Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Newcastle Arrow Route

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Newcastle Arrow Route project, solicitation number 2023110039, involves the demolition of existing non-operational industrial buildings and a surface parking lot at 12459 Arrow Route in Rancho Cucamonga, California. The scope of work includes the construction, operation, and maintenance of a 334,776 gross square foot concrete tilt-up industrial warehouse facility. This facility will feature 322,776 square feet of warehouse space, 12,000 square feet of office space, 44 loading dock doors, 149 automobile parking stalls, and 44 truck trailer parking stalls. The development will occupy a 14.8-acre site with 86 percent impervious coverage and is designed for general warehouse occupancy with potential 24/7 operations supporting approximately 258 daily employees. Construction is scheduled for a 12-month duration from March 2026 to March 2027, encompassing demolition, site clearing, grading, building construction, and paving. The project must comply with the California Environmental Quality Act and requires approval for a design review application, conditional use permit, and Master Plan. Key requirements include strict adherence to hazardous materials handling for asbestos, lead, and PCBs, the submission of a Soil Management Plan, and VOC compliance documentation. Additionally, the project must coordinate with the California Public Utilities Commission regarding rail crossing jurisdictions and potential mitigation for increased vehicular activity at the Etiwanda Avenue crossing.

General Info

Construction of a 334,776 square foot industrial warehouse in Rancho Cucamonga, California.

Agency

California → City of Rancho Cucamonga

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Arrow Route/Etiwanda Avenue, Rancho Cucamonga, CA, 91739

Set-Aside

NONE

Documents

(3)

CPUC Comment Letter on Newcastle Arrow Route Project SCH 2023110039

PDFcomment-letter

Newcastle Arrow Route Project Final Environmental Impact Report SCH No. 2023110039

PDFenvironmental-impact-report

Newcastle Arrow Route Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rancho Cucamonga
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Rancho Cucamonga
Office AddressN/A
Contacts
Sean McPhersonPrincipal Planner
Marlie LongEnvironmental Consultant
Courtney WingDevelopment Manager

Interested Companies (1)

Show more
Ascent Environmental
Sacramento, CA

Full Description

Show more
The proposed project involves demolition of the existing buildings and surface parking lot and the construction, operation, and maintenance of one concrete tilt-up industrial warehouse building (Type III-B construction) totaling approximately 334,776 gross sq ft of building floor area comprised of 322,776 sq ft of warehouse space, 6,000 sq ft of ground floor office space, and 6,000 sq ft of mezzanine office space. The total footprint of the proposed building would be 328,776 sq ft. In total, the 14.8-acre project site would be developed with approximately 12.7 acres of impervious surface, which results in 86 percent impervious coverage. Approximately 2.1 acres of the project site (approximately 14 percent) would be developed with landscaping and other pervious surface area. The building would be supported by a slab-on-grade foundation and would include 44 loading dock doors. The proposed project would meet the parking requirements of the Rancho Cucamonga Municipal Code (Chapter 17.64, Parking and Loading Standards; 17.64.100 D.1, Trailer Parking Required) by providing 149 automobile parking stalls and 44 truck trailer parking stalls. Of the total automobile parking stalls, 19 stalls would be EV Capable, and 6 stalls would be EV Ready (as defined by the California Green Building Standards Code). In addition, one of the truck trailer parking stalls would meet EV Capable requirements. The project site would be surrounded by security fencing with two gated access points at the northeast and northwest corners of the property. The proposed project would also include the creation of a new internal vehicle circulation system, exterior lighting and signage, and landscape areas. Construction of the proposed project would occur over approximately 12 months anticipated to begin in March 2026 and end in March 2027. Construction activities associated with the proposed project would occur in the following stages: demolition and site clearing, grading and excavation, building construction and infrastructure improvements, architectural coatings, and paving. No pile driving would be performed. Construction activities would be anticipated to occur between 6:00 a.m. and 6:00 p.m., Monday through Friday. Grading would be balanced onsite and would involve approximately 25,000 cubic yards of cut and 25,000 cubic yards of fill. Up to 14.3 acres of the proposed project site could be disturbed on a daily basis during construction. Approximately 165 tons of debris would be exported off-site during construction of the proposed project. The proposed project would involve grading and excavating site soils to depths up to 5 feet below existing grade. The type of tenant that would occupy the proposed building and the resulting business activities that would be conducted are not known at this time. For the purpose of evaluating the proposed project’s environmental effects in the EIR, the proposed building is assumed to be used as a warehouse distribution facility (i.e., general warehouse occupancy). The proposed project assumes that cold storage would not be included. It is assumed that operations could occur on a 24-hour, 7-day-per-week, basis. Proposed project operations are anticipated to commence in 2027. Based on industry average, the proposed project is anticipated to accommodate approximately 258 employees daily. The proposed project requires the approval of its design review application, conditional use permit (CUP), and Master Plan application from the City.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS