Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PLC & SCADA System Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for PLC and SCADA System Integration involves performing core system integration for prime contractors on West Basin Municipal Water District projects. The scope of work includes transferring control logic from Modicon 984/Quantum controllers to new software, programming PLCs, and developing HMI screens and reports while maintaining functionality at the Emerson Ovation DCS level. The contractor is responsible for conducting factory acceptance tests, site acceptance tests, and baseline field loop checks, ensuring all deliverables adhere to IC&E Standards and cybersecurity policies to provide a fully programmed and tested system. The opportunity was posted on September 23, 2026, with a response deadline of November 5, 2026. Classified under NAICS code 541512, the project is managed by the Engineering Production agency in California. Interested parties can find further details through the West Basin procurement portal.

General Info

Subcontract for PLC and SCADA system integration for West Basin Municipal Water District.

Agency

California → Engineering - ProductionView Agency

NAICS

541512 - Computer Systems Design ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-DS-0149.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering - Production
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Engineering - Production
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs core system integration for prime contractors on West Basin Municipal Water District projects. Transfers control logic from Modicon 984/Quantum controllers to new software, programs PLCs, and develops HMI screens and reports. Maintains functionality at the Emerson Ovation DCS level. Conducts FAT, SAT, and baseline field loop checks. Adheres to IC&E Standards and cybersecurity policies. Delivers a programmed and tested PLC/SCADA system.

Similar Contracts

Same NAICS industry code

More opportunities from California → Engineering - Production

Same awarding agency

NAICS: 541512
New
SLED
Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements
Solicitation # RFP-DS-0149
West Basin Municipal Water District has issued solicitation RFP-DS-0149 to engage a System Integrator for the replacement of three obsolete process-level Programmable Logic Controllers (PLCs) and associated SCADA equipment at the Torrance Refinery Water Recycling Plant. The project aims to mitigate the high risk of unplanned facility shutdowns by replacing existing Modicon 984 and Quantum controllers with at least three Modicon M580s. The scope of work includes transferring control logic, designing network and panel drawings, developing HMI screens, and performing comprehensive testing, including baseline field loop checks, Factory Acceptance Testing (FAT), and Site Acceptance Testing (SAT). All work must adhere to the District's specific instrumentation, control, and electrical standards, as well as cybersecurity policies and California prevailing wage laws. Proposals are due by November 5, 2026, and will be evaluated on a 100-point scale based on the best overall value. The District provides scoring incentives for Small, Local, and Veteran Owned Business Enterprises, with potential point additions or price reductions for qualifying firms. Selected consultants will be required to provide professional qualifications for key personnel and maintain specific insurance minimums, including 2 million dollars in commercial general liability. The contract will be administered on a time-and-material basis, with monthly invoicing submitted to the District's Carson, California office.
Computer Systems Design Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 811310
SLED
On-Call Pump and Motor Repairs, Rebuilds, and Replacement Services
Solicitation # RFP-TH-0143
West Basin Municipal Water District is soliciting proposals for an on-call agreement to provide pump and motor mechanical and electrical repair, rebuild, and replacement services. The contract is anticipated to begin in October 2026 with an initial one-year term and a possible one-year extension, featuring a total not-to-exceed value of 1,000,000 dollars. The scope of work includes the disconnection, removal, transport, repair, and re-installation of critical equipment across various treatment facilities, with a requirement that all rebuilds meet manufacturer specifications using OEM parts. Contractors must adhere to strict emergency response times, including responding to requests within one hour and providing onsite support within 12 hours. Proposals are due by October 1, 2026, and will be evaluated on a 100-point scale based on qualifications, experience, safety records, and price. Pricing is submitted via a specific bid response table for various repair scenarios, with materials paid at actual cost plus a maximum 10 percent markup. Award incentives are available for Small, Local, or Veteran Owned Business Enterprises. Selected contractors must comply with California prevailing wage laws and maintain comprehensive insurance coverage, including 2,000,000 dollars in commercial general liability and professional liability per occurrence. Final acceptance requires the project site to be restored to a clean and safe condition and the successful completion of post-installation performance testing.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

22 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement