Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Materials and Delivery of Ready-Mix Concrete for the Community Development Block Grant Program

Closed
23/F24-069State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 925120
New
SLED
2026 Regional Transportation Plan & Sustainable Communities Strategy
Solicitation # NOC-2026-RTP-SCS
The San Joaquin County Council of Governments is preparing the 2026 Regional Transportation Plan and Sustainable Communities Strategy to guide transportation investment and land use planning across the region through 2050. This plan will update regional goals and policies to address evolving mobility needs, integrate transportation with housing and land use strategies, and align with state mandates to reduce greenhouse gas emissions under SB 375. Multiple growth scenarios will be evaluated to determine the most effective mix of projects and policies that achieve emissions targets while supporting equitable, accessible, and sustainable transportation options. The plan will also serve as the foundation for the Regional and Federal Transportation Improvement Programs, ensuring alignment with federal requirements and state climate objectives. As the designated metropolitan planning organization for San Joaquin County, SJCOG is responsible for developing a legally compliant Sustainable Communities Strategy that demonstrates how integrated planning can meet regional GHG reduction targets. The effort will involve extensive public engagement, data analysis, and coordination with local jurisdictions, transit agencies, and state entities to prioritize projects that enhance connectivity, reduce vehicle dependency, and promote affordable housing near transit. The Senior Regional Planner and Supervising Planner are the primary points of contact for this initiative, overseeing the technical development and community outreach components of the planning process. The plan is forecasted to be released in June 2026 and will inform transportation programming and funding decisions for the coming decades.
San Joaquin County Council of Governments

POSTED

6 days ago

DEADLINE

N/A
NAICS: 925120
SLED
CDBG PRO Housing Round 2: Addressing Zoning, Permitting, & Building Code Barriers to Affordable Housing
Solicitation # GR_4271_PROHOUSING
The CDBG PRO Housing Round 2 solicitation, issued by the Dane County Department of Human Services, seeks proposals from municipalities to remove regulatory, infrastructure, and capacity barriers to affordable housing. Eligible projects focus on code reform, such as updating zoning and land-use policies to support multifamily and mixed-use housing, as well as streamlining permitting and inspection processes. Municipalities may request funding between $15,000 and $150,000 for implementation-ready projects. The evaluation process is heavily weighted toward the project's logic model, which connects identified barriers to expected outcomes, accounting for 60 percent of the total score. Other scoring factors include cost and budget alignment, a project narrative, and the applicant's experience and qualifications. The submission deadline is November 13, 2026, with proposals required via the County's eProcurement Portal. Successful applicants must certify project readiness, ensuring 60 percent of milestones are completed within 18 months and 100 percent within 24 months. The contract term is one year with options to renew for four additional one-year periods, while the overall federal period of performance extends from February 2025 to September 2030. Compliance requirements include registration in SAM.gov and Grants.gov, adherence to non-discrimination and civil rights laws, and specific federal certifications regarding lobbying and labor practices. Payment is issued within 30 days of receipt of accepted goods or services, and administrative costs are capped at 15 percent.
Human Services

POSTED

22 days ago

DEADLINE

in 16 days

Documents

15

Clay County Request for Bids Procedures Chapter 8 Section I

PDF, High priority: read this first21 pages · rfb
High

Clay County Request for Bids Procedures Chapter 8 Section I

PDF, High priority: read this first21 pages · rfb
High

Invitation for Bid 23/24-069 Materials and Delivery of Ready-Mix Concrete

PDF, High priority: read this firstrfb
High

Performance and Payment Bond for Clay County Construction Project

DOC, High priority: read this first3 pages · bond
High

Resolution No. 2023.2024-TBD Federal Purchasing Policy Adoption

PDF, High priority: read this firstresolution
High

RFB 23/24-069 Materials and Delivery of Ready-Mix Concrete for Community Development Block Grant Program

PDF, High priority: read this firstrfb
High

Certificate of Final Payment

PDF, Low priority1 page · certificate-of-final-payment
Low

Certificate of Final Payment

PDF, Low priority1 page · certificate-of-final-payment
Low

Certificate of Partial Payment

PDF, Low priority1 page · payment-certificate
Low

Certificate of Partial Payment

PDF, Low priority1 page · payment-certificate
Low

Clay County Contractor Warranty Letter

PDF, Low priority1 page · contractor-warranty
Low

Clay County EFT Authorization Form

PDF, Low priorityother
Low

Clay County EFT Authorization Form

PDF, Low priority1 page · other
Low

IRS Form W-9 Request for Taxpayer Identification Number (2024)

PDF, Low priority6 pages · tax-form
Low

IRS Form W-9 (Rev. March 2024)

PDF, Low priority6 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from May 6, 2024 to Apr 25, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Public Works
Office AddressN/A

Full Description

Show more
Bidders shall submit all inquiries regarding this RFB in the Question and Answer tab of the RFB. See Inquiries/Questions in the Instructions to Bidders below for more information.Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule:Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids;

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Annual Limited Width (Strip) Milling and Resurfacing
Solicitation # ITB 27-120-LC
Alachua County's Public Works department is soliciting bids under ITB 27-120-LC for annual limited width strip milling and resurfacing on select county roads. The scope of work involves milling sections of travel lanes at a depth not exceeding 1.5 inches and replacing them with specified asphalt, adhering to current FDOT Standard Plans and Specifications for Road and Bridge Construction. The contract is scheduled to begin on October 1, 2026, and run through September 30, 2027, with the county holding an option to renew for two additional one-year periods. Award will be granted to the lowest responsive and responsible vendor, with a price preference available for certified Small Business Enterprises (SBE) and a 15 percent SBE participation goal in place. Bidders must submit their responses electronically via the county portal by November 25, 2026, at 2:00 pm EST. Required submissions include a bid bond equal to at least five percent of the bid amount, an operational plan, and certification of compliance with the Alachua County Government Minimum Wage ordinance. The contractor is required to provide all labor, materials, and equipment, and must maintain insurance as specified in the agreement. Payment will be processed monthly in accordance with the Florida Prompt Payment Act, though the county's obligation is contingent upon annual appropriations by the Board of County Commissioners. Quality control includes daily mixture testing at the plant and visual inspection by the County Engineer for placement acceptance.
Highway, Street, and Bridge Construction

POSTED

about 15 hours ago

DEADLINE

in 27 days
View Details
NAICS: 238910
New
SLED
ITB# RS-27-01 Demolition of Potters Park Concessions and Restroom Building in Redevelopment Area
Solicitation # ITB# RS-27-01
The Town of Davie, Florida, has issued Invitation to Bid ITB# RS-27-01 for the demolition and disposal of the Potters Park Concessions and Restroom Building located at 4250 SW 57th Terrace. The scope of work includes the removal of the building structure, slab, adjacent sidewalks, surrounding grassy areas, and the septic tank, followed by site restoration involving fine grading, topsoil application, and hydroseeding. The adjacent electrical building and its slab are specifically excluded from the demolition. The project has an estimated budget of 35,000 dollars, which includes a 3,500 dollar permit allowance and a 5,000 dollar contingency allowance. A pre-demolition asbestos survey conducted in September 2025 found no detectable quantities of asbestos, though the contractor remains responsible for the cost of removing any contaminated materials and recovering freon. Bids must be submitted electronically via the Town's e-Procurement portal by November 3, 2026, at 2:00 pm. The award will be granted to the lowest responsible and responsive bidder, with local preference credits of 5 percent for Davie vendors and 2.5 percent for Broward County vendors. The performance schedule consists of a 30-day permitting phase, 45 calendar days for substantial completion following permit issuance, and 15 days for final completion. Contractors must adhere to OSHA standards and the Florida Building Code, provide a bid bond, and certify that any soil used for restoration is virgin material from a clean site. Payment is typically processed within 30 to 45 days of receiving a proper invoice.
Site Preparation Contractors

POSTED

about 16 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Other Heavy and Civil Engineering Construction

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Construction of Building at Eagle Skate Park
Solicitation # 2026-ITB-PW-055-MR
The City of Cape Coral, Florida, is soliciting bids for the construction of a new building at Eagle Skate Park under solicitation number 2026-ITB-PW-055-MR. The project involves the construction of approximately 3,870 square feet of facility space, which will include office space, multipurpose rooms, a pro shop, a concession area, and various storage and building support services. The scope of work requires the contractor to provide all labor, materials, and equipment, with a performance period of 365 calendar days for substantial completion and 395 calendar days for final completion. Technical requirements include adherence to the 2017 NEC and NFPA standards, the 8th Edition Florida Building Code, and specific guidelines for electrical, plumbing, mechanical, and landscape installations. Bids must be submitted electronically via the OpenGov platform, with a final deadline of November 10, 2026, at 2:00 PM EST. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a local vendor preference available for those within 2.5 to 10 percent of the low bid. Required submittal documentation includes a bid bond equal to 5 percent of the base bid, a corporate resolution, a non-collusion affidavit, and proof of E-Verify enrollment. Additionally, the contractor must comply with strict environmental protections for the threatened burrowing owl and provide performance and payment bonds recorded in the Lee County Clerk of Courts within 15 days of contract execution. Payments will be issued via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Construction of Oasis Sports Fields
Solicitation # 2026-ITB-CP-058-JM
The City of Cape Coral, Florida, is soliciting sealed bids for the construction of the Oasis Sports Fields located at 3415–3519 Oasis Boulevard. This comprehensive project involves the development of a multi-purpose athletic complex featuring seven facilities: a two-story gymnasium and locker building, a concession hall, home and away dugouts, a baseball equipment shed, a track and field equipment shed, and a ticket kiosk. The scope of work includes all labor, materials, and equipment necessary for a code-compliant facility, including structural supports for spectator bleachers, scoreboards, shot clocks, and a wheelchair lift, as well as ADA-compliant access and parking improvements. The contract is based on EJCDC C-700 Standard General Conditions and requires substantial completion within 450 calendar days of the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by December 2, 2026, at 1:30 PM ET. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluations focusing on capacity, past performance, and financial stability. Required submission documents include a bid bond equal to 5 percent of the base bid, a non-collusion affidavit, and a full list of proposed subcontractors. Awarded contractors must provide construction performance and payment bonds. Project specifications mandate strict adherence to ASTM, ANSI, ASME, and IEEE standards, with specific environmental protections in place for gopher tortoise burrows. Payments will be made via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids under solicitation 2709ITB for the as-needed printing, fabrication, finishing, packaging, and delivery of various large-format signage, including vertical and horizontal pole banners, event banners, facility banners, and yard signs. This is a production and delivery only contract; installation, removal, and maintenance are specifically excluded. All bids must be submitted electronically via the OpenGov platform by November 19, 2026, at 3:00 pm, as paper submissions will not be accepted. Award will be granted to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the base bid pricing proposal. Qualified bidders must have at least three years of successful operation and possess the necessary organizational capacity and equipment to meet the city's requirements. Technical specifications mandate the use of heavy-duty vinyl for vertical pole banners with specific tensile ratings and double-sided full-color printing. Bidders are required to provide a bid security equal to 10 percent of the bid and, upon award, performance security equal to 100 percent of the contract price. Additionally, the successful contractor must maintain insurance with a combined single limit of at least 1 million dollars per occurrence and a general aggregate of 2 million dollars. The contract emphasizes strict quality control, requiring vendors to inspect products for dimensions and material quality before delivering them to the Public Works facility at 950 Bellevue Ave. Bidders must also comply with the U.S. Department of Homeland Security E-Verify system and provide a drug-free workplace certification. Local vendor preference under Code 30-86 will be considered as a primary tie-breaking factor. All artwork and production files provided by the city remain its exclusive property and must be protected from unauthorized distribution.
Sign Manufacturing

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Engineering Services

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS