Mariposa Creek Parkway Phase III Hillside Trails Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hillside Trails Project is a recreational trail development initiative by Mariposa County in California, designed to expand access to natural areas by constructing approximately 12.3 miles of multi-use trails within a 235-acre area adjacent to the Phase III section of the Mariposa Creek Parkway Trail. The trails are organized into four distinct segments—Front-Country, Destination, Oak Woodland, and Park Trails—each tailored to specific user experiences ranging from accessible, low-gradient paths to more technically challenging routes with grades up to 8%. Trail widths vary between two and eight feet to accommodate diverse activities such as hiking, mountain biking, trail running, horseback riding, bird watching, and meditation. The project includes a comprehensive set of amenities to enhance user experience, such as shaded benches, scenic overlooks, pet waste stations, ADA-compliant routes, bike racks and wash stations, outdoor classrooms, exercise stations, bird blinds, hitching posts, picnic areas with table seating, and conservation zones. Restroom facilities will be limited to a vault toilet at Upper Martin Road without running water, while drinking fountains will be located only at the Mariposa County Park, serviced by the Mariposa Public Utility District. No new public water system will be created, and water services will be omitted at upper trailheads. Environmental compliance and stewardship are central to the project’s design and execution, with all work guided by CEQA, Cal/OSHA, and local ordinances. Mitigation measures include erosion and sediment control, stormwater management under Order 2009-0009-DWQ, adherence to air quality standards from CARB and MCAPCD, and protection of paleontological resources under California Public Resources Code Section 5097.5. Vegetation management will involve prescribed burning, herbicide application, and grazing to control invasive species, alongside irrigation for native plantings. Biological and cultural resource assessments are required, supported by attachments including a Biological Resources Evaluation and a Class III Inventory/Phase I Survey Report. Inspection and acceptance will occur on-site in Mariposa County, with oversight vested in the Mariposa County Planning Department to ensure adherence to environmental benchmarks and best management practices. Although no formal contract value, funding source, or procurement classification is identified in available documentation, the project is anticipated to begin construction on May 4, 2026, with leadership contact through Ben Goger, Senior Community Design and Development Planner. The project is structured as a locally administered initiative without federal contractual clauses

General Info

Mariposa County to build 12.3 miles of multi-use trails with amenities, comply with environmental laws, no new water system.

Agency

California → Mariposa County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Southwest of SR 140 and southeast of SR 140, CA, 95338

Set-Aside

NONE

Documents

(8)

Mariposa Creek Parkway Phase III Hillside Trails Initial Study/Mitigated Negative Declaration August 2025

PDFenvironmental-assessment

Mariposa Creek Parkway Phase III Hillside Trails Project Notice of Determination

PDFnotice-of-determination

CDFW Comment on Mariposa Creek Parkway Phase III MND

PDFcomment

Mariposa Creek Parkway Phase III Hillside Trails Project Notice of Completion

PDFnotice-of-completion

Caltrans Comments on Mariposa Creek Parkway Phase III ISMND

PDFcomment

Mariposa Creek Parkway Phase III Hillside Trails Project SCH Summary

PDFenvironmental-summary

Mariposa Creek Parkway Phase III Hillside Trails Final ISMND Nov 2025

PDFenvironmental-assessment

Mariposa Hillside Trails Project Notice of Intent

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
Contacts
Ben GogerSenior Community Design and Development Planner

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Clovis, CA

Full Description

Show more
The Hillside Trails Project proposes to construct approximately 12.3 miles of nature trails branching off the planned Phase III section of the Mariposa Creek Parkway Trail. The total Project area consists of approximately 235 acres. Trail widths would vary from two to eight feet. The intent of the proposed project is to bring a balance of recreation, adventure and tranquility to the area. The new trails would be divided into four different segments based on their location and intended purpose. These lengths are an estimate and include the following: Front-Country Trails • 0.8- and 1.6-mile stacked loops from the Mariposa Creek Parkway • Trail running grades 5-7% Destination Trails • 1.6-mile trail from Mariposa Creek Parkway up to overlook • 2.8-mile trail from Mariposa Creek Parkway up to highpoint of the site • Trail running grade 5-8% • Opportunity for more technically challenging trails Oak Woodland Trails • 1.6-mile woodland loop from proposed trailhead • 0.7-mile trail from proposed trailhead up to high point of the site • Trail running grades <5% • Opportunity for more accessible trails Park Trails • 2.5-mile loop option from the County Park • 1.9-mile trail from County Park to overlook • Trail running grade 4-8% Trail Amenities and Features The proposed Project would include various amenities and features within the trail system. They are anticipated to include the following if possible: • Shaded benches • Scenic viewpoints • Restrooms with drinking fountains. The restroom at Upper Martin Road will be a vault-style toilet which does not require running water. The drinking fountain will be eliminated • Ecological restoration areas • Educational signage • Pet facilities (i.e., waste bags and waterspouts) • Americans with Disabilities Act (ADA) accessible routes • Bike racks, repair, and wash station • Isolated meditation areas • Swing benches • Large gathering spaces with table seating • Exercise stations • Outdoor classroom • Bike jumps • Bird blinds • Hitching post • Parking • Conservation zones The proposed trail Project also includes management and maintenance strategies that are proposed in the Mariposa Forest Management Plan, including the use of herbicide, cultural and prescribed burning, and prescribed grazing to control invasive vegetation as well as irrigation to support any plantings of native vegetation. The Project will not be creating a new public water system. The drinking fountain/water bottle filling station will be located between the tennis courts at the Mariposa County Park. The Mariposa County Park is serviced by the Mariposa Public Utility District (MPUD). There will be no water services at the upper trailhead off of Martin Road. Trail Uses The Project is expected to encourage the following uses: • Hiking • Scenic viewing • Mountain biking • Picnicking • Dog walking • Learning • Bird watching • Group gatherings • Trail running • Meditating or Meditation • Horseback riding

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Utah

POSTED

about 18 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 20 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation # Skytop Lodge, Inc., Monroe County
Skytop Lodge, Inc. is seeking bids for the Skytop Lodge Sewage Treatment Plant Improvements Project under Contract 2026-01, with a scheduled bid opening on Friday, September 18, 2026, at 10:00 AM local time via PennBid. The project involves significant upgrades to the existing sewage treatment facility, including the installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, and a UV Disinfection System, along with all associated work detailed in the Contract Documents. Bidding documents are exclusively available through the PennBid website, and all official updates, including addenda, will be posted there; bidders are solely responsible for obtaining current information from this source. A pre-bid conference is scheduled for August 25, 2026, at the site in Canadensis, PA, and while attendance is encouraged, it is not mandatory. All bids must include a bid security of at least 10% of the total bid amount in the form of a certified check or bid bond, and questions regarding the documents must be submitted exclusively through PennBid—telephone inquiries will not be accepted. Bidders are required to comply with state antibid-rigging laws and must submit a non-collusion affidavit with their bid. The project is subject to Act 141 of 2022, mandating the use of E-Verify for all employees performing work, and requires submission of a Public Works Employment Verification Form as a condition for award. The Pennsylvania Prevailing Wage Act applies due to the project’s estimated cost exceeding $25,000. Bids must remain irrevocable for 60 days after opening, extendable to 120 days if award is delayed by external approvals, bond sales, or grant awards. The project is partially funded by a grant from the Commonwealth Financing Authority, and bidders are assured equal opportunity without discrimination on the basis of gender, race, color, creed, sex, age, physical disability, or national origin, with the same protections extended to all workers involved in contract performance.
Monroe County

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details