This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Monongahela NF FR 19 Box Culvert Replacement Amendment 2

Awarded
12363N26Q4082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237310
New
Federal
FA8501-27-RAPID-PAVE-OTA
Solicitation # FA8501-27-RAPID-PAVE-OTA
The Department of the Air Force, 78th Civil Engineer Group, is seeking industry solutions to restore, modernize, and sustain critical airfield infrastructure at Robins Air Force Base, Georgia. Executed under the Robins Agile Practices for Infrastructure Development (RAPID) framework and the statutory authority of 10 U.S.C. 2808a, this project utilizes a Build-Only Other Transaction Agreement (OTA) approach. The scope of work involves the repair and replacement of runway 3901 pavement and shoulders, the south runway overrun, Taxiway C (Facility 3931), and drainage and storm-drain disposal systems at Facility 8700. The estimated magnitude of construction for this effort is between 58 million and 108 million dollars, with a total contract period of performance of 1,120 calendar days after the Notice to Proceed. The government is utilizing a two-step, best-value selection process. Step one requires a Phase 1 Solution Brief, due by 3:00 PM EST on October 30, 2026, which must demonstrate at least five years of experience in comparable government runway or taxiway projects. Short-listed firms will advance to step two, consisting of interactive pitch presentations and the submission of a formal price proposal. Evaluation factors focus on past performance in restricted airfield environments, the qualifications of key personnel, technical understanding of the 100 percent government-furnished design, and financial bonding capacity. Special emphasis is placed on managing congested site logistics, mitigating environmental risks related to PFAS-impacted soil, and minimizing disruptions to active aircraft operations.
FA8501 Opl Contracting Afsc/pzio

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Traffic Signal Maintenance Throughout The City Of Brea
Solicitation # 26-02
The City of Brea is soliciting proposals under solicitation number 26-02 for the comprehensive maintenance of traffic signal facilities throughout the city. The scope of work encompasses approximately 53 city-owned signalized intersections and five flashing beacon locations, including all associated controllers, cabinets, detection systems, battery backups, and fiber-optic networks. The selected contractor must provide all necessary labor, materials, and equipment, ensuring that all emergency and field responses are performed by or supervised by an IMSA certified Traffic Signal Technician. Key performance requirements include a 24-hour response time for routine service requests and the maintenance of specific spare hardware, including Econolite ASC/3 and Trafficware Scout controllers. The contract will be awarded based on best value rather than the lowest cost, with evaluation weighted across firm qualifications (30%), proposed team and organization (25%), the detailed work plan (25%), and the fee schedule (20%). Proposals must be submitted in hard copy and via flash drive to the City Service Yard by November 12, 2026. The agreement includes a one-year warranty on services and requires compliance with California Labor Code regarding workers' compensation and prevailing wages. Payment is structured on a net 30-day cycle following the receipt of undisputed invoices. Required submission documents include a noncollusion declaration, a declaration of eligibility to contract, and a detailed payment schedule.
CITY OF BREA

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
HSIP Cycle 11 Pedestrian Crossing Enhancements
Solicitation # 2026-IFB-CIV-0436
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0436 for the HSIP Cycle 11 Pedestrian Crossing Enhancements project. The scope of work involves furnishing and installing rectangular rapid flashing beacons (RRFB) at two specific intersections: Green Street at Michigan Avenue and Green Street at Chester Avenue. Key deliverables include the installation of signal poles, flashing beacons, conduits, conductors, and pull boxes, as well as associated civil works such as curb ramp work, miscellaneous concrete, and traffic striping. The project must adhere to 2024 CalTrans Specifications for concrete testing and City of Pasadena Standard Plan S-414 for embedded federal yellow detectable warning surfaces. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total of the bid. Bidders must submit their responses electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 19, 2026. Required documentation includes a 5 percent electronic surety bid bond, Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a DHS Disclosure Form, and a signed IRS Form W-9. Contractors must be registered with the California Department of Industrial Relations and comply with state prevailing wage laws and equal employment opportunity practices. Performance must begin within 15 calendar days of the Notice to Proceed, with a base bid completion timeline of 60 working days and a bid alternate timeline of 10 working days. The contractor is required to obtain a Pasadena business license and comply with federal-aid contract language, including form FHWA-1273. Invoicing is managed through the City's dedicated online submission website, with checks issued on Tuesdays and Thursdays. All work must be fully accessible in accordance with the California Building Code and Title 24 regulations.
Public Works Department, Engineering

POSTED

about 4 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
NORTH WOODBRIDGE PEDESTRIAN BRIDGE
Solicitation # 700629-27
Invitation for Bid IFB 700629-27 is a solicitation issued by Prince William County for the construction of the North Woodbridge Pedestrian Bridge located on Route 1 in Virginia. The project scope encompasses the construction of a pedestrian bridge and related site work, including the installation of a deck drainage system and bridge vibration monitoring. The contract will be awarded to the lowest responsive and responsible bidder. Performance must begin within 15 calendar days of the Notice-to-Proceed, with all work, including punchlist items, to be completed within 730 calendar days. The project is subject to strict regulatory and technical standards, including the 2020 VDOT Road and Bridge Specifications, the 2016 VDOT Road and Bridge Standards, and ADA-ABA Accessibility Guidelines. Key requirements include adherence to Buy America and Build America Buy America Act (BABA) standards for steel and iron materials, as well as compliance with the Davis-Bacon Act for prevailing wage rates. The contractor is responsible for the design and fabrication of specific bridge components through a qualified manufacturer and must provide a one-year maintenance and preservation period following VDOT acceptance. Bids must be submitted electronically via the Supplier Portal by the final deadline of November 6, 2026. Required submission documents include a proposal form, a detailed summary schedule of unit prices covering 91 line items, a bid bond, and various VDOT certifications. The contractor must provide performance and payment bonds for 100 percent of the contract sum and maintain comprehensive insurance coverage with a minimum AM Best Rating of A- VIII.
Prince William County BU

POSTED

about 10 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

This is a firm-fixed-price, total small business set-aside construction contract for the replacement of a box culvert on Forest Road 19 in the Monongahela National Forest, West Virginia, with performance required near Lanesville and Elkins. The contract, issued under NAICS code 237310 with a solicitation number of 12363N26Q4082, is administered by the USDA Forest Service’s Stewardship Contracting Branch and is restricted to small businesses as defined by the SBA’s $45 million annual receipts size standard. All proposals must be submitted electronically by April 28, 2026, at 11:00 AM Eastern Time, with questions due by April 20, 2026. Performance must be completed within 40 calendar days of the Notice to Proceed, with a firm end date of September 30, 2026. The scope includes excavation, dewatering, riprap placement, aggregate surface course, backfill, bedding material, and installation of a 4x14 foot concrete box culvert, with detailed work specifications provided in referenced drawings and plans for Mile Post 6.589. The contract requires full compliance with numerous FAR clauses, including site investigation and differing site conditions, accident prevention, inspection of construction, and labor standards under the Davis-Bacon Act. Payment protections include irrevocable letters of credit, performance and payment bonds, and individual surety pledges, with accelerated payments mandated for small business subcontractors. The government retains inspection and acceptance authority at the project site, with quality standards referencing AASHTO #8 bedding material and other technical specifications. Special requirements include safeguarding of government information systems, flow-down of certifications to subcontractors, mandatory adherence to Executive Orders 14168 and 14173 regarding anti-discrimination and DEI, and strict financial safeguards such as repayment of unearned amounts and suspension of progress payments if security is compromised. Offerors must certify their small business status and provide UEI and CAGE codes, and the award will be based on a best-value trade-off among technical capability, past performance, and price, with no formal weighting assigned. No contract value is specified due to omitted unit prices, but mobilization and itemized quantities are detailed in the schedule of line items.

General Info

Replacement of box culverts on Forest Road 19, Monongahela National Forest, WV; small business set-aside.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Elkins, WV, 26241, USA

Set-Aside

SBA

Documents

4

Amendment 0002 to Solicitation 12363N26Q4082

PDF, High priority: read this firstamendment
High

RFQ 12363N26Q4082 Monongahela NF Box Culvert Replacement

PDF, High priority: read this firstrfq
High

12363N26Q4082+Monongahela+NF+Box+Culvert+Replacement.pdf

PDF

Sol_12363N26Q4082_Amd_0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
Contacts1 person available
OfficeWashington, DC, 202501138, USA
Office AddressWashington, DC, 202501138, USA
Contacts
cynthia horwitz

Full Description

Show more

Amended Solicitation with additional FAR clause posted 4.23.2026


Amendment 2 with questions and answers posted 4.23.2026


Amendment 1 with questions and answers posted 4.20.2026.


This is a non-personal construction contract for box culvert repairs on FR 19 in the Monongahela National Forest in West Virginia.

More opportunities from Department Of Agriculture → Stewardship Contracting Branch Usda-Fs

Same awarding agency

NAICS: 113310
New
Federal
Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit
Solicitation # 12363N27Q4000
The USDA Forest Service is seeking capability statements from qualified small businesses for the Cowboy Hat Stewardship Integrated Resource Service Contract within the Lake Tahoe Basin Management Unit. The project focuses on hazardous fuel reduction and forest restoration in areas affected by the Caldor Fire, specifically across a 545 acre contract area. The required logging mechanism is Cut-to-Length harvesting, which involves cutting and processing trees at the stump and forwarding material to landings. The scope of work includes cutting and forwarding biomass across 205 acres, mechanical mastication of dead and down material, removing approximately 2,603 tons of biomass and cull logs to off-forest sites, and constructing and decommissioning 1.4 miles of temporary roads. Optional tasks include hand thinning and hand fuel treatment across 177 acres. Performance is anticipated to begin in early summer 2027, with a strict completion deadline of September 15, 2027, due to grant funding expiration. The contract requires adherence to strict environmental and safety standards, including California Public Resources Code fire precautionary measures and specific erosion control protocols such as scarification and tillage. Compliance will be verified by the Forest Service through visual inspections and plot sampling, where a 90 percent acceptance rate per treatment unit is required. Interested vendors must submit capability statements detailing their experience with Cut-to-Length systems and fuel reduction by November 2, 2026, and are invited to a site visit on November 3, 2026.
Logging

POSTED

5 days ago

DEADLINE

in 5 days
View Details
NAICS: 113310
Federal
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon
Solicitation # 12363N26Q4181
Solicitation 12363N26Q4181 is a request for quotations for the Corral G-Z Integrated Resource Stewardship Contract (IRSC) within the Bly Ranger District of the Fremont-Winema National Forest in Oregon. This small business set-aside project follows the G to Z model to restore forest health and mitigate catastrophic wildfire risks by reverting stand density and species composition to historical ranges of variability. The scope of work includes professional forestry services such as harvest layout, timber marking, and cruising, as well as the commercial harvest and removal of approximately 191,379 tons of timber across 7,000 acres and fuels reduction on 17,000 acres. Specific restoration activities include whole tree yarding, removing encroaching conifers in meadows, and performing release cuts in whitebark pine stands. The government will award a firm-fixed price contract based on a best-value tradeoff, evaluating technical approach, relevant past performance from the last three years, and benefits to the local community within 60 miles of Bly, Oregon. The period of performance extends from the date of award through October 31, 2031. Key requirements include compliance with Federal Geographic Data Committee standards for geospatial deliverables, adherence to a strict fire plan, and following specific road maintenance and traffic control specifications. Performance is subject to a quality-based payment scale, where work quality below 85 percent is considered unacceptable and ineligible for payment. Quotes must be submitted as separate technical and price proposals by November 16, 2026.
Logging

POSTED

14 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS