Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is implementing the Mt. Diablo Road and Trial Management Plan to repair eight drainage culverts at Mount Diablo State Park. The scope of work involves utilizing heavy equipment to backfill native soil for re-bedding existing culverts, restoring road access, and stabilizing streambanks. To mitigate erosion, six of the sites will receive armoring in specific sections, supplemented by soil bioengineering techniques such as hand seeding, planting bunchgrasses, and incorporating willow cuttings into the rock armoring. This project has been formally approved following a Notice of Determination, which certifies that the repairs and erosion control measures will not have a significant effect on the environment. The determination was approved on September 15, 2026, and signed on September 21, 2026. Diana Fong, the District Environmental Coordinator, serves as the primary point of contact for this initiative located in California.

General Info

California Department of Parks and Recreation repairing eight drainage culverts at Mount Diablo.

Agency

California Parks and Recreation, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Diana FongDistrict Environmental Coordinator

Full Description

Show more
Mount Diablo State Park staff shall repair eight (8) drainage culverts at Mount Diablo State Park. Repairs include using heavy equipment to backfill native soil to re-bed preexisting culverts, restoring road access, and/or stabilizing streambanks with heavy equipment. Six (6) sites will require armoring appropriate sections of each drainage to reduce erosion. Soil bioengineering including planting bunchgrasses, incorporating willow cuttings into rock armoring, and hand seeing will be utilized for erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS