Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 24, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Metal Pavilion and Concrete Pad, Tenkiller Lake Oklahoma

Awarded
W912BV-16-R-0133Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
Mesilla Valley Community of Hope Building 5 Re-roof
Solicitation # 26-27-035
Solicitation 26-27-035, issued by the City of Las Cruces Public Works department, is for the re-roofing of Building 5 at the Mesilla Valley Community of Hope located at 999 W. Amador Avenue, Las Cruces, New Mexico. The project has an estimated total cost of 400,000.00 dollars and involves the removal and replacement of all existing insulation, roof membrane, and metal roofing. The scope of work includes the installation of thermoplastic membrane roofing, standing seam metal roofing, and sheet metal flashing and trim, along with additional insulation and cricketing materials to enhance drainage and performance. Additionally, the contractor must replace ceiling tiles and repair deteriorated stucco and windows at the clerestory. The facility must remain fully operational throughout construction, requiring materials to be procured and delivered prior to demolition to minimize disruption. Bids are due by 2:00 pm on November 3, 2026, and must be submitted via the OpenGov portal. The contract will be awarded based on the lowest individual, grouped, or lump sum unit price, with preferences of up to 10 percent available for New Mexico resident veterans, New Mexico residents, local Las Cruces businesses, and the use of recycled content. Awarded contractors must provide performance and payment bonds, proof of insurance, and adhere to prevailing wage rates as per Wage Decision DA-26-3243-B. All work must comply with SMACNA and AAMA 2605 standards, OSHA safety regulations, and New Mexico Administrative Code licensing requirements. The contract includes a one-year correction period for defective materials and workmanship, with liquidated damages set at 500 dollars per day.
Public Works

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54660
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF Rushville facility. The project requires 1,600 feet of Versico brand pads for existing tan TPO roofing and 400 feet of Firestone brand pads specifically for the Gamma housing unit roof. All pads must be 34 inches wide with a minimum thickness of 150 mil, feature a raised diamond plate tread pattern, and include safety yellow edges if available from the manufacturer. Installation must be performed by an approved Versico and/or Firestone installer in accordance with manufacturer specifications and ASTM standards. To be considered responsive, the prime vendor must perform at least 51 percent of the work using permanent, full-time W-2 employees who have been employed for at least 30 consecutive days prior to bid submission. Vendors must certify compliance with the Illinois Prevailing Wage Act, the Illinois Department Human Rights Act, and various state certifications regarding legal entity status, felony convictions, and tax delinquency. The contract includes a 12-month warranty period and allows for termination for convenience with 30 days' written notice. Payments are processed according to the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 22 days

General Info

Contract Value

$55,680

NAICS

238160 - Roofing Contractors

Place of Performance

RR 1 Box 259, GORE, OK, 74435-9512, USA

Set-Aside

SBA

Award Issued Date

Documents

3

Amendment 0001 to Solicitation W912BV-16-R-0133

PDF, High priority: read this firstamendment
High

Solicitation W912BV-16-R-0133: Authorization for Construction and Concrete Pad, Tenkiller Lake, OK

PDF, High priority: read this firstrfp
High

SOW - Pavilion Construction and Concrete Pad (Tenkiller Lake)

DOC, High priority: read this first8 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Tulsa
Contacts2 people available
OfficeTULSA, OK, 74137-4290, USA
Office AddressTULSA, OK, 74137-4290, USA
Contacts
Diane CianciContract Specialist
Brian J. AbelContracting Officer

Full Description

Show more
1. Page 38 of SOW states LD rate at 98/day, SOW states 1000/day. Please advise which is the actual damage rate if work isn't complete. $1000 seem punitive. The liquidated damages for this project will now be $250/day. 2. SOW 2.1.1.1 - states the manufacturer to provide requirements for footings. Is this stating that you want the manufacturer to include footing design with building design package submittal? Ref 2.1.2 also below for similar question? The manufacturer doesn't provide any foundation design services. The contractor shall follow any footing requirements by the building manufacture and approved by the COR to meet a minimum of a 12 in deep footing by 18 in wide footing the length of the perimeter. 3. 2.1.1.2 Concrete Work - mentions grade to be by the Government. At site the Government staff stated all work by the contractor. This site has approx 2-3 feet grade change in location identified. Please advise on requirement. Is there locations that we can excavate to obtain the required fill if this is required? Also is there now a requirement to remove all vegetation? Moving the building further east substantially benefits the site conditions where it is higher and more level, but still needs fill to accommodate. Noting the parking lot runoff drainage and ditch need to be quite clear of structure and taken into consideration on placement and elevations. May need to be included in foundation design. Need to know proposed elevation in relation to sidewalk or parking lot in reference to grade. The location of the pavilion shall be marked and a rough surface prepared by the government with final grading the responsibility of the contractor. All vegetation shall be removed prior to any concrete slab or footing being placed. 4. SOW 2.1.1.4 is confusing. Are they transposed in definition of membrane and moist process? Is the requirement the choice of the contractor to use chemical cure, or 2" sat sand with poly? Seems to be a large variance on cost impact and requirement. The sand method appears to be costly in material, manual labor, and removal. Also the weight is approximately 24 tons. Concerned with bare weight on new concrete with only mesh reinforcement. What is the expected removal and is there location to do this. I recommend simply allowing concrete to cure 'properly' and use industry standard concrete sealer. By properly I mean protecting from elements with saturated burlap sheet and poly. This is after-all a concrete surface, but needs to ensure adequate surface for occupancy and use. Concerned with sand protection and goal. Please advise. Section 2.1.1.4. was just giving a basic over guidelines and describing the two of the commonly used process that could be used. Ultimately it would be left up to the contractor with the COR approval before execution. 5. SOW 2.1.2 Shelter Recommendations - the provides some direction in minimum thickness for footing and states 4" slab w/ 2" slope. Says to refer to manufacturer. The manufacturer doesn't provide this typically. Also the minimum requirements have 12" thickness at edge of slab; however, it appears the building is 1' foot narrower then the slab size on perimeter; therefore, does the Government expect a 1 foot thickened edge outside the foundation yet to be designed, or just a thickened edge to minimize undermining of slab?. Shelter should be a 1 foot thick slab with and 18 inch width footing around perimeter of building. The slab is 1 foot larger in each direction than the metal building. 6. SOW 2.1.2 Shelter Recommendations - During site visit it was announced that stamped engineering design of foundation is needed. There are many assumptions to to price this requirement prior to award. The design will not be available, so the contractor needs to assume the design method e.g. spread footing, pier and beam, mat foundation, or combination of any. The sizing of this is based on other unknown information based on soil analysis of site. This will determine load factors and foundation requirements. Is design build of foundation a requirement and are these part of submittals? Please advise as there is a large cost variance in assuming this foundation. Can the Corp of Engineers provide a foundation section and/or clarify design build requirements. The manufacturer of the metal building should have to provide footing requirements to ensure their buildings/structures are built correctly/safely as they will warranty the work. There for a soil analysis of the site will not be needed due to the limited loading of a pavilion. The contractor shall follow any footing requirements by the building manufacture and approved by the COR to meet a minimum of a 12 in deep footing by 18 in wide footing the length of the perimeter. 7. 60 day performance period isn't sufficient to provide design (min 30), submittals (min 14), material orders (est. 42), and installation (min 21), cleanup & final acceptance. Can we propose our expected completion period? Please advise. The government is acceptable to increase the contract to 75 day performance period. 8. Will the COE locate the underground electrical on site? Stated between utility poles on site. Location of structure wasn't exact just in general vicinity. Appears to be east of this utility, but need to verify. The digging safety requirements are significant when close to utility and hand digging. The underground utilities are already de-energized and the government will mark the underground utilities before any construction begins. 9. Is sodding of site or seeding going to be required, as this site appears to be maintained grass area. Seeding isn't requirement as part of the SOW/Contract.

More opportunities from Department Of Defense → W076 Endist Tulsa

Same awarding agency

NAICS: 237990
New
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the design and installation of three identical excitation systems at the Webbers Falls Powerhouse in Oklahoma. The scope of work includes the demolition of existing equipment and the provision of full inverting potential source rectifier exciters, each consisting of a rectifier assembly and a power potential transformer. These systems must feature redundant controllers and rectifiers, utilizing microprocessor digital controllers capable of continuous operation in environments up to 40 degrees Celsius and 95 percent relative humidity. Key deliverables include the equipment, specified spare parts, and comprehensive training for maintenance personnel and operators. The project is scheduled for a performance period of 300 calendar days following the notice to proceed. The contract is a partial small business set-aside and will be awarded using the Lowest-Price, Technically Acceptable process. Technical evaluations focus on past performance, requiring the prime contractor to have completed at least three similar projects within the last five years, with at least one valued over 2 million dollars. Additionally, proposals are evaluated on the qualifications of key personnel, the adequacy of the work plan and schedule, and the ability to meet specific small business participation goals, including a total aggregate of 16 percent. Compliance requirements include adherence to NFPA 70 and IEEE C2 standards, MIL-STD-129 for shipment marking, and strict cybersecurity and facility clearance protocols. Payment requests must be submitted electronically via Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
Arcadia Wet Well Rehabilitation
Solicitation # W912BV26RA033
Solicitation W912BV26RA033 is a firm-fixed-price request for proposals issued by the US Army Corps of Engineers, Tulsa District, for the rehabilitation of wet well low flow gates at Arcadia Dam in Oklahoma County, Oklahoma. The project, categorized under NAICS 237990, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work includes the fabrication of two structural steel bulkheads, the removal and disposal of existing gates in the north wet well, and the construction and installation of ductile cast iron low flow inlet and low flow gates and appurtenances. Additionally, the contractor must replace all angle H frames and structural bolts in both the north and south wet wells. The government estimates a performance duration of 500 calendar days. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, with proposals evaluated on a pass/fail basis across technical factors including past performance, key personnel, and performance capability. To be eligible, offerors must be registered in SAM, provide a NIST score in the SPRS, and submit a bid bond. The project includes a base bid and four optional task groups for further gate installations in the south wet well and additional inlet gates across both wells. Compliance with the Davis-Bacon Act, Buy American-Construction Materials requirements, and EM 385-1-1 safety standards is mandatory. Proposals must be submitted electronically via the PIEE Solicitation Module by the extended deadline of November 9, 2026.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 13 days
View Details
NAICS: 236220
Federal
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Solicitation # W912BV26RA016
The US Army Corps of Engineers is soliciting proposals for the construction of a new Child Development Center (CDC) at Tinker Air Force Base, Oklahoma, under solicitation W912BV26RA016. This unrestricted, full and open competition project involves the creation of a single-story facility designed to accommodate 228 children from infancy to five years old, along with 80 staff members and visitors. The construction will feature a drilled pier foundation, concrete slab, steel frame, double wythe masonry exterior walls, and a standing seam metal roof. Key interior spaces include nine infant/pre-toddler activity rooms, six toddler activity rooms, three pre-school activity rooms, a commercial kitchen, administrative and support spaces, isolation rooms, lactation rooms, and a tornado storm shelter meeting ICC 550 and FEMA criteria. The project also includes a playground area and a CCTV system. The procurement is being conducted as a firm-fixed price contract using a Best Value Trade-Off method, with a construction magnitude estimated between $50,000,000 and $75,000,000. The design is based on USAF prototype facilities criteria FC 4-740-14F. The estimated period of performance is 732 days after the Notice to Proceed. This project falls under NAICS code 236220 for Commercial and Institutional Building Construction and carries a DPAS rating of DO-C2. Proposals are due by October 30, 2026, at 1500 central time, and must be submitted electronically via PIEE by offerors registered in the System for Award Management.
Commercial and Institutional Building Construction

POSTED

12 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS