Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

New and Unused. most current model, Electric Sit-Down Counterbalanced Forkilift

Closed
PR2702791State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
Federal
INDUSTRY DAY 2026 FA8534-2X-R-XXXX
Solicitation # FA8534-2X-R-XXXX
The Warner Robins Air Logistics Center, under AFLCMC/ROZ, is conducting market research and soliciting industry feedback to sustain the Halvorsen 25k Aircraft Cargo Loader system. This initiative involves a worldwide effort to support approximately 500 loaders across 170 locations. The scope of work encompasses four primary areas: overhaul, pipeline and material management, sustaining engineering, and repair. Key requirements include providing worldwide technical field support with strict response time thresholds, managing the supply chain for various components, and performing engineering analysis for system modifications, including cybersecurity risk assessments for Platform Information Technology and Operational Technology. The government is utilizing an Industry Day and a Sources Sought process to identify capable contractors with expertise in heavy-lift equipment and inventory management for globally dispersed fleets. Performance will be measured using specific metrics, including Not-Mission Capable for Supply rates, Logistics Response Time, and parts quality, with a bad parts threshold of no more than 0.5 percent. Contractors must adhere to rigorous quality management systems, Air Force Materiel Command packaging standards, and National Industrial Security Program Operating Manual guidelines for classified materials. Final inspection and acceptance of overhauled assets will be conducted at the origin by a Defense Contract Management Agency Quality Assurance Representative.
FA8534 Aflcmc Rokc

POSTED

about 23 hours ago

DEADLINE

in 22 days
NAICS: 333924
New
SLED
IFB Purchase of Forklift - Minimum 10,000 lb. Rated Capacity
Solicitation # 27-0011101
The Texas Facilities Commission is soliciting bids under solicitation number 27-0011101 for the procurement of one new current-production, diesel-powered, sit-down counterbalanced forklift designed for outdoor industrial material handling. The required unit must have a minimum rated capacity of 10,000 lbs at a 24-inch load center and a minimum lift height of 171 inches. Technical requirements include compliance with OSHA and ANSI safety standards, a general overhead guard for cab configuration, and an operator presence system. Bidders must provide a signed bid form with a lump-sum price, along with separate pricing for optional accessories such as safety lighting, cab guards, load scale systems, camera systems, telematics, and fleet management systems. Bids are due by November 13, 2026, at 2:00 p.m. via the OpenGov eProcurement Portal. To be considered, vendors must provide detailed technical documentation, including the make, model, serial number, voltage, and cab type of the proposed unit. A critical requirement is that the vendor must provide warranty and repair services through an authorized center with mobile repair capabilities located within 50 miles of Austin, Texas. Delivery will be made to State Surplus Property in Austin. Award evaluation is based on the ability to meet or exceed minimum performance requirements and the provision of standard and extended warranty terms.
Texas Facilities Commission

POSTED

4 days ago

DEADLINE

in 3 days
NAICS: 333924
New
SLED
Forklift Equipment - EPA Grant Funded
Solicitation # RFP-2026-0007
The Port of Stockton is soliciting proposals for the procurement of 20 new battery-electric forklifts funded by an EPA grant. The requirement includes seven 10,000 lb. capacity units, seven 28,000 lb. capacity units, four 36,000 lb. capacity units, and two 66,000 lb. capacity units. All equipment must be new, commercially available production models that meet IP68 ingress protection standards and comply with Build America, Buy America (BABA) provisions. Technical specifications require high-voltage traction systems between 200V and 700V using LFP or NMC battery technology with a minimum capacity of 120 kWh and CCS1 DC fast charging. The contractor must also provide a two-year full-service maintenance and support package, technical training for Port personnel, and data reporting capabilities for energy consumption and operating hours. Warranty requirements include 18 months or 2,000 hours for the machine, 36 months or 6,000 hours for the powertrain, and 84 months for high-voltage batteries. Proposals must be submitted by December 8, 2026, consisting of four hard copies, a USB drive with PDF and Word files, and a separate sealed cost proposal. Financial security is strictly mandated, requiring a bid guarantee of 5% of the bid price and performance and payment bonds for 100% of the contract price, issued by sureties listed in US Treasury Circular 570. The contract is subject to various federal regulations, including the Davis-Bacon Act, 2 CFR Part 200, and non-discrimination laws.
Port of Stockton

POSTED

4 days ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Kern County is soliciting bids for the procurement of one new and unused, most current model electric sit-down counterbalanced forklift. This solicitation, identified as PR2702791, is managed by the General Services Department and requires the delivery of the equipment to Bakersfield, California. Interested bidders must provide completed specifications along with their bid response, and the process includes requirements for vehicle registration and the submission of local vendor preference worksheets. Quotation responses must be submitted online via Public Purchase.com or delivered as sealed bids to Lionel Gonzalez at the Kern County Purchasing office by 11:00 a.m. PST on Wednesday, October 28, 2026. All late bids will be rejected without exception. Any inquiries regarding the product specifications must be submitted in writing to the primary point of contact at [email hidden] no later than Monday, October 26, 2026.

General Info

Kern County seeks bids for one electric sit-down forklift delivered to Bakersfield, California.

Documents

1
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Kern County
Office AddressN/A

Full Description

Show more
Interested bidders shall print, review, complete and return completed specifications with bid response. Quotation Responses may be submitted online through the bid posted on Public Purchase.com, or Sealed Bids delivered to: Kern County Purchasing Attn: Lionel Gonzalez 1115 Truxtun Avenue 3rd Floor GS Bakersfield, CA 93301 before 11:00:00 a.m., PST on Wednesday, October 28, 2026. The Quotation Request # "PR2702791 Delectric Forklift", must appear on the outside of the envelope. ALL LATE BIDS WILL BE REJECTED WITHOUT EXCEPTION !! Questions: Questions may be submitted in writing to contact@example.gov about the specifications of any products identified therein. Please submit all questions no later than Monday, October 26, 2026.

More opportunities from California → Kern County

Same awarding agency

NAICS: 236210
SLED
Airport Commerce Center Industrial Project by ACC Bakersfield JV, LLC.
Solicitation # PP24405
The Airport Commerce Center Industrial Project, managed by ACC Bakersfield JV, LLC and the Kern County Planning and Natural Resources Department, involves the development of approximately 110 acres of privately owned land in unincorporated Kern County, California. The project scope includes the construction of four industrial warehouse buildings totaling 1,505,440 square feet, which is divided into 625,446 square feet for warehousing, 393,624 square feet for cold storage, 335,826 square feet for food and beverage industrial manufacturing or assembly, and 150,544 square feet of office space. Additionally, the project will feature two quick-serve restaurants totaling approximately 9,410 square feet. To implement this development, several land use entitlements are required, including a General Plan Amendment to change 13.76 acres from General Commercial to Service Industrial, a Zone Classification Change for approximately 22.32 acres to Medium Industrial, and a Precise Development Plan. The project also includes the vacation of two drainage easements covering 10.24 acres. The development is subject to the California Environmental Quality Act and the Americans with Disabilities Act. Administrative oversight is provided by the Kern County Planning and Natural Resources Department, with key coordination handled by Nicole Menchaca.
Industrial Building Construction

POSTED

26 days ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Tentative Parcel Map 12666
Solicitation # PLD26-00002
Tentative Parcel Map 12666, identified by permit number PLD26-00002, authorizes the division of a 20,744.38 square foot net parcel located on the east side of Gilbert Street in the Lamont area of Kern County, California. The project divides the original land into two smaller parcels measuring 9,958.20 square feet and 10,786.18 square feet, both of which comply with the Metropolitan Bakersfield General Plan R-1 Low Density Residential zoning requirement of a minimum 6,000 square foot net lot size. Approved on August 11, 2026, the project is exempt under Section 15183 of the State CEQA Guidelines. Total fees paid for the permit amount to 5,438.00 dollars, covering costs for the tentative parcel map, map checking, electronic permit maintenance, and land development. The project is subject to several strict conditions of approval and regulatory obligations. Key deliverables include a final map in substantial conformance with the tentative map, a title guarantee, a Tax Collectors Certificate, and an Assessors Tax Estimate. Environmental and safety requirements mandate dust mitigation through soil spraying, restriction of grading to low-wind periods, and a 15 mph construction speed limit. Fire safety standards require automatic sprinklers for new residential construction and fire access roads meeting California Fire Code Section 503.2. Additionally, the applicant must coordinate with Underground Service Alert before excavation and adhere to specific noise restrictions to protect nearby residential dwellings. Discovery of archaeological resources or human remains requires an immediate halt to work and notification of the appropriate authorities.
Land Subdivision

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 221117
SLED
Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.
Solicitation # PP26401
The Euismod Energy Storage Project, managed by Euismod Project LLC and Euismod Project I, LLC under solicitation PLN25-00046, involves the development of a battery energy storage system (BESS) facility in southeastern Kern County, California. The project will utilize lithium-ion batteries to store approximately 1,150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid on a 120-acre site. Infrastructure includes battery energy storage arrays, collector substations, SCADA systems, microwave communications towers, O&M buildings, and SCE tie-line and substation infrastructure. The project requires several land-use entitlements from the Kern County Planning and Natural Resources Department, including a Zone Change Case, Conditional Use Permits, Zone Variance, and Nonsummary Street Vacations. The project is subject to rigorous environmental and safety standards, including compliance with the California Environmental Quality Act (CEQA), OSHA standards, and NFPA 70E for electrical work. Key operational requirements include the implementation of a Storm Water Pollution Prevention Plan (SWPPP) and adherence to NFPA 72 for fire alarm system testing. Construction is expected to employ approximately 150 onsite workers utilizing union labor with wages meeting or exceeding IRS prevailing wage standards. Environmental reviews have highlighted potential impacts on aesthetics, air quality, biological resources, and wildfire risks, while specific mandates are in place for the protection of tribal cultural resources and the handling of human remains according to State Health and Safety Code Section 7050.5.
Biomass Electric Power Generation

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Tentative Parcel Map 12560
Solicitation # PLD24-00004
Tentative Parcel Map 12560 involves the division of Parcel 1 of Parcel Map 12348, located on the south side of Rosamond Boulevard between 25th Street West and Acacia Street in the Rosamond area of Kern County, California. The project proposes to divide an approximate 9.18-acre gross parcel into four parcels ranging from 39,798 square feet net to 3.83 acres gross. The project is exempt under Section 15182 of the State CEQA Guidelines. Key deliverables include a final map in substantial conformance with the tentative map, recorded Covenants, Conditions and Restrictions for the private maintenance of the drainage basin, and will-serve letters from the Rosamond Community Services District for water and sewerage facilities. The project must comply with C-2 PD zoning and the Rosamond Specific Plan, requiring a minimum lot size of 7,500 square feet net. Fire safety standards require a fire flow of at least 1,500 GPM for two hours at 20 PSI residual pressure. Performance is subject to Kern County Development Standards and the Land Division Ordinance, with specific requirements for drive approaches on Rosamond Boulevard, 25th Street West, and Acacia Street. The Kern County Public Works Department is responsible for verifying compliance regarding dust mitigation, wind restrictions, and construction speed limits of 15 mph. Special requirements include immediate notification of the Kern County Coroner if human remains are found and the engagement of a qualified archaeologist if cultural resources are discovered. Approval expires three years from the date of issuance, and the project is managed by Sean Barger of the Kern County Planning and Natural Resources Department.
Land Subdivision

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS