Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract solicitation, identified as 375108-CD, issued by Fermi Forward Discovery Group, LLC for Fermilab, pertains to the installation of a 15KV medium voltage electrical cable and associated communication cables between points P-F3 and P-F4 on the Main Ring, under the FESS Project 3-7-103B. The scope includes the installation of approximately 15,000 feet of 15KV power cables and 5,800 feet of communication cables within existing underground duct banks situated in DuPage and Kane Counties, Illinois. The subcontractor is responsible for providing all labor, materials, equipment, transportation, supervision, quality control, safety oversight, bonding, insurance, and any other resources necessary to complete the work in compliance with the contract documents. The work must fully adhere to detailed drawings, revised multiple times through issued amendments, and a comprehensive set of technical specifications covering general requirements, environment, safety and health (ES&H), submittals, quality, cable installation, grounding, testing, and inspection. The procurement is conducted as a Total Small Business Set-Aside under NAICS code 237130, with a firm fixed price contract anticipated. The solicitation underwent several amendments addressing proposal due date extensions (ultimately December 17, 2025), revisions to proposal forms, drawings, and responses to offeror questions that clarified installation responsibilities, equipment details, and documentation requirements. The subcontractor must strictly comply with applicable OSHA, ANSI, IEEE, NEMA, NFPA, and DOE regulations, including Davis-Bacon wage determinations for the affected Illinois counties. The contract incorporates rigorous ES&H mandates, requiring submission of a site-specific safety program, hazard analyses, and adherence to Fermilab-specific training and access controls, including restrictions on foreign national personnel. Quality assurance demands a Corporate Quality Assurance Plan and a Project Quality Control Plan before Notice to Proceed, with detailed testing and inspection procedures for electrical systems. Administrative and contractual clauses include requirements for payment and performance bonds, bid guarantees, insurance per Exhibit H, and the ability to stop work when safety is compromised. The subcontractor must deliver monthly progress reports and manage the administrative closeout with documentation such as as-built drawings, warranties, and test certifications. Inspections and final acceptance occur at the project site with coordination by FFDG representatives, ensuring that all work meets contract specifications and quality standards before payment releases. Proposal submissions require comprehensive technical and business proposals, including certifications for safety and affirmative action compliance, bid bonds, and subcontractor representations and certifications. Proposals must be emailed to the
General Info
Place of Performance
IL, 60510, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
On 12/11/2025, Amendment 03 was issued to extend the proposal due date to 4pm CT on December 17, 2025. See atatched file for more information.
On 12/4/2025, Amendment 02 was issued to provide REVISED responses to some questions issued in Amendment 01, replaced the Revised Exhibit R- Proposal Form issued with Amenment 01, and Replaced Revised Drawing No.'s 3-7-103-B_E-5 and 3-7-103-B_E-10 issued in Amenment 01 with new revised drawings. See attached files for more information.
On 12/4/2025, Amendment 01 was issued to Replace Exhibit R- Proposal form, Replace Drawing No.'s 3-7-103-B_E-1A, 3-7-103-B_E-5, and 3-7-103-B_E-10 with Revised drawings, and to provide responses to questions from prospective offerors. See atatched files for more information.
The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, “P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B” dated November 3, 2025 and Drawing Set entitled “P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7-103B, dated October 2025, Specification Sections 010010 – General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 – Submittals (January 2025), Section 014100 – Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.
More opportunities from Department Of Energy → Fermilab - DOE Contractor
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS