This Solicitation opportunity from Florida was posted on April 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NW Volucia Dr. Sidewalk Project

Closed
20250199State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental services like storm water pollution prevention, the installation of utilities, manholes, traffic signals, lighting, and landscaping, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Citywide Accessibility Improvements No. 13
Solicitation # PJ2817
The Citywide Accessibility Improvements No. 13 project, solicitation PJ2817, is an Invitation For Bid issued by the City of Concord Community Development Department for accessibility upgrades at various locations within the city. The scope of work encompasses comprehensive site preparation, including mobilization, traffic and water pollution control, and clearing and grubbing. Key civil engineering tasks include earthwork, pavement and landscape grading, and the installation of concrete curbs, curb ramps, and sidewalks. Additional requirements include the pruning and removal of tree roots, adjusting utility covers, and the replacement of traffic striping and pavement markings. All work must adhere to City of Concord and Caltrans standard plans and specifications. The project is expected to begin around February 2027 and must be fully completed within 25 days from the Notice to Proceed. Bidders must be responsible entities possessing the required California contractor licenses and must obtain a City business license within 10 days of a potential award. The contract requires strict adherence to federal prevailing wages under the Davis-Bacon Act and compliance with Executive Order 11246 regarding nondiscrimination. For contracts exceeding 1,000,000 dollars, bidders must certify they are not identified under the Iran Contracting Act. Awarded contractors must provide payment and performance bonds equal to 100 percent of the contract price. Technical standards include specific compaction requirements for Asphalt Concrete Type A and the use of PG 64-10 asphalt binder.
Community Development - Engineering

POSTED

about 9 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
SB Minor B 03A4243 - Bicycle Railing Installation - Placer County
Solicitation # 03A4243
The California Department of Transportation is soliciting bids for contract 03A4243, which involves the installation of bicycle railings at the Maple Street Overcrossing on Route 80 in Auburn, Placer County. This is a Small Business Minor B set-aside project with an estimated cost of $253,000.00. The contract will be awarded to the lowest responsible bidder who is a certified small business at the time of bid opening and award. The project must be completed within 20 working days, and the scope includes the implementation of temporary traffic control systems and the installation of traffic stripe tape meeting specific retroreflectivity and durability standards. Bids must be submitted via email to [email hidden] by November 12, 2026, and any bid exceeding $484,000.00 will be rejected. While no specific DVBE goal is established, participation is encouraged. The successful bidder will be required to provide a payment bond if the bid exceeds $25,000, along with certificates of insurance, a Payee Data Record, and Postconsumer-Content Certification. All construction materials must comply with Build America Buy America standards under 2 CFR 184.6. Payment for contracts of 20 working days or less is made after contract acceptance, while longer contracts allow for progress payments via itemized invoices.
California Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
SLED
SB Minor B-Install passageway for emergency vehicles-San Diego County
Solicitation # 11A4469
The California Department of Transportation is soliciting bids for contract 11A4469 to install a passageway for emergency vehicles in San Diego County. This is a Small Business Minor B set-aside, requiring bidders to be certified as a small business by the Department of General Services by 5:00 p.m. on the bid opening date. The scope of work includes traffic control, electrical system installation for detectors, environmental controls such as temporary water pollution and concrete washout facilities, and the installation of signage and pavement markings. The project is governed by 2025 Standard Specifications and Standard Plans, with specific requirements for Buy America compliance and strict quality standards for local materials, including pH and lead concentration limits. Bids must be submitted exclusively via email to [email hidden] by November 12, 2026, as hard copies will not be accepted. Any bid exceeding 484,000.00 dollars will be rejected per Public Contract Code 10105(b). The contract will be awarded to the lowest responsible bidder within 30 days of the bid opening. Successful awardees must provide payment bonds and insurance at the time of award and complete the Payee Data Record and Standard Agreement forms. Payment terms vary based on project duration, with progress payments available for contracts exceeding 20 working days, provided the work meets specifications and the value exceeds 5,000 dollars.
California Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 14 days

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

16

20250199 Attachment A - Construction Plans for NW Volucia Trail Sidewalk Project

PDF, High priority: read this firstconstruction-plans
High

Attachment G - Federal Compliance with Required Contract Provisions

PDF, High priority: read this firstfederal-compliance-provisions
High

NW Volucia Dr. Sidewalk Project IFB 20250199

PDF, High priority: read this firstifb
High

20250199 Attachment I - Whistleblower Poster

PDF, Low priorityspecial-notice
Low

20250199_Attachment_B_-_Technical_Specifications_for_NW_Volucia_Trail_including_FDOT_Div_1_3-27-2026.pdf

PDF

20250199_Attachment_C_-_Survey_scanned_verision.pdf

PDF

20250199_Attachment_D_-_Federal_Reqired_Contract_Provisions.pdf

PDF

20250199_Attachment_E_-_FHWA_1273.pdf

PDF

20250199_Attachment_F_-_Davis_Bacon_Information.pdf

PDF

20250199_Attachment_H-Approved_Sample_Contract_clean_ABL_3-27-2026.pdf

PDF

20250199_Attachment_J_-_FM450861-1-58-01_Volucia_Sidewalk_LAP_Agreement_City_Authorized_1-22-26.pdf

PDF

2025-05-30_NW_Volucia_Trail_-_Civil_Plans.pdf

PDF

2025-05-30_NW_Volucia_Trail_-_Specifications_Package.pdf

PDF

2025-05-30_NW_Volucia_Trail_-_Survey_-_ss.pdf

PDF

Attachment_X-_Sample_Contract_-FDOT.docx

DOCX

NW Volucia Dr_ Sidewalk Project.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficePort St. Lucie, FL, 34984, USA
Organization / AgencyFlorida → Public Works
Office AddressPort St. Lucie, FL, 34984, USA
Contacts
Emily SeitterCapital Improvement Projects Administrator
Robyn HolderSr. Procurement Contracting Officer

Interested Companies (37)

Heavy CivilBoca Raton, FL
RJ Engineering ConstructionLake Worth, FL
GRSCStuart, FL

See All 37 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The NW Volusia Drive Sidewalk Construction Project location is between NW East Torino Parkway and West Blanton Boulevard. This project is funded through the Florida Department of Transportation (FDOT) Local Agency Program (LAP).

