Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

PD30045065 - UT - REPLACE - POTABLE WATER LINE - FALLBR-PW-SA-MAIN - CNIC

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project, managed by Navfac Southwest for the Department of the Navy, involves the critical replacement of approximately 1500 linear feet of potable water main and associated laterals on Sparrow Road at Fallbrook. The scope of work includes replacing shut off valves on both the main and lateral lines to serve buildings 1, 3, 5, and 315. This initiative follows a 2024 water study by Michael Baker that identified multiple leaks in the main operating area, leaving building 1 currently dependent on a fire hydrant for its potable water supply. The primary objective is to mitigate the risk of total water loss to several buildings, which would result in adverse working conditions for tenants and further degradation of the water system. Classified under NAICS code 237110, this forecast addresses urgent infrastructure failures to ensure the reliable delivery of potable water across the affected facilities.

General Info

Navfac Southwest will replace 1500 feet of potable water mains at Fallbrook.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fallbrook's water main near building 1 has experienced several water leaks over the years. Several water leaks in the main operating area were identified during the Michael Baker water study in 2024 which includes building 3, building, 5, and building 315.The requirement of this project is to replace approximately 1500 LF of the water main and the lateral that feeds B1, B5, B3, and B315 located on Sparrow Rd. This project will also include the replacement of the shut off valves on the water main and shut off valves on lateral lines. Currently B1 potable water is being feed from a fire hose that's connected to a fire hydrant . The recent water study conducted at Fallbrook in 2024 identified multiple water leaks in the main operating area that needs to be repaired. Without this project several buildings at Fallbrook will be impacted and face the risk of not having potable water delivered to their building which will cause tenants to experience adverse working conditions and cause further damage to the water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in about 18 hours
View Details

More opportunities from Department Of The Navy → Navfac Southwest

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS