Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MSE Wall and Embankment Stability Berm Construction

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel tanks at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project requires a contractor to provide all labor, materials, and equipment to remove and dispose of one 600 gallon fuel tank, a catch basin containing approximately 300 gallons of fuel, a 10 gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275 gallon insulated double walled fuel tanks, a new 10 gallon day tank, grounding systems, a fuel transfer pump, vent pipes, fill whistle, crossover manifold kit, fill caps, fuel level gauges, a tie down kit, and new fuel supply return lines. The work must be completed within a 120 day period of performance and adhere to all local, state, and federal laws. This procurement is a total small business set aside under NAICS code 237120, with a construction magnitude of less than 25,000 dollars. The contract is a firm fixed price agreement. To be considered responsive, all vendors must maintain an active registration in SAM.gov at the time of submission. The solicitation process includes a requirement for a detailed solicitation survey regarding vendor qualifications and a comprehensive safety and accident prevention plan. The deadline for responses is September 15, 2026, at 5:00 PM Eastern.
W2SD Endist New England

POSTED

2 days ago

DEADLINE

in 3 days
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, managed by the USACE Japan Engineer District, is for the Bulk Fuel Storage Tanks Phase II project at Yokota Air Base, Japan. The scope of work involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank, a reinforced concrete pump house containing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump, and an access tunnel. The project includes the installation of a product saver tank, an automatic tank gauging system, and the necessary piping and control systems to integrate the new facility with the existing filter separator building. The estimated magnitude of the project is between 7.5 and 15 billion Yen, with a period of performance of 1,020 calendar days following the Notice to Proceed. The contract will be awarded using the Lowest Price Technically Acceptable (LPTA) process. To be eligible, offerors must be rated as acceptable across three evaluation factors: construction experience, which requires at least one prime contract for a fuel facility valued at 1 billion JPY or 10 million USD within the last 20 years; system supplier subcontractor experience, requiring five projects completed within the last five years; and satisfactory past performance. Proposals are due by January 25, 2027. Key contractual requirements include adherence to EM 385-1-1 safety procedures, the implementation of a Three Phase Inspection process, and liquidated damages of 615,000 Yen per calendar day of delay. The project carries a priority rating of DO-C2.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 4 months

AI Contract Overview

Show more

The contract is for the construction of mechanically stabilized earth walls and an embankment stability berm to improve the safety and structural integrity of a dam. Work will focus on reinforcing the dam’s surrounding earth structures to mitigate risks related to erosion, settlement, or potential failure under stress. The project is classified under NAICS code 237120, which pertains to water and other pipeline construction, reflecting the civil infrastructure nature of the work. It is issued as a subcontract under the Great Plains Regional Office of the Department of the Interior, with performance expected to occur at an unspecified location under its jurisdiction. The solicitation was posted on April 24, 2026, and responses are due by May 29, 2026, at 11:00 PM Eastern Time. No set-aside type or description is specified, indicating the subcontract is open to general competition without preference for small businesses or other categories. The place of performance details are not provided, suggesting the specific site may be known only to qualified bidders upon request or during the pre-bid process. There is no designated point of contact listed in the public posting, and interested parties must access the full solicitation details through the provided SAM.gov link.

General Info

Subcontract for constructing MSE walls and berms to enhance dam safety, deadline May 29, 2026.

Agency

Department Of The Interior → Great Plains Regional OfficeView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

MT

Set-Aside

NONE

Documents

This scope was carved out of 140R6026R0004.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z--DK Heart Butte Dam Safety Modification

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Great Plains Regional Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Great Plains Regional Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of mechanically stabilized earth (MSE) walls and an embankment stability berm to enhance dam safety and structural integrity.

More opportunities from Department Of The Interior → Great Plains Regional Office

Same awarding agency

NAICS: 335311
Federal
61--UNITROL 6800-Exciter HMI & Firmware Upgrade
Solicitation # 140R6026Q0114
Solicitation 140R6026Q0114 is a request for quotes issued by the Bureau of Reclamation, Missouri Basin Regional Office, for the upgrade of six UNITROL 6800 Exciter Human Machine Interface (HMI) units and associated firmware. The project focuses on replacing obsolete terminals and migrating operating systems from Windows XP/7 to Windows 10 to improve reliability and ensure compliance with cybersecurity and regulatory standards, including NERC-CIP, NIST 800-53, ISA-99, and IEC 62443. The scope includes the procurement of ABB brand-name hardware, such as the ECT Panel Model TPC-1551Tb and specific software licenses, along with certified engineering services for installation, power-up support, and the recommissioning of the exciter to resolve a critical Power System Stabilizer firmware bug. This procurement is a total small business set-aside, requiring offerors to be actively registered in SAM.gov and to provide exact ABB brand-name products to be considered technically acceptable. The period of performance is scheduled from September 1, 2026, to March 1, 2027, with delivery set for March 1, 2027, at the Grand Coulee Dam facility in Washington. Award will be based on a comparative evaluation of technical and price factors to determine the most advantageous offer to the government. Contractors must adhere to strict safety protocols, including Grand Coulee Lockout/Tagout procedures, and utilize the Invoice Processing Platform (IPP) for electronic payments. Following several amendments, the final quote submission deadline was extended to September 14, 2026.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

16 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS