Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ornamental Gate Supply and Installation (Option A)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the supply and installation of two flat top, flush bottom ornamental aluminum gates designed to precisely match the existing fence style, ensuring visual consistency across the property. The scope includes all necessary hardware, structural supports, and seamless integration with the entrance design to maintain both aesthetic appeal and functional integrity. The work must meet exacting standards for material quality, craftsmanship, and alignment with the surrounding architectural elements. This is a subcontract opportunity under NAICS code 238990, posted by the Vermont office of the Department of Economic Development, with a response deadline of August 7, 2026. Bidders must be prepared to deliver and install the gates in accordance with specified design requirements, providing all components needed for a durable, low-maintenance, and visually cohesive entrance feature. The absence of detailed location data suggests the site is known to qualified respondents, and the project is likely tied to a state-managed facility or development initiative under the agency’s purview.

General Info

Supply and install two ornamental aluminum gates matching existing fence, meeting strict aesthetic and durability standards by August 7, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73962.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Aluminum Ornamental Fence Installation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of two flat top, flush bottom ornamental aluminum gates matching the fence style, including hardware, structural supports, and integration with entrance design.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 485991
New
SLED
RFP_FSD_Transportation_9.11.26
Solicitation # FSD-Transportation-9.11.26
The Vermont Agency of Human Services, Department for Children and Families (DCF), Family Services Division (FSD) is seeking to establish contracts with one or more providers to deliver standard transportation and supported family time services for children and youth in state custody. These services include transporting individuals to schools, appointments, and meetings, as well as providing a safe environment for supervised visitation with non-custodial parents. While services are required statewide and potentially out-of-state, there is a specific need for contractors in the Bennington, Brattleboro, and Springfield districts. The period of performance is scheduled to run from January 1, 2027, through December 31, 2031, with the possibility of three additional one-year extensions. Awards will be made based on the best interest of the State, with preference given to resident bidders and those utilizing clean energy practices. Evaluation criteria include the bidder's project approach, qualifications, cost, and specific experience over the last five years in transportation and supported family time services. Contractors must ensure all vehicles meet Vermont inspection standards and provide service availability 24 hours a day, seven days a week. Payment terms are set at Net 30 days following the submission of detailed monthly invoices. The contract includes strict compliance requirements regarding non-discrimination, the disclosure of organizational and personal conflicts of interest, and specific worker classification reporting for bids exceeding 250,000 dollars.
Special Needs Transportation

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS