Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

PL-26-494 Guenoc Valley Glamping Resort

Forecast
State & Local
Solicitation #
PL-25-494

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Butts Canyon Road, CA, 95461

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Northpoint Consulting FirmArcata, CA

Full Description

Show more
The applicant is seeking discretionary approval for Major Use Permit PL-25-494 for a glamping facility located at 1 21000 Guenoc Valley Road, Middletown CA 95461 (APN: 014-310-06). The proposed Project includes the development of an agritourism facility consisting of a short-term stay, nightly rental cabin campground with up to 104 dispersed portable tiny cabins for guests to enjoy. The tiny cabins can accommodate from one to four guests. Typical 1-bed, 2-bed, and cabin suite park model recreational units would be 399 sq. ft. or less. Each cabin park model unit includes a kitchenette, bathroom, air-conditioning, heating, and a connection to electricity, sewage, and drinking water systems. A private outdoor shower would be at each cabin. Approximately half of the 1-bed cabins will have a hot tub addition. Cabin suites are made up of two mobile units connected with an outdoor deck area including private hot tub and outdoor shower. The lodging room breakdown of 104 units is: (58) 1-bed cabins including Americans with Disabilities Act (ADA) standard accessible cabins, (25) 2-bed cabins, and (21) cabin suites. Cabin pads are approximately 1,068 sq. ft. and would include a parking space, outdoor seating area, and a picnic bench. The park model recreational units are Recreational Vehicle Industry Association (RVIA) certified. The guest communal facilities area is proposed to be a space for guest services, social gathering, recreation, entertainment, and events. The arrival area includes check-in/out, administrative offices, activities concierge, retail/shop, guest gear storage and shop to encompass about 4,000 sq. ft. The administrative front office work area would be about 1,260 sq. ft. The proposed guest communal facilities area, which includes a main stage and event hall, is approximately 5,085 sq. ft. The guest communal facilities food service space serves as a café and bar, small grab-and-go market, dining seating, outdoor games area, and small entertainment stage, taking up approximately 2,250 sq. ft. Two overlook event lawns are proposed to be located in the northern part and southern area of the project site accessed by trails. On-site recreation and outdoor activities areas would take up approximately 9,900 sq. ft. on the guest communal facilities area or portions of the project site. Recreation activities would consist of a family pool, adult pool, sundecks, and accessory structure for pool services. A pool maintenance area and pool pump room are also included for engineering and maintenance work. Additional recreation areas may include onsite trails, pickleball courts, sand volleyball court, bocce ball court, kayak and standup paddle board storage, and a tackle and bait shop. A fitness center and wellness treatment room would be approximately 2,450 sq. ft. of indoor and outdoor area. Recreation and outdoor activity areas and the fitness center amenities would be for Guenoc Valley Glamping Resort guests only. A Back-of-House (BOH) building for employee facilities and food service is proposed to be in an approximate 1,375 sq. ft. structure. Food service includes food and beverage storage and preparation. Employee facilities consist of a staff dining room, prep and serving area, lockers, and men and women’s shower and restroom. A housekeeping and laundry facility for the purpose of storage, workroom, and washing linens would be about 1,150 sq. ft. A receiving and purchasing area would consist of a truck dock, receiving holding area, trash facility, and security office, totaling an estimated 660 sq. ft. A total of up to twenty-six (26) employees are proposed to operate the Project at full occupancy since current Langtry Winery employees may also work at the Guenoc Valley Glamping Resort. Guests reserve campsites in advance online or in-person at the proposed arrival and administrative building. The Project also includes appurtenant development associated with the dispersed tiny cabins, including private on-site septic, drinking water, electrical, and roads and trails. Roads and trails would utilize existing roads and trails to the maximum extent practicable.

More opportunities from California → Lake County

Same awarding agency

NAICS: 238910
SLED
Seigler Springs North
Solicitation # PL-26-115
The Seigler Springs North project, identified by Major Use Permit PL-26-115/UP 21-17, is an approved cannabis cultivation operation located at 11615 and 11625 Seigler Springs North Road in Kelseyville, California. Approved by the Lake County Board of Supervisors on August 4, 2026, the project includes three A-Type 3 outdoor cultivation licenses with a total canopy of 130,680 square feet and a total cultivation area of 196,020 square feet. The site infrastructure consists of twenty-two 40 by 100 foot temporary light deprivation hoop-houses secured by a six-foot fence, two 8 by 40 foot shipping containers, a 40 by 20 foot compost area, and a 5,000-gallon fire suppression system. Additional facilities include one ADA-compliant portable restroom, a 15 by 15 foot trash enclosure, and five parking spaces, one of which is dedicated to ADA access. The project also includes a Type 13 Distributor Transport Only license for self-distribution and a Complex Grading Permit. Environmental compliance is managed under CEQA, with a Mitigated Negative Declaration confirming no significant environmental effects. Key requirements include the removal of approximately 128,000 square feet of vegetation, strictly limited to dead, dying, or diseased trees as identified by a certified forester or arborist. To mitigate habitat disturbance, the project establishes a 20-acre No Development Zone and requires the planting and protection of over 327 black oak saplings for seven years. The operation must adhere to California Public Resources Code sections 4290 and 4291 for defensible space, California Building Code Chapter 7A, and Lake County Air Quality Management District regulations. Operational mandates include maintaining Material Safety Data Sheets for all hazardous materials, storing pesticides in original labeled containers, and submitting a Site Management Plan under Order No. WQ 2019-001-DWQ for water quality compliance.
Site Preparation Contractors

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 111419
SLED
East Side Farms Expansion
Solicitation # PL-25-243
East Side Farms, Inc. has obtained discretionary approval from the County of Lake for Major Use Permit PL-25-243 to operate a commercial cannabis cultivation project in Middletown, California. The project is located across multiple parcels on Jerusalem Grade and features a maximum outdoor canopy of 50,560 square feet along with a Type 13 self-transport only distribution license. The site infrastructure includes two groundwater wells for irrigation, a 2,100 square foot greenhouse for immature plants, a 3,000 square foot processing building, and existing facilities for drying and harvest storage. The project was approved on July 9, 2026, following a Negative Declaration under the California Environmental Quality Act, indicating no significant environmental impacts. Operational compliance is governed by several comprehensive plans, including a Property Management Plan, a Biological Resources Assessment, and a Hydrogeologic Assessment confirming sustainable groundwater use. A specialized Drought Management Plan mandates water conservation measures and a minimum 10 percent reduction in canopy area and water use during declared emergencies. Strict environmental and safety protocols are required, including the use of bear-proof waste containers, secondary containment for petroleum products, and the maintenance of Material Safety Data Sheets for all hazardous materials. Additionally, the project must adhere to an Air Quality Management Plan with a specific Odor Response Program and ensure ADA compliance through the installation of permeable paver parking.
Other Food Crops Grown Under Cover

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Guenoc Valley Mixed-Use Planned Development Project
Solicitation # DA24-01
The Guenoc Valley Mixed-Use Planned Development Project, identified by solicitation number DA24-01, is a phased development in Middletown, Lake County, California, led by applicant Lotusland Investment Holdings Inc. The project encompasses the construction of resort facilities, including residential units, boutique hotels, neighborhood-serving retail, restaurants, open space, and off-site workforce housing. A key component of the development is the Anasu Farms Tentative Subdivision Map, which involves eight phases and the creation of 34 new parcels, including 30 resort residential, one commercial, and three facilities parcels, along with six peripheral parcels and a community clubhouse. Infrastructure work is a critical part of the project, specifically the Guenoc Ranch Tier 2 and 3 Roads, which involves widening and realigning existing roadways to meet safety standards, constructing new crossings, and repairing or installing 11 culverts. This work is governed by Lake and Streambed Alteration Agreement EPIMS Notification Number LAK-15321-R2 from the California Department of Fish and Wildlife. The project has undergone comprehensive environmental review under CEQA, with a certified Environmental Impact Report and adopted mitigation measures. Administrative approvals include a Development Agreement approved by the Lake County Board of Supervisors on October 21, 2025, and a Water Supply Assessment.
Land Subdivision

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
South Main Street and Soda Bay Road Widening and Bike Lanes ProjectThe South Main Street and Soda Bay Road Widening and Bike Lanes Project in Lake County, California, involves the rehabilitation and expansion of a roadway corridor located just south of Lakeport. The scope of work covers a 0.5-mile segment of South Main Street and approximately 0.8 miles of Soda Bay Road. Key infrastructure improvements include the construction of two 12-foot wide travel lanes, a continuous 12-foot wide center turning lane, and 8-foot wide paved shoulders designed as Class II bicycle facilities. Additional deliverables include the undergrounding of overhead utility lines, surface drainage improvements, and a safety correction to a horizontal curve on Soda Bay Road to increase its radius from 230 to 550 feet. The project is governed by CEQA and NEPA environmental standards, with recent addendums approved in November 2025 to allow for nighttime construction to maintain vehicle and business access. Environmental compliance includes a Streambed Alteration Agreement with the California Department of Fish and Wildlife and adherence to the Statewide NPDES General Construction Activity Permit. Construction is expected to span two seasons and may be implemented in two phases depending on funding. Critical scheduling constraints require that all in-channel and culvert work be performed during the dry season and outside the Clear Lake Hitch spawning season. The project is managed by Lake County, with oversight from the Lake County Department of Public Works and the Community Development Department.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Cobb Community Park General Plan of Conformity and Initial Study (PL-25-96)
Solicitation # PL-25-96
The Cobb Community Park Project (PL-25-96) is a phased development initiative by the County of Lake to establish a community park at 16540 State Highway 175 in Cobb, California. The project is designed to increase local access to open space and recreational facilities across four distinct phases. Phase 1 focuses on the western recreation area with a main parking lot, restrooms, picnic areas, and a dog run. Phase 2 involves the construction of a pedestrian bridge over Kelsey Creek, a retaining wall, and natural surface trails. Phase 3 centers on native species restoration and the removal of invasive species along the creek, while Phase 4 adds a secondary parking lot and concrete walk at the north corner along Golf Road. The project is governed by the California Environmental Quality Act (CEQA), with a Mitigated Negative Declaration confirming that the development will not have a significant environmental effect provided specific mitigation measures are followed. Key compliance requirements include adherence to Lake County's Oak Woodland Management Policy and the Municipal Code Grading Ordinance. Environmental protections are managed through a Mitigation Monitoring and Reporting Program, which includes botanical and nesting bird surveys, tree protection zones, and strict protocols for the discovery of archaeological resources. Operational and safety requirements are stringent, requiring the construction of emergency access routes capable of supporting 75,000-pound vehicles and maintaining a 15-foot vertical clearance. Fire safety is prioritized through the establishment of defensible space and the construction of emergency turnouts approved by the County Fire Marshal. Construction is restricted to Monday through Saturday, from 7:00 a.m. to 7:00 p.m., and is strictly prohibited on red flag warning days, Sundays, and federal holidays. The project is managed by the Lake County Community Development Department Planning Division, with Michelle Irace serving as the Senior Planner.
Environmental Consulting Services

POSTED

12 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS