Paint Periodic Surveillance Summary - LaSalle-Backus Elementary School: This document is a Lead-Based Paint Periodic Surveillance Summary conducted by Soil and Land Use Technology, Inc. for the District of Columbia Department of General Services at LaSalle-Backus Elementary School. The assessment was performed on March 11, 2019, by certified risk assessors. It includes a visual inspection of previously identified lead-based paint hazards and the status of response actions taken since a 2017 risk assessment. The report details the condition of various components, response actions completed, and confirms that all surfaces were intact with no further recommendations. Additionally, the document contains an appendix with a Lead Clearance Letter dated January 3, 2017, summarizing dust wipe final clearance sampling results, which met HUD and District of Columbia clearance standards.
PDF
PDF, Low priorityguide
LowAI Summary for National Building Information Modeling (BIM) Guide for Owners: This document is the National Building Information Modeling (BIM) Guide for Owners, published by the National Institute of Building Sciences in January 2017. It provides building owners with guidance on developing and implementing BIM requirements in contracts and internal policies to plan, design, construct, and operate buildings. The guide covers BIM uses, project delivery methods, intellectual property, team roles, BIM execution planning, standards, file structures, model requirements, and deliverables. It aims to help owners maximize building value throughout the lifecycle by facilitating better decision-making, project coordination, and asset management. The guide includes acknowledgements and contributions from various industry experts and organizations.
PDF
PDF, Low priority4 pages · other
LowAI Summary for Performance and Payment Bonds (Construction) - District of Columbia: Standardized forms (DC 26-40-7 and DC 26-40-8) for Performance and Payment Bonds used in construction contracts for the District of Columbia Government. The document provides the legal language for the bond obligations and detailed instructions for the Principal and Surety regarding execution, corporate seals, and Treasury Department approval.
PDF
PDF, Low priority1 page · other
LowAI Summary for Radon Test Result Report for LASALLE ES MAIN: This document is a radon test result report for LASALLE ES MAIN, detailing radon levels measured in various rooms and locations within the facility. The report includes kit numbers, room identifiers, test start and end dates, radon concentration levels in pCi/L, and analysis dates. The radon levels are mostly below 0.3 pCi/L, with one reading at 0.7 ± 0.3 pCi/L. The testing was conducted from December 5 to December 8, 2023, and analyzed on December 12, 2023. The report is provided by Air Chek, located in Mills River, NC.
The Department anticipates awarding a design-build contract (the "Agreement", "Contract" or "Design-Build Agreement" ) to the Offeror whose Proposal is most advantageous to the District pursuant to the evaluation and award criteria in Part 3 of this RFP. The Project includes full design and construction services for LaSalle-Backus ES, which will be approximately 79,590 square-feet school facility. The Design-Builder shall design and construct a combination of renovation of the existing and new construction to increase the existing footprint to accommodate the square footage required in the Educational Specifications ("Ed Specs(s)" or "Educational Specifications") to bring it in line with the District of Columbia Public Schools ("DCPS"). LaSalle-Backus ES was designed by Architect Rhees Burket and built in 1957. The original design drawings indicate a hexagonal shaped multipurpose room, however, this is not what was built. Instead, the south side of the site hosts a two-story rectangular gymnasium, set behind an angled entrance lobby. There is a one-story connector building with low ceilings connecting the entrance to a three-story classroom bar. The Department anticipates demolition of the existing gymnasium and connecting one-story structure and the maintenance of the classroom bar. The Design-Builder shall recommend a design that is most advantageous to the Project. The student population has a greater need for accessibility and therefore, two (2) elevators are required at this site. There is an extensive grade change from the east to the west of Riggs Road NE, along Madison Street NE. The project team should consider this site slope and stacking of the new construction to maximize site area for outdoor programming.
More opportunities from District of Columbia → DCPS (C&P)
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.