This Government Contract opportunity from Department Of Defense was posted on May 28, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MCON P856, Manchester Tank Farm Improvements, Manchester Fuel Depot, Fleet Logistics Center Puget Sound (FLCPS), Manchester, Washington

Awarded
N44255-21-R-2000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 8 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The MCON P856 Manchester Tank Farm Improvements project, managed by NAVFAC Northwest for the Fleet Logistics Center Puget Sound in Manchester, Washington, involves the design and construction of new multi-product aboveground storage tanks. These tanks will feature fixed cone roofs, 100 percent internal coating, and integration into both JP-5 and F-76 piping systems. The construction must adhere to Unified Facilities Criteria 3-460-01 and Standard Tank Design AW 78-24-27, with a specific requirement to site tanks away from mapped seismic fault lines. The scope includes the installation of a secondary containment system and perimeter roadways, some of which are located within potentially contaminated sites. This unrestricted full and open competition project has a construction magnitude estimated between 25 million and 100 million dollars. Key requirements include strict adherence to environmental and safety guides, the management of merchantable timber, and compliance with heavy construction wage determinations for Kitsap County. Evaluation criteria emphasize contractor experience with fuel storage and containment projects exceeding 7 million dollars. The project also mandates a comprehensive small business participation strategy and requires rigorous base access and security clearances for all personnel.

General Info

Contract Value

$56,705,623.99

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Port Orchard, WA, 98366, USA

Set-Aside

NONE

Award Issued Date

Documents

40

Attachment I Example Overhead Forms.xlsx

XLSX, High priority: read this first5 pages · sow
High

Attachment L: Small Business Participation and Commitment Strategy

DOCX, High priority: read this firstsupporting-documents
High

FLC Puget Sound Manchester Fuel Department Contractor Environmental and Safety Guide

PDF, High priority: read this firstspecifications
High

N425521R2000 Amendment 0013 - Manchester Tank Farm Improvements

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0001

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0002

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0003

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0004 - P856 Manchester Tank Farm Improvements

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0005

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0006

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0008

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0009

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0010

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0011

PDF, High priority: read this firstamendment
High

N4425521R2000 Amendment 0012 - Manchester Tank Farm Improvements

PDF, High priority: read this firstamendment
High

N44255-21-R-2000 Manchester Tank Farm Improvements

PDF, High priority: read this firstrfp
High

N44255-21-R-2000 Manchester Tank Farm Improvements - Attachments A-C

DOCX, High priority: read this firstpast-performance
High

P-856 Phase 1 Manchester Tank Farm Improvements - Merchantable Timber Requirements

PDF, High priority: read this firstspecifications
High

Pole 13 Demolition Plan

PDF, High priority: read this firstspecifications
High

PPI Responses 0004 - Technical Q&A

PDF, High priority: read this firstq-and-a
High

PPI Responses 10

PDF, High priority: read this firstq-and-a
High

PPI Responses 5

PDF, High priority: read this firstq-and-a
High

PPI Responses 6 - Q&A

PDF, High priority: read this firstq-and-a
High

PPI Responses 7

PDF, High priority: read this firstq-and-a
High

PPI Responses 9

PDF, High priority: read this firstq-and-a
High

Solicitation N4425521R2000 Amendment 0007

PDF, High priority: read this firstamendment
High

WA20190071 - Construction Wage Determination (Kitsap County, WA)

PDF, High priority: read this firstwage-determination
High

WA20210071 - Wage Determination for Heavy Construction (Kitsap County, WA)

PDF, High priority: read this firstwage-determination
High

Attachment J - Base Access Request Form (Manchester, WA)

XLS, Low priorityspecial-notice
Low

Attachment K: Small Business Subcontracting Record

DOCX, Low prioritypast-performance
Low

Base Access Request Form - Fuel Tank Farm Improvements, Manchester, WA

XLS, Low priorityspecial-notice
Low

CUSFF/NAVNORTH COVID-19 Screening Questionnaire (V2020.03.17)

PDF, Low priorityother
Low

Excavation Permit - Naval Base Kitsap at Manchester

PDF, Low priorityother
Low

Manchester Field Depot Site Visit Sign-in Sheet (2021-12-09)

PDF, Low priorityother
Low

Manchester Tank Farm Improvement Project - PPI Responses

PDF, Low priorityq-and-a
Low

N4425518F4257 - Chemical Analytical Data Report (Manchester Tank Farm)

PDF, Low priorityspecifications
Low

SECNAV 5512 Form

PDF, Low priorityother
Low

SECNAV 5512 Form - Base Access/Local Population ID Card Application

PDF, Low priorityother
Low

Picture+1+Junction+Box+Photo.pdf

PDF

Site+Visit+Sign+In+Sheet.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

17 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Dec 15, 2020 to Jan 4, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 4, 2021 to Jan 7, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 7, 2021 to Jan 14, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 14, 2021 to Jan 21, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 21, 2021 to Jan 28, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Northwest
Contacts2 people available
OfficeSILVERDALE, WA, 98315-1101, USA
Office AddressSILVERDALE, WA, 98315-1101, USA

Full Description

Show more
The contract requirements include all design, repair, labor, material, equipment, supervision and associated costs to construct new Aboveground Storage Tanks (AST), which will provide AST's within a secondary containment system designed in accordance with the Unified Facilities Criteria (UFC) 3-460-01 and the current Standard Tank Design AW 78-24-27. The tanks will be multi-product, 100 percent internally coated, with a fixed cone roof; they will be connected to both the JP-5 and F-76 piping systems, and sited to avoid mapped seismic fault lines. Portions of the associated secondary containment and perimeter roadways will be located within potentially contaminated sites.

More opportunities from Department Of Defense → Navfacsyscom Northwest

Same awarding agency

NAICS: 237990
Federal
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Solicitation # N4425526R0005
The Naval Facilities Engineering Systems Command (NAVFAC) is soliciting proposals for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD). The project primarily involves heavy and civil engineering waterfront facilities, as well as commercial and institutional construction, located at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) at Naval Base Kitsap in Bremerton, Washington. The contract has a maximum aggregate estimated value of 15 billion dollars over a potential 10-year period, consisting of a five-year base period and one five-year option. Major task orders are expected to range from 2 billion to 6 billion dollars, though smaller task orders for Early Contractor Involvement and Alternative Technical Concepts may be issued. Each MACC holder is guaranteed a minimum of 1 million dollars. The solicitation is unrestricted and open to full competition, though large businesses must provide an acceptable small business subcontracting plan. Evaluation factors include experience, price, and small business utilization and participation. A key initial component is a seed project task order for Alternative Technical Concepts (ATC) Package 1 Marine, which focuses on innovative strategies to improve cost, schedule, and constructability. This specific effort includes the delivery of an ATC report and a facilitated panel discussion led by the contractor's key personnel. Offerors must be registered in the System for Award Management (SAM) and provide comprehensive documentation, including bonding capacity via a surety form, financial questionnaires, and historical small business utilization data. All work is subject to Davis-Bacon Act wage determinations for Kitsap County, Washington.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS