Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on November 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PIP-II Cryogenic Distribution System - Distribution Valve Box

Closed
374689-DSFFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332420
New
SLED
2026 Fuel Tanks
Solicitation # 2026-31
The Washington County Board of Commissioners in Georgia is soliciting bids for a complete, code-compliant bulk fuel storage and dispensing system for an on-site facility. The project requires the supply and delivery of two 10,000-gallon UL-2085 fire-rated, double-wall aboveground storage tanks, one for gasoline and one for ultra-low-sulfur diesel. The scope of work includes all necessary piping, fittings, valves, emergency shutoffs, and a keyed fuel control and tracking system featuring software and reporting capabilities. All equipment must be new, include manufacturer certifications, and comply with NFPA 30/30A, EPA 40 CFR Part 112 (SPCC), and local fire codes, with meters being NTEP certified for commercial use. Bids must be submitted in writing by December 14, 2026, and will be evaluated primarily on total evaluated price, with high importance placed on delivery lead time and medium importance on warranty, service, and vendor experience. Contractors must provide a minimum 60-day quote validity period and evidence of three recent comparable installations. Required documentation includes an E-Verify Affidavit, a SAVE Affidavit, and a Certificate of Insurance listing the Washington County BOC as an additional insured, with minimum liability limits of $1,000,000 per occurrence. The contract allows the County to terminate the agreement with 10 days' written notice and requires the contractor to repair or replace defective workmanship for one year following final completion.
Washington County Board of Commissioners

POSTED

4 days ago

DEADLINE

in 27 days
NAICS: 332420
New
Federal
Storage Tank AND SUPPLIES - FORT BRAGG
Solicitation # W911S227U0178
Solicitation W911S227U0178 is a Request for Quotation for the procurement of new commercial equipment and supplies to support Fort Bragg. This acquisition is a Total Small Business Set-Aside and requires the delivery of a 6000 gallon Norwesco white vertical storage tank, along with associated hardware including a Hayward bulkhead tank fitting, Kuriyama acid/chemical and DEF UHMWPE tubing, AMT pumps, and various stainless steel pipe nipples and fittings. The government will award the contract to the responsible offeror whose proposal is most advantageous based on price and technical evaluations. Only new equipment is acceptable, and used or remanufactured products will be rejected. Offers must be submitted exclusively through the PIEE Solicitation module and must include technical and price proposals, as well as a completed certification of the country of origin. While the solicitation is brand name or equal, any proposed equal products must meet all specified salient physical, functional, or performance characteristics and be supported by descriptive literature. Delivery is required on an F.O.B. destination basis, with a preferred delivery timeline of within 30 days. Compliance with various federal regulations is mandatory, including Buy American standards, sustainable product requirements, and specific cybersecurity and telecommunications prohibitions.
W6QM Micc-Ft Drum

POSTED

5 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) to support the Proton Improvement Plan II (PIP-II) project at Fermilab, which aims to upgrade the accelerator complex to produce the world's most intense high-energy neutrino beam for the Deep Underground Neutrino Experiment. The DVB is a critical subsystem within the Cryogenic Distribution System, responsible for regulating helium flow in the superconducting RF linac. The procurement process is conducted through a negotiated Request for Proposal (RFP) issued by Fermi Forward Discovery Group, LLC, a DOE contractor, with proposals due by late November 2025. The solicitation emphasizes a best-value trade-off approach, where non-cost factors such as technical capability, past performance, and management approach are significantly more important than price alone. The contractual framework includes detailed technical and quality requirements, with key documents such as the Statement of Work, technical drawings, and specifications outlining the scope, performance criteria, and inspection procedures. The work must pass both factory acceptance testing and on-site acceptance at Fermilab, with responsibilities clearly divided between the contractor and Fermilab personnel. The contract incorporates standard terms and conditions, including provisions for government property management, liability limitations, insurance, and compliance with federal acquisition regulations. Offerors are required to submit comprehensive technical proposals, certifications, and certifications of representations and certifications, including small business status and regulatory compliance, with specific instructions on proposal formatting, submission deadlines, and evaluation criteria. The overall emphasis is on delivering a high-quality, reliable cryogenic component within a defined schedule, ensuring seamless integration into the upgraded accelerator infrastructure.

General Info

NAICS

332420 - Metal Tank (Heavy Gauge) Manufacturing

Place of Performance

IL

Set-Aside

NONE

Documents

12
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first81 pages · sow
High
PDF, High priority: read this first11 pages · rfp
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstcontract-document
High
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · other
Low
PDF, Low priority12 pages · other
Low
PDF, Low priority6 pages · other
Low
PDF, Low priority20 pages · contract-document
Low
PDF

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • TS-405 VesselOpen now, due in 2 days
  • Forging Tooling ProductionOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 21, 2025 to Nov 21, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 21, 2025 to Nov 28, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) in support of the Proton Improvement Plan II (PIP-II) project. PIP-II is an upgrade to FNAL’s accelerator complex that will provide the world’s most intense high-energy neutrino beam for the Deep Underground Neutrino Experiment (DUNE). The PIP-II accelerator (Linac) employs superconducting radio frequency  technology across multiple cryomodules and relies on a Cryogenic Distribution System (CDS) for helium supply and return. The Distribution Valve Box serves as a key subsystem of the CDS, regulating and controlling helium flow within the PIP-II Linac.


Proposals can be submitted directly to the Primary Contact listed on this Solicitation Notice and within the RFP Document.


October 29, 2025 - Edited SAM.GOV posting to the correct proposal due date from 12/21/25 to 11/21/25 in alignment with the RFP. All RFP Documents remain unchanged.


Amendment 1 - Extends the RFP Question Submission deadline from November 3, 2025 to November 5, 2025.


Amendment 2 - Extends the due date for proposals from November 21, 2025 to November 28, 2025. Amendment 2 also adds responses to questions submitted by potential offerors during the Question and Answer period.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332999
New
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group, LLC for the U.S. Department of Energy, is soliciting proposals for the procurement of two solenoid magnets with integrated dipole correctors. This solicitation, number 389116swk, utilizes a best value trade-off source selection process where technical capabilities, infrastructure, and past experience are weighted as significantly more important than price. Proposals are due by 5pm Central on December 9, 2026, with a deadline for questions set for November 30, 2026. The selected subcontractor must provide a detailed Gantt chart, evidence of in-house manufacturing and magnetic testing capabilities, and a history of three similar contracts completed within the last five years. The scope of work requires strict adherence to ASME B31.3 welding and brazing standards and FNAL guidelines. Key deliverables include the hardware and associated material certifications for copper, epoxy, and steel. Acceptance is contingent upon Factory Acceptance Tests conducted at the subcontractor's facility, with specific requirements for field homogeneity and pressure testing. Shipping must be F.O.B. Fermilab in a single batch, utilizing crates equipped with irreversible shock indicators recording loads exceeding 10 G. All units must feature unique serial numbers and specific lead markings to ensure traceability and correct polarity.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Building pump room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. All work must be completed within 180 calendar days from the Notice-to-Proceed. The contract is a firm-fixed price award based on a lowest price-technically acceptable selection process. Technical requirements mandate compliance with ASME B31.3, ASME B31.9, and specific Fermilab Environmental, Health & Safety Manual (FESHM) standards for piping and pressure testing. Bidders must demonstrate at least ten years of business experience or ensure key personnel, specifically the superintendent and project manager, possess ten years of relevant experience. Proposals must be submitted in two separate volumes: a technical proposal and a business/price proposal. Strict site access and safety protocols are in effect, requiring U.S. citizenship, a REAL ID, and an access request submitted seven days in advance for site visits. The contractor must provide performance and payment bonds, maintain comprehensive construction insurance, and adhere to the Davis-Bacon Act for wages and the Buy American Act for materials. Quality assurance is managed through a project-specific QC plan, with final acceptance contingent upon successful hydrostatic pressure testing and commissioning of the pump room circuit witnessed by Fermilab representatives.

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237130
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Fermi Forward Discovery Group, LLC is soliciting proposals for the reconstruction and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price subcontract involves comprehensive demolition, building expansion, and the installation of low and medium voltage power systems, including 345kV substation yard equipment and a new prefabricated control house. The project is subject to a critical schedule constraint tied to the Fermilab accelerator shutdown, with on-site construction anticipated to occur between January 1, 2028, and January 1, 2030, with a final project completion deadline of September 30, 2029. The selection process utilizes a best-value tradeoff method where technical factors, including organizational structure, safety compliance, and past performance on high-voltage substation projects, are significantly more important than price. Offerors must meet strict pass/fail thresholds regarding financial capability, such as a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars, as well as rigorous safety performance metrics. The contract mandates compliance with the Davis-Bacon Act for prevailing wages, various FAR and DEAR flow-down provisions, and specific federal anti-discrimination laws. Key milestones include the completion of submittals within 60 days of the Notice to Proceed and the formal issuance of the Authorization for Use and Possession by July 2, 2029.
Power and Communication Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS