NON- federal,,, drainage issue
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves addressing critical drainage issues in Poteau, Oklahoma, under the Choctaw Nation Housing Authority, with work focused on the area around Summerfield Ln, Curtis Ln, and Williams St. Key tasks include removing the existing culvert at the end of Summerfield Ln and installing a minimum 24-inch diameter culvert, followed by cutting out and repouring concrete to meet city standards. Earthwork extends from approximately 10 feet north of Summerfield Ln along a drainage corridor between the LEAP site and the new development, requiring excavation, reshaping, and grading to ensure positive southward drainage toward Williams Ln. The ditch must be widened to approximately six feet, with adjacent areas graded to allow for mowing with a push mower. All rocks, metal, trash, and debris must be removed from the work area. Grass must be trimmed within ten feet of the fence at unit 219 on Curtis Ln, and trees and vegetation must be cleared five feet from Curtis Ln on the adjacent empty lot. At Williams St, the culvert will be removed and replaced with a properly sized unit, and the ditch running from nearby rental properties to the train tracks must be cleaned and graded to eliminate standing water and ensure reliable drainage to the tracks. All work must comply with the 2019 International Residential Code, and the contractor is responsible for securing all necessary permits and line locates. A mandatory site visit is required prior to bidding, and no change orders will be approved for conditions that could have been observed during this visit. The contractor must perform complete site cleanup, remove all debris and waste, and restore the yard to a mowable condition. The property manager, Leslie James, retains authority to select all colors used in the project and will oversee final approval. The contractor must independently verify all measurements and material quantities needed. Bids are due by August 18, 2026, and all inquiries should be directed to the Choctaw Nation Housing Authority Procurement Team. Inspections and compliance oversight will be conducted by Phillip Hotella.
General Info
Agency
NAICS
Place of Performance
Poteau, OK, 74953, USSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Concrete: Cut out the road at the end of Summerfield Ln remove the existing culvert, and install a min. 24-in diameter culvert. Install new rebar and pour concrete to city requirements.
Earth Work: Starting approximately 10 feet north of Summerfield Ln, on the east end excavate and reshape the drainage ditch/corridor running north and south between the existing LEAP site and the new development. Grade the ditch to provide positive drainage south to Williams Ln. Make the ditch approx. 6ft wide, starting from Summerfield Rd and going to Williams St. on the side of the street that is closest to the new site grade the area between the road and the fence to be mowable with a push mower. Will need to remove all rocks, metal, trash, and debris from the area. Cut the grass approx. 10 ft around the fence of unit 219 on Curtis Ln. and cut all trees, grass aprox. 5' away from Curtis Ln on the empty lot next to 219 Curtis Ln. Remove and replace the culvert by Williams St. at the end of the road where the drainage ditches were cleared. Install a new culvert the correct size. Clean out the ditch next to Williams St, going from the rental properties to the train tracks. Grade the ditch to provide positive drainage to the train tracks, with no standing water.
Special Instructions: All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Property manager- Leslie James at 580-372-3721. Inspector- Phillip Hotella at 580-579-5100. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements and count of materials needed.