This Solicitation opportunity from Department Of Energy was posted on November 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PIP-II Cryogenic Distribution System - Distribution Valve Box
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) to support the Proton Improvement Plan II (PIP-II) project at Fermilab, which aims to upgrade the accelerator complex to produce the world's most intense high-energy neutrino beam for the Deep Underground Neutrino Experiment. The DVB is a critical subsystem within the Cryogenic Distribution System, responsible for regulating helium flow in the superconducting RF linac. The procurement process is conducted through a negotiated Request for Proposal (RFP) issued by Fermi Forward Discovery Group, LLC, a DOE contractor, with proposals due by late November 2025. The solicitation emphasizes a best-value trade-off approach, where non-cost factors such as technical capability, past performance, and management approach are significantly more important than price alone. The contractual framework includes detailed technical and quality requirements, with key documents such as the Statement of Work, technical drawings, and specifications outlining the scope, performance criteria, and inspection procedures. The work must pass both factory acceptance testing and on-site acceptance at Fermilab, with responsibilities clearly divided between the contractor and Fermilab personnel. The contract incorporates standard terms and conditions, including provisions for government property management, liability limitations, insurance, and compliance with federal acquisition regulations. Offerors are required to submit comprehensive technical proposals, certifications, and certifications of representations and certifications, including small business status and regulatory compliance, with specific instructions on proposal formatting, submission deadlines, and evaluation criteria. The overall emphasis is on delivering a high-quality, reliable cryogenic component within a defined schedule, ensuring seamless integration into the upgraded accelerator infrastructure.
General Info
Place of Performance
ILSet-Aside
Documents
12AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- TS-405 VesselOpen now, due in 2 days
- Forging Tooling ProductionOpen now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Dec 21, 2025 to Nov 21, 2025. The notice description changed.
The notice description changed.
Response deadline changed from Nov 21, 2025 to Nov 28, 2025. The notice description changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) in support of the Proton Improvement Plan II (PIP-II) project. PIP-II is an upgrade to FNAL’s accelerator complex that will provide the world’s most intense high-energy neutrino beam for the Deep Underground Neutrino Experiment (DUNE). The PIP-II accelerator (Linac) employs superconducting radio frequency technology across multiple cryomodules and relies on a Cryogenic Distribution System (CDS) for helium supply and return. The Distribution Valve Box serves as a key subsystem of the CDS, regulating and controlling helium flow within the PIP-II Linac.
Proposals can be submitted directly to the Primary Contact listed on this Solicitation Notice and within the RFP Document.
October 29, 2025 - Edited SAM.GOV posting to the correct proposal due date from 12/21/25 to 11/21/25 in alignment with the RFP. All RFP Documents remain unchanged.
Amendment 1 - Extends the RFP Question Submission deadline from November 3, 2025 to November 5, 2025.
Amendment 2 - Extends the due date for proposals from November 21, 2025 to November 28, 2025. Amendment 2 also adds responses to questions submitted by potential offerors during the Question and Answer period.
More opportunities from Department Of Energy → Fermilab - DOE Contractor
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 750+ contractors already using CLEATUS
