MMW Chiller For Balance of Plant
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The procurement is for a single, self-contained, outdoor-rated 20-ton air-cooled industrial process chiller system equipped with an integrated glycol pump and glycol buffer tank, designed to cool a 50/50 propylene glycol and water mixture to 35°F at a flow rate of 60 to 90 GPM for use in condensing and drying water from a hydrogen stream produced by a MultiMegawatt proton exchange membrane electrolyzer. The system must reliably deliver a minimum of 15 tons of cooling at 35°F under 95°F ambient conditions at an elevation of 6,000 feet and be housed in a NEMA 3R-rated enclosure, powered by 480 VAC three-phase electricity, with all electrical components OSHA-approved and NRTL-listed (UL, CSA, etc.). The contract is conducted as a Request for Quote under solicitation RFQ-2026030648, issued by the National Laboratory of the Rockies on behalf of the Department of Energy, with a response deadline of July 20, 2026, at 12:00 p.m. Mountain Time. Award will be made using the Lowest Price Technically Acceptable method, where technical acceptability and proper tariff identification are mandatory pass/fail gates. Offers must comply with the Buy American Act, with preference given to domestic proposals and foreign offers subject to evaluation adjustments under FAR 25.106 and Subpart 25.5. Respondents are required to certify current, accurate, and complete SAM.gov size and socioeconomic status representations or submit a formal Small Business Certification Form, and the small business size standard for NAICS 333415 is 1,250 or fewer employees. All quotes must include itemized tariff costs based on rates effective as of the proposal due date, the country of origin for each item, a statement on the applicability of the Duty Free Entry clause in Appendix B-8, and a declaration of whether the offeror will serve as the importer of record. Price adjustments for tariff changes are permitted only if they exceed $250 and require written warranty from the vendor that no contingency was included in the original bid. Delivery is due by September 11, 2026, at the place of performance in Golden, Colorado, and offers must include a schedule detailing delivery timing from receipt of order. Submission is electronic to Allison Pe
General Info
Agency
NAICS
Place of Performance
Golden, CO, 80401, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
8/28/26 Amendment No. 1 extends the due date to 9/9/26 12:00Pm MDT.
7/16/26 Amendment No. 1 posted to address the technical questions received. At this time we do not need to extend the due date.
This procurement is for a single, self-contained, outdoor-rated 20-ton air-cooled industrial process chiller system complete with an integrated glycol pump and glycol buffer tank system.
The primary function of this equipment is to cool and circulate a 50%/50% propylene glycol/water mixture at a set temperature of 35°F (with a flow rate of 60–90 GPM) to condense and dry water out of a hydrogen stream generated by a proton exchange membrane (PEM) electrolyzer. The system must operate under variable loads and survive extreme ambient outdoor conditions at an elevation of 6,000 feet.