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids under solicitation 2709ITB for the as-needed printing, fabrication, finishing, packaging, and delivery of various large-format signage, including vertical and horizontal pole banners, event banners, facility banners, and yard signs. This is a production and delivery only contract; installation, removal, permitting, and maintenance are specifically excluded. All vertical pole banners must be fabricated from heavy-duty vinyl with a minimum weight of 18 ounces and feature full-color double-sided printing and 3-inch pole pockets. Completed products must be delivered to the City of Daytona Beach Public Works facility at 950 Bellevue Ave. Bids must be submitted electronically via the OpenGov platform by November 19, 2026. The award will be granted to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the Base Bid pricing proposal. Qualified bidders must have maintained a successful operation for at least three years and possess the necessary organizational capacity and equipment. Submission requirements include a bid security deposit equal to 10 percent of the bid and a performance security bond equal to 100 percent of the contract price. The City provides a discretionary preference for local vendors and requires compliance with E-Verify and drug-free workplace certifications.
Sign Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
SLED
SILVER RIDGE WATER MAIN REPLACEMENT
Solicitation # ITB 27-PW-03
The City of Edgewater, Florida, is soliciting sealed bids under ITB 27-PW-03 for the Silver Ridge Water Main Replacement project. This infrastructure initiative aims to replace aging and undersized 2-inch galvanized iron potable water mains with new 3-inch and 8-inch DR-11 PE water mains to improve system reliability, pressure, and fire protection. The scope of work includes the installation of 1,090 linear feet of open-cut 3-inch main, 150 linear feet of directionally drilled 3-inch main, and approximately 180 linear feet of 8-inch main to create a system loop from Silver Circle to Glenwood Drive. Additional requirements include the relocation of one fire hydrant, capping and abandoning existing lines, and full site restoration. The engineer's estimate for the project is 415,950 dollars. The contract will be awarded to the lowest, compliant, and qualified bidder, with evaluations considering financial stability, past performance, and the technical capacity of the bidder. Qualified contractors must be licensed in Florida and provide key personnel with at least three years of experience in horizontal directional drilling. The project timeline requires work to commence within 30 calendar days of the Notice to Proceed, with completion within 210 calendar days and final payment readiness within 240 calendar days. Bidders must submit their proposals electronically via the City's e-Procurement Portal by 10:00 am on November 10, 2026. Required documentation includes a bid bond, performance and payment bonds, a Trench Safety Affidavit, and evidence of E-Verify compliance.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
Solicitation # IFB27-0003
The City of Orlando is soliciting bids for the Virginia Drive, Forest Drive, and Corrine Drive Complete Streets Project (IFB27-0003), a roadway and pedestrian improvement initiative spanning approximately 2.6 miles between State Road 527 (Orange Avenue) and Bennett Road. The project scope includes extensive civil works such as clearing and grubbing, the removal of over 10,000 square yards of existing concrete, and the installation of drainage, lighting, signalization, and signing and pavement markings. Additionally, the project incorporates technical landscape design and the implementation of ADA-compliant paths of travel. The engineer's estimate for the project is 26,089,582.31 dollars. Bids must be submitted electronically via the OpenGov portal by 2:00 pm local time on November 19, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Successful contractors must provide performance and payment bonds totaling 100 percent of the contract amount, as well as required certificates of insurance, within two weeks of the notification of intended award. The project timeline allows for substantial completion within 1,095 days and final completion within 1,130 days from the start of contract time, with a mobilization requirement of 10 calendar days following the Notice to Proceed. Compliance requirements are stringent, including adherence to the Davis-Bacon Act for wages, Equal Employment Opportunity standards, and the Build America, Buy America Act for sourcing steel and iron. Contractors are required to submit weekly certified payrolls and monthly applications for payment. Quality assurance is managed through a required Contractor Quality Control Plan, with final acceptance of work performed by the engineer. All excavations must conform to the Trench Safety Act, and storm pipeline installations are subject to TV inspection by the City.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Lower Spring Branch Stormwater Improvements
Solicitation # 14-0048-EN
The Lower Spring Branch Stormwater Improvements project, solicitation number 14-0048-EN, is a construction effort by the City of Clearwater, Florida, aimed at flood reduction. The scope of work includes the replacement of bridges on Springtime Avenue and Overbrook Avenue, as well as the installation of a double concrete box culvert on Douglas Avenue. The project is estimated at 5 million dollars and must be completed within 548 consecutive calendar days. Technical requirements are governed by the latest Florida Department of Transportation Standard Specifications for Road and Bridge Construction, with additional supplemental specifications for materials such as insert valves and fiber optic cabling. The contract will be awarded to the lowest responsible and responsive bidder. Bidders are required to provide a bid security equal to 10 percent of their maximum bid price and must furnish payment and performance bonds upon award. Mandatory submissions include current state of Florida and Pinellas County licenses, an E-Verify form, and a Scrutinized Companies and Business Operations with Cuba and Syria Certification Form. The project also requires adherence to strict safety and environmental standards, including the Florida Trench Safety Act, OSHA provisions, and USACE Nationwide Permit 14 for aquatic resource impacts. Final acceptance of the work, including pavement and precast elements, is subject to the approval of the design engineer and county inspector.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Annual Limited Width (Strip) Milling and Resurfacing
Solicitation # ITB 27-120-LC
Alachua County, Florida, has issued solicitation ITB 27-120-LC for as-needed limited width strip milling and resurfacing on select County Roads. The scope of work requires the contractor to provide all labor, materials, and equipment to mill travel lane sections up to 1.5 inches deep and replace them with specified asphaltic concrete, including types SP-9.5, SP-12.5, FC-9.5, and FC-12.5. Additional requirements include pothole repair leveling courses and the implementation of maintenance of traffic controls adhering to FDOT indices. The contract will be awarded to the lowest responsive and responsible vendor based on an evaluation of their financial ability, legal licensing, and performance qualifications. The initial term of performance is scheduled from October 1, 2026, through September 30, 2027, with the County holding the option to renew for two additional one-year periods. Bids must be submitted via the County Public Portal by 2:00 pm EST on November 25, 2026, and must include a bid bond for at least 5 percent of the bid amount. Payments are processed monthly in accordance with the Local Government Prompt Payment Act and are subject to annual appropriation by the Board of County Commissioners. Notable contract terms include an annual price escalation cap of 3 percent based on the National Highway Construction Cost Index and a 15 percent Small Business Enterprise participation goal, with specific bid price preferences available for certified SBEs.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 238910
New
SLED
ITB# RS-27-01 Demolition of Potters Park Concessions and Restroom Building in Redevelopment Area
Solicitation # ITB# RS-27-01
The Town of Davie, Florida, has issued Invitation to Bid ITB# RS-27-01 for the demolition and disposal of the Potters Park Concessions and Restroom Building located at 4250 SW 57th Terrace. The project scope includes the complete removal of the building structure, contents, concrete foundations, slabs, ramps, sidewalks, and the existing septic tank, as well as site restoration involving fine grading, topsoil application, and hydroseeding. Notably, the electrical building and its adjacent sidewalks are excluded from demolition. A pre-demolition asbestos survey conducted in September 2025 found no detectable quantities of asbestos, though contractors must still adhere to OSHA safety standards and use appropriate protective equipment. The contract has an estimated budget of 35,000 dollars and requires the successful bidder to hold a General Contractor's license. The performance timeline consists of a 30-day period to obtain necessary permits, followed by 45 calendar days to reach substantial completion and 15 days for final completion. Bids must be submitted electronically via the Town's e-Procurement portal by November 3, 2026, at 2:00 pm. Award preference is given to the lowest responsive bidder, with a 2.5 percent evaluation credit provided to local Broward County vendors. The contract mandates firm and fixed pricing, requires performance and payment bonds, and stipulates that the Town may terminate the agreement without cause upon 30 days' written notice.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS