Morrision Creek and Beach Lake Levee Resiliency Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Morrison Creek and Beach Lake Levee Resiliency Project, managed by the Sacramento Area Flood Control Agency, involves comprehensive infrastructure improvements along a 3.7-mile stretch of levee in Sacramento County, California. The scope of work includes raising approximately 17,550 linear feet of existing levees through crown regrading and minor landside slope fills, as well as the removal and replacement of 1,279 linear feet of floodwalls and the construction of 437 linear feet of new floodwalls. Additional technical requirements include landside slope flattening, the repair of a Union Pacific Railroad stoplog structure, and the construction of a new levee turnaround. The project also integrates nature-based solutions to enhance ecological function and long-term resilience. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration approved on September 17, 2026, to address potential impacts on biological, cultural, geological, and hydrological resources. Performance is centered in Sacramento, extending from State Route 160 near Cliff's Marina to approximately 0.75 miles north of Cosumnes River Boulevard. Coordination involves multiple agencies, including the USACE, USFWS, and FEMA, with administrative oversight provided by the Sacramento Area Flood Control Agency and consulting support from GEI Consultants.

General Info

Sacramento Area Flood Control Agency levee and floodwall resiliency project in Sacramento County.

Agency

California → Sacramento Area Flood Control Agency

Place of Performance

Beach Lake Levee Road and Cosumes River Boulevard, Sacramento, CA, 95832

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Area Flood Control Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento Area Flood Control Agency
Office AddressN/A
Contacts
Dan TibbittsPrincipal Engineer
Drew SuttonCEQA/NEPA Practice Lead, Senior Project Manager

Interested Companies (1)

GEI ConsultantsSacramento, CA

Full Description

Show more
The project would raise approximately 17,550 linear feet (LF) of the existing levees, by regrading the existing levee crowns and performing minor landside slope fills; removing and replacing approximately 1,279 LF of existing floodwalls, and constructing an additional 437 LF of new floodwall; landside slope flattening, repair of an existing Union Pacific Railroad stoplog structure, construction of a new levee turnaround, and nature-based solutions enhancing the ecological function and long-term resilience of the levee system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS