Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Minor Construction / Sustainability, Repair and Maintenance

Active
W519TC-26-Q-JOC1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

McAlester, OK, 74501, USA

Set-Aside

NONE

Documents

4

Attachment 0004 - Clauses

PDF, High priority: read this firstspecifications
High

McAlester Army Ammunition Plant Job Order Contracting SOW

PDF, High priority: read this firstsow
High

Reference Drawings - 50x100x18 Red Iron Storage Facility

PDF, High priority: read this firstspecifications
High

SOW for 50x100x18 Red Iron Storage Facility

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-0000, USA
Office AddressROCK ISLAND, IL, 61299-0000, USA

Full Description

Show more

The Solicitation will be for projects within the McAlester Army Ammunition Plant (MCAAP). The contractor shall perform all work required as specified within the Statement of Work (SOW) in each individual Task Order (TO). The general description of the work of this Job Order Contract (JOC) includes, but is not limited to, a broad range of sustainability, repair, and maintenance (SRM), and minor construction work on real property at MCAAP. The work is required in support of Directorate of Public Works (DPW) activities.


The contract comprises a one-year (1) base period with four one-year (1) option periods.


This requirement is a total small business set-aside under NAICS 236220 – Commercial and Institutional Building Construction, size standard $45M.


Individual task orders will be firm-fixed price and contain the following limitations:


    1. The Base Year will have an established value with a minimum limit of $5,000 and a maximum limit of $19,800,000.
    2. Option Periods 1 through 4 will have an established value with a minimum of $5,000 and a maximum limit of $19,800,000.
    3. The total maximum value of all Task Orders issued under this Master Agreement (including all option years) shall not exceed $99,000,000.00.

EVALUATION OF PROPOSALS


                Proposal shall contain the complete solicitation number (W519TC-26-Q-JOC1), and a complete detailed proposal for the sample TO as specified in the EXAMPLE Statement of Work (SOW) titled, "50’x100’x18’ Red Iron Storage Facility". The sample TO is for evaluation purposes ONLY. The single, comprehensive coefficient proposed for the sample TO, representing all direct and indirect costs not included in the RSMeans Unit Price Book (UPB), shall be the coefficient utilized by the contractor for all future TOs. This single coefficient is the only price factor to be proposed. Any questions should be addressed no later than 30 OCT 2026 (10 days before end of solicitation) and sent via email to Jessica Parr at jessica.m.parr2.civ@army.mil.  Sample proposal is DUE 09 NOV 2026 no later than 5:00PM CST via email to jessica.m.parr2.civ@army.mil.


Work under any TO issued as the result of any contract awarded shall be performed in strict accordance with the TO SOW, the broad SOW incorporated in this solicitation, and all applicable federal, state and local environment laws, regulations, and policies


No work shall commence without a formally executed Task Order. The process shall be as follows:


  • A. Joint Scope Meeting: Upon identifying a need, MCAAP and Contractor shall conduct a site visit to jointly define the precise Scope of Work (SOW).
  • B. Proposal Submission: The Contractor shall submit a detailed price proposal based strictly on the agreed SOW, utilizing the Unit Price Book (UPB) line items, exact quantities, and the applicable Adjustment Factor.
  • C. Issuance: Upon MCAAP review and approval of the proposal, MCAAP will issue a signed Task Order detailing the exact firm-fixed price and the Required Completion Date.

If a required task or material is not listed in the UPB, it shall be classified as a Non-Pre-Priced (NPP) item. For any Non-Pre-Priced (NPP) item required during the performance of a Task Order, the Contractor must obtain and submit a minimum of three (3) independent quotes from subcontractors or suppliers. The Contractor may then apply their accepted NPP Markup Factor to the lowest responsive quote. NPP items must not exceed 10% of the total cost of any individual Task Order.


  • Payment & Performance Bonds: The Contractor shall provide a Payment and Performance Bond for 100% of the value of any individual Task Order exceeding $35,000 (or as dictated by local statute).
  • Insurance: The Contractor must maintain Commercial General Liability, Worker’s Compensation, and Automobile insurance for the duration of this Master Agreement, naming the Owner as an additional insured.

If the Contractor fails to complete a Task Order within the time specified in that specific Task Order, the Contractor shall pay MCAAP liquidated damages at the rate specified in the individual Task Order (e.g., $500 per calendar day) until the work is substantially complete.


PRICING & THE UNIT PRICE BOOK (UPB)
Pricing for all standard work under this contract shall be based on RSMeans Facilities, RSMeans Electrical, RSMeans Heavy Construction, RSMeans Mechanical, and RSMeans Plumbing. All publications are dated 2026. The prices in the UPB serve as the firm-fixed baseline.


The Contractor’s accepted bid Coefficients (Adjustment Factors) will be applied to the UPB line items to calculate the final price of each Task Order. The Contractor's negotiated Adjustment Factors are:


COEFFICIENT/PRICE SCHEDULE


  1. Contractor

a.             The R. S. Means (RSM) Facilities Construction Cost Data Book (current edition at the time of bid submission) shall be used when developing coefficients for each year of the base period. RSM and 4Clicks Project Estimator software, E4Clicks Premier Version 2.615 (http://www.4clicks.com), shall be used to develop proposals in response to each task order RFP.


b.             The price offer shall be comprised of coefficients. A coefficient, as defined in AFARS 5117.9001, is "a numerical factor that represents costs (generally indirect costs) not considered to be included in RSM unit prices (e.g., general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, and also contractor's profit)."


c.             Coefficients proposed and accepted upon award are multiplied by unit prices in RSM to price a job or project on individual task orders. The coefficients proposed are incorporated in the Job Order Contract (JOC). Offerors who submit separate coefficients for separate line items in RSM will be considered unacceptable and the offer will be rejected.


Coefficients are limited to three decimal places and submitted as a whole number. For example: 1.015.


d.             When developing proposals, use "Average" rows in RSM if shown. If only "Minimum/Maximum” rows are shown, use the "Minimum" row. Also, use the column entitled "Total Bare Costs" which includes material, labor, and equipment. Do not use the column "Total Incl O & P."


e.             The offeror's price coefficient must include but is not limited to the following:


1.             Overhead
2.             Profit (prime and subcontractors)
3.             Insurance
4.             Compliance with environmental laws, protection and safety
5.             Tax Laws
6.             Protection or moving of Government property
7.             Administrative work
8.             All costs associated with bonding (bond premiums)
9.             Submittals
10.          Price quotations
11.           Contractor adjustments to RSM unit prices
12.          Clean-up
13.          All waste and excess materials
14.          Permits, licenses and fees
15.          Mobilization and close-out for total contract and each delivery order
16.          Signs and barriers
17.          Project management and supervision
18.          Quality Control
19.          Office management and equipment
20.          Interest associated with funding of equipment and payroll
21.          Depreciation of site offices
22.          Employee payroll taxes, insurance and fringe benefits
23.          Risk of lower-than-expected contract dollar volume
24.          Risk of high inflation costs for coefficients bid for future years
25.          Risk of poor subcontractor performance and re-performance
26.          Other risks of doing business
27.          Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)
28.          The offeror should consider the cost of final clean-up and removal and hauling of trash, debris and rubbish in the coefficients. The Government will not pay nor accept line items for the final clean-up or rubbish, hauling, etc., on delivery orders, unless it is explicitly excluded by the line items in RSM.
29.          Travel
30.          Performance and Payment bonds.
31.          As-built drawings
32.          City cost indexes


The unit prices stated in RSM include labor, materials and equipment. Cost of performance and payment bonds are part of the coefficient, per AFARS 17.9001. All costs shall be included in the proposed coefficients as no allowance will be made after award.


The offeror must provide their coefficient formula with their proposal.


  1. Work Hours

  • Normal Working Hours (6:00 AM – 4:30 PM, M-T)
  • Other-Than-Normal Working Hours (Nights, Weekends, Holidays) 

BASIS FOR CONTRACT AWARD


(A) Contract Vehicle:
The award will result in a Firm-Fixed-Price (FFP), Job Order Contract (JOC). The awardee will have a total maximum capacity (ceiling) of $99,000,000 over the life expectancy of the contract, which includes a one (1) year base ordering period and four (4) one-year optional ordering periods.


(B) Fair Opportunity:
The Government does not guarantee any specific volume of work beyond the minimum guarantee of $5,000 for the base contract awardee.


(C) Evaluation and Selection:
Award will be made to the responsible offeror whose proposal represents the Best Value to the Government. For the purposes of this solicitation, all non-price factors combined are significantly more important than price. The Government intends to evaluate proposals and award this contract without discussion but reserves the right to conduct discussions if determined necessary.


Proposals will be evaluated based on the following factors:
Factor 1: Past Performance. The Government will evaluate the offeror's demonstrated record of successfully performing work of similar size, scope, and complexity. Offerors must provide 3-5 completed government projects ranging from $100,000.00 to $3,000,000.00. The evaluation will assess the quality and relevance of the contractor’s experience based on the following information for each project:


  • Contract Number and Value
  • Detailed Description of Work
  • Demonstrated Technical Quality
  • Evidence of Cost Control
  • Adherence to Schedule/Timeliness
  • Management/Business Relations and Customer Satisfaction
  • Small Business Subcontracting achievements

Factor 2: Price. The price evaluation will be based on the total evaluated price for the sample TO, derived from the offeror’s proposed coefficient. While price is the least important factor, it will be evaluated for fairness and reasonableness.


    1. Offers, along with all required documents, shall be submitted electronically via email to the Contract Specialist at jessica.m.parr2.civ@army.mil. Offerors should include “Response to W519TC-26-Q-JOC1” within the subject line. Packages are DUE 09 NOV 2026 by 5:00 p.m. CST via email.

          Questions shall be submitted in the same manner as Offers, electronically via email to the Contract Specialist no                  later than 10 days before Solicitation closes, or 30 OCTOBER 2026, to allow sufficient time to respond and Amend                Solicitation as needed.


NOTE: Questions not received within a reasonable time prior to close of the Solicitation WILL NOT be considered.


PAYMENT: The Wide Area Workflow (WAWF) System, available through the Procurement Integrated Enterprise Environment (PIEE) System, is required for use under any resultant TO. This is the Government's electronic process for receipt and acceptance documents and contractor payment.


Please provide the following information:


          Unique Entity ID:
          DUNS Number:
          Cage Code:
          Taxpayer ID Number:
          Email Address:


Point of Contact


The point of contact for this award is Contract Specialist, Jessica M. Parr at jessica.m.parr2.civ@army.mil

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. This Firm Fixed Price task order, with an estimated magnitude between 1 million and 5 million dollars, requires the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifiers and a dry pipe fire suppression system. The facility must be solar-ready, featuring conduit below the roof structure for future photovoltaic panels. All work must adhere to strict technical standards, including UFC 3-600-01, NFPA 13, and the 2021 International Building Code, with specific requirements for stormwater mitigation via an infiltration pond. The project must commence within 10 calendar days of the Notice to Proceed and be completed within 365 calendar days. Award will be based on a balanced evaluation of technical capability and price, with a particular focus on the proposed task-oriented schedule and the qualifications of key personnel. Bidders must provide a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, and are subject to prevailing wage rates per General Decision Number WA20260111. Proposals are due by 12:00pm PST on October 18, 2026, and must be submitted to the Washington Army National Guard.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and structural steel to mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the full bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the main facility featuring a Membrane Bioreactor plant, UV disinfection, SCADA systems, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for various water and sewer services. The total duration for completion is 915 calendar days, with a critical requirement to keep the existing plant operational during the first two phases of construction. This solicitation is open to small businesses, including certified veteran, women-owned, and disadvantaged business enterprises, with a specific local hiring goal of 50 percent of the workforce from the Monterey Bay Area. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Subcontractors must agree to the standard Overaa agreement without modification and comply with specific insurance requirements, including a waiver of subrogation for workers compensation. Administrative operations will be managed through the Textura electronic invoicing system, with service fees being the responsibility of the subcontractor.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature specialized foundations with rigid inclusions and load transfer mats, intrusion detection systems, grounding and lightning protection, and extensive site work including rock excavation and wetlands mitigation. The solicitation seeks pricing across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, mechanical, and plumbing. Infrastructure improvements will include primary and secondary electrical distribution, telecommunications, access roads, and paved loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to obtain the formal bid invitation and project documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 332991
New
Federal
M7A1 Bearing Material
Solicitation # W519TC27QA012
Army Contracting Command - Rock Island Arsenal issued solicitation W519TC27QA012 for the procurement of M7A1 Bearing Material to support the Rock Island Arsenal Joint Manufacturing Technology Center. This is a 100 percent total small business set-aside that will result in a firm fixed price contract awarded to the lowest price, responsive, and responsible contractor. The requirement consists of three line items totaling 424 feet of self-lubricating bearing material, specifically requested in 5 by 96 inch sheets with a thickness of .0585 to .0605 inches. The material must feature a steel backing, a porous copper-tin bronze inner structure, and a PTFE/Pb bearing surface, meeting strict technical specifications for compressive strength, load capacity, and a temperature range of -328 to 536 degrees Fahrenheit. Technical compliance is governed by Drawing 1110700278 and the associated Purchase Description. While The Timken Company is suggested as a source of supply, equal materials are acceptable provided a specification sheet and Certificate of Conformance are submitted. Delivery must be made to Rock Island Arsenal via flatbed truck, with materials securely banded to pallets and separated by heat number in bundles not exceeding 5,000 pounds. A Certificate of Conformance and certified test results must accompany the delivery, as shipments without these documents will be rejected. Quotes are due by October 20, 2026, and must include shipping costs to Rock Island, Illinois.
Ball and Roller Bearing Manufacturing

POSTED

2 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS