Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

--NOTICE OF INTENT TO AWARD SOLE-SOURCE PROCUREMENT

Active
W81XWH-08-P-0991Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the procurement and installation of a heavy-duty steel pallet rack at the Hill Air Force Maintenance Depot, specifically within the USA Medical Material Agency location at Hill Air Force Base, Utah. This project requires a side-by-side installation alongside an existing pallet rack system procured from Pro Lift in 2005. The key aspect of this procurement is ensuring seamless integration with the existing structure, including matching the special foot plates and heavy-duty steel reinforcements that meet zone three seismic standards. The design must maintain architectural continuity and preserve the structural integrity and load-bearing capacity of the combined rack system. Pro Lift is uniquely qualified to perform this work due to their prior involvement and engineering knowledge of the existing rack system, which is critical for maintaining compatibility and ensuring that stress load requirements remain uncompromised during and after installation. The procurement process is constrained by the absence of detailed drawings and architectural specifications, limiting competition and justifying a sole-source award to Pro Lift. This installation is considered an expansion of the existing rack system, and future pallet rack requirements are expected to be standalone units with separate procurement competitions.

General Info

Procurement and installation of heavy-duty steel pallet rack expanding existing Pro Lift system at Hill AFB.

Agency

N/A

NAICS

444190 - Other Building Material Dealers

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement is for a furnish-and-install package to erect a steel heavy-duty pallet rack at the Hill Air Force Maintenance Depot, USA Medical Material Agency, MCMR-MMM-DU, 6149 Wardleigh Road, Building 1160, Bay 1, Hill Air Force Base, UT 84056-5848. This new procurement is a side-by-side installation with an existing pallet rack procurement from Pro Lift. To achieve engineering continuity and for preventive maintenance purposes, the new pallet rack needs to tie in with the existing unit, with equivalent special foot plates and corresponding heavy-duty steel reinforcements that comply with zone three seismic requirements. The new rack procurement needs to complement the existing rack by having the new steel beams structurally intersect and interchange exactly with the existing steel beams, maintaining and complementing the existing architectural configuration without compromising the pounds per square inch capability. Pro Lift is able to provide the engineering continuity during the erection process that can not be provided by others, as well as ensure the compatibility of the new and existing rack system and guarantee that stress load requirements will not be abridged during or after erection. In the absence of drawings and precise architectural specifications, the ability to compete this procurement is limited inasmuch as it is a side-by-side installation, an expansion of the current pallet rack in which the new pallets are interconnected with the existing structure, which was erected by Pro-Lift in 2005. After fulfillment of the current procurement, it is anticipated that upcoming rack requirements will be competed, since spatial configuration requires future pallet racks be erected as stand alone units.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